# US 11,120,411 B2 · Model predictive maintenance system with incentive incorporation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 11,120,411 B2
- Document ID: US11120411B2
- Status: Granted
- Kind: B2
- Application number: 16/449,198
- Filed: 2019-06-21
- Published: 2019-10-10
- Granted: 2021-09-14
- Earliest claimed: 2017-05-25
- Assignees: Johnson Controls Tyco IP Holdings LLP
- Applicants: Johnson Controls Technology Company
- Inventors: Robert D. Turney; Sudhi R. Sinha; Masayuki Nonaka; Zhizhong Pang; Yoshiko Watanabe; Mohammad N. Elbsat; Michael J. Wenzel
- Web page: https://patentgrep.com/patent/US11120411B2

## CPC

- G06Q 10/20: Administration of product repair or maintenance
- G05B 13/048: {using a predictor}
- G06Q 10/06315: {Needs-based resource requirements planning or analysis}
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

A model predictive maintenance system for building equipment including an equipment controller to operate the building equipment to affect a variable state or condition in a building. The system includes an operational cost predictor to predict a cost of operating the building equipment over a duration of an optimization period, a maintenance cost predictor to predict a cost of performing maintenance on the building equipment, and a cost incentive manager to determine whether any cost incentives are available and, in response to a determination that cost incentives are available, identify the cost incentives. The system includes an objective function optimizer to optimize an objective function to predict a total cost associated with the building equipment over the duration of the optimization period. The objective function includes the predicted cost of operating the building equipment, the predicted cost of performing maintenance on the building equipment, and, if available, the cost incentives.

## Claims

### Claim 1

A model predictive maintenance system for building equipment, the system comprising:
processing circuitry configured to:
operate the building equipment to affect a variable state or condition in a building;
predict a cost of operating the building equipment over a duration of an optimization period;
predict a cost of performing maintenance on the building equipment over the duration of the optimization period;
determine whether any cost incentives are available;
in response to a determination that one or more cost incentives are available, identify the one or more cost incentives associated with performing maintenance on the building equipment;
optimize an objective function to predict a total cost associated with the building equipment over the duration of the optimization period, the objective function comprising the predicted cost of operating the building equipment and the predicted cost of performing maintenance on the building equipment, the objective function further comprising the one or more cost incentives associated with performing maintenance on the building equipment if the one or more cost incentives are available.

### Claim 2 (depends on 1)

The model predictive maintenance system of claim 1, wherein the processing circuitry is further configured to predict a cost of purchasing or replacing the building equipment over the duration of the optimization period, wherein the objective function further comprises the predicted cost of purchasing or replacing the building equipment.

### Claim 3 (depends on 2)

The model predictive maintenance system of claim 2, wherein the processing circuitry is further configured to determine one or more cost incentives associated with purchasing or replacing one or more devices of the building equipment.

### Claim 4 (depends on 1)

The model predictive maintenance system of claim 1, wherein the processing circuitry is further configured to dynamically update the objective function on a real-time basis based on closed-loop feedback from the building equipment.

### Claim 5 (depends on 1)

The model predictive maintenance system of claim 1, wherein the processing circuitry is configured to:
identify a time period for each of the one or more cost incentives when each of the one or more cost incentives are available; and
wherein the objective function further comprises the time period for each of the one or more cost incentives.

### Claim 6 (depends on 1)

The model predictive maintenance system of claim 1, wherein the one or more cost incentives each define one or more requirements to achieve the cost incentive.

### Claim 7 (depends on 1)

The model predictive maintenance system of claim 1, wherein the processing circuitry is further configured to:
determine an amount of revenue and a particular maintenance activity associated with each of the one or more cost incentives; and
optimize the objective function to determine whether and when each particular maintenance activity should be performed during the optimization period to achieve the amount of revenue associated therewith, wherein optimizing the objective function comprises minimizing the predicted total cost over the duration of the optimization period.

### Claim 8

A method for performing model predictive maintenance for building equipment, the method comprising:
operating the building equipment to affect a variable state or condition in a building;
predicting a cost of operating the building equipment over a duration of an optimization period;
predicting a cost of performing maintenance on the building equipment over the duration of the optimization period;
determining whether any cost incentives are available;
in response to a determination that one or more cost incentives are available, identifying the one or more cost incentives associated with performing a maintenance on the building equipment; and
optimizing an objective function to predict a total cost associated with the building equipment over the duration of the optimization period, the objective function comprising the predicted cost of operating the building equipment and the predicted cost of performing maintenance on the building equipment, the objective function further comprising the one or more cost incentives associated with performing maintenance on the building equipment if the one or more cost incentives are available.

### Claim 9 (depends on 8)

The method of claim 8, further comprising predicting a cost of purchasing or replacing the building equipment over the duration of the optimization period, wherein the objective function further comprises the predicted cost of purchasing or replacing the building equipment.

### Claim 10 (depends on 9)

The method of claim 9, further comprising determining one or more cost incentives associated with purchasing or replacing one or more devices of the building equipment.

### Claim 11 (depends on 9)

The method of claim 9, wherein optimizing the objective function further comprises minimizing the objective function to determine whether and when to perform each particular type of maintenance to minimize the total cost associated with the building equipment over the duration of the optimization period.

### Claim 12 (depends on 8)

The method of claim 8, wherein the one or more cost incentives each define one or more requirements to achieve the cost incentive.

### Claim 13 (depends on 8)

The method of claim 8, further comprising:
determining an amount of revenue and a particular maintenance activity associated with each of the one or more cost incentives; and
wherein optimizing the objective function further comprises:
determining whether and when each particular maintenance activity should be performed during the optimization period to achieve the amount of revenue associated therewith; and
minimizing the predicted total cost over the duration of the optimization period.

### Claim 14

A model predictive maintenance system for building equipment, the system comprising:
processing circuitry configured to:
operate the building equipment to affect a variable state or condition in a building;
predict a cost of operating the building equipment over a duration of an optimization period;
predict a cost of performing maintenance on the building equipment over the duration of the optimization period;
determine whether any cost incentives are available;
in response to a determination that one or more cost incentives are available, identify the one or more cost incentives associated with performing maintenance on the building equipment; and
optimize an objective function to determine an optimal strategy for operating and maintaining the building equipment over the duration of the optimization period, the objective function comprising the predicted cost of operating the building equipment and the predicted cost of performing maintenance on the building equipment, the objective function further comprising the one or more cost incentives associated with performing maintenance on the building equipment if the one or more cost incentives are available.

### Claim 15 (depends on 14)

The model predictive maintenance system of claim 14, wherein the processing circuitry is further configured to predict a cost of purchasing or replacing the building equipment over the duration of the optimization period, wherein the objective function further comprises the predicted cost of purchasing or replacing the building equipment.

### Claim 16 (depends on 15)

The model predictive maintenance system of claim 15, wherein the processing circuitry is configured to determine one or more cost incentives associated with purchasing or replacing one or more devices of the building equipment.

### Claim 17 (depends on 14)

The model predictive maintenance system of claim 14, wherein the processing circuitry is further configured to dynamically update the objective function on a real-time basis based on closed-loop feedback from the building equipment.

### Claim 18 (depends on 14)

The model predictive maintenance system of claim 14, wherein the processing circuitry is configured to:
identify a time period for each of the one or more cost incentives when each of the one or more cost incentives are available; and
wherein the objective function further comprises the time period for each of the one or more cost incentives.

### Claim 19 (depends on 14)

The model predictive maintenance system of claim 14, wherein the one or more cost incentives each define one or more requirements to achieve the cost incentive.

### Claim 20 (depends on 14)

The model predictive maintenance system of claim 14, wherein the processing circuitry is further configured to:
determine an amount of revenue and a particular maintenance activity associated with each of the one or more cost incentives; and
optimize the objective function to determine whether and when each particular maintenance activity should be performed during the optimization period to achieve the amount of revenue associated therewith, wherein optimizing the objective function comprises minimizing a predicted total cost over the duration of the optimization period.