# US 11,120,347 B2 · Optimizing data-to-learning-to-action

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 11,120,347 B2
- Document ID: US11120347B2
- Status: Granted
- Kind: B2
- Application number: 16/043,354
- Filed: 2018-07-24
- Published: 2018-11-15
- Granted: 2021-09-14
- Earliest claimed: 2006-01-10
- Assignees: ManyWorlds, Inc.
- Applicants: Steven Dennis Flinn; Naomi Felina Moneypenny
- Inventors: Steven Dennis Flinn; Naomi Felina Moneypenny
- Web page: https://patentgrep.com/patent/US11120347B2

## CPC

- G06N 5/04: Inference or reasoning models
- G06N 5/022: Knowledge engineering; Knowledge acquisition
- G06N 5/045: Explanation of inference; Explainable artificial intelligence [XAI]; Interpretable artificial intelligence
- G06N 7/01: Probabilistic graphical models, e.g. probabilistic networks
- G06N 20/00: Machine learning
- G06N 20/10: using kernel methods, e.g. support vector machines [SVM]
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS

## Abstract

An optimizing data-to-learning-to-action method and system identifies uncertainties embodied as probability distributions that influence a sequence of decisions. The uncertainties are mapped to a simulation of a computer-based infrastructure that supports the execution of the decisions. Actions with respect to the infrastructure that are expected to reduce the uncertainties are simulated. The probability distributions are updated accordingly for each simulated action and an associated net value of information for each simulated action is generated. The action with the greatest net value of information is implemented and the simulated infrastructure is updated accordingly. The process may then be re-run based upon the updated simulated infrastructure.

## Claims

### Claim 1

A method comprising:
identifying a sequence of decisions;
identifying one or more uncertainties that influence the sequence of decisions;
embodying the one or more uncertainties into one or more computer-implemented probability distributions;
applying a computer-implemented system that maps the one or more uncertainties to a simulation of a first infrastructure that comprises a plurality of computer-implemented systems, wherein the first infrastructure is applied to support executing the sequence of decisions;
simulating by a computer-implemented system an implementation of each of a first plurality of computer-based options, wherein each of the first plurality of computer-based options comprises one or more actions with respect to the first infrastructure that are expected to reduce at least one of the one or more uncertainties;
updating using a computer-implemented system at least one of the one or more computer-implemented probability distributions for each of the simulated first plurality of computer-based options based upon the associated expected reduction of the at least one of the one or more uncertainties;
generating by a computer-implemented system an expected net value of information associated with each of the first plurality of computer-based options, wherein the expected net value of information associated with the each of the first plurality of computer-based options is generated by applying the associated updated at least one of the one or more probability distributions;
determining by application of a computer-implemented system an option of the first plurality of computer-based options that has a greatest expected net value of information of the expected net values of information that are associated with each of the first plurality of computer-based options; and
updating the simulation of the first infrastructure based upon implementing the determined computer-based option that results in a second infrastructure.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
determining a value of perfect information associated with resolving the one or more uncertainties.

### Claim 3 (depends on 1)

The method of claim 1, further comprising:
applying the computer-implemented system that maps the one or more uncertainties to the simulation of the first infrastructure, wherein the first infrastructure that is simulated comprises a computer-implemented search function.

### Claim 4 (depends on 1)

The method of claim 1, further comprising:
updating using the computer-implemented system the at least one of the one or more computer-implemented probability distributions for the each of the simulated first plurality of computer-based options based upon the associated expected reduction of the at least one of the one or more uncertainties, wherein the updating is performed by application of a Bayesian method.

### Claim 5 (depends on 1)

The method of claim 1, further comprising:
generating by the computer-implemented system the expected net value of information associated with the each of the first plurality of computer-based options, wherein each of the net expected net values of information is generated by application of a computer-based monte carlo simulation.

### Claim 6 (depends on 1)

The method of claim 1, further comprising:
generating by the computer-implemented system the expected net value of information associated with the each of the first plurality of computer-based options, wherein each of the expected net values of information is generated by a look-ahead infrastructure option model.

### Claim 7 (depends on 1)

The method of claim 1, further comprising:
simulating by the computer-implemented system the second infrastructure;
simulating by the computer-implemented system an implementation of each of a second plurality of computer-based options, wherein each of the second plurality of computer-based options comprises one or more actions with respect to the second infrastructure that are expected to reduce the at least one of the one or more uncertainties;
determining by application of the computer-implemented system an option of the second plurality of computer-based options that has a greatest expected net value of information of the expected net values of information that are associated with each of the second plurality of computer-based options; and
updating the simulation of the second infrastructure based upon implementing the determined computer-based infrastructure option of the second plurality of computer-based options.

### Claim 8

A system comprising one or more processor-based devices configured to:
access one or more computer-implemented probability distributions that embody one or more uncertainties that influence a sequence of decisions;
map the one or more uncertainties to a simulated first infrastructure that comprises a plurality of computer-implemented systems, wherein the first infrastructure is applied to support executing the sequence of decisions;
simulate an implementation of each of a first plurality of computer-based options, wherein each of the first plurality of computer-based options comprises one or more actions with respect to the first infrastructure that are expected to reduce at least one of the one or more uncertainties;
update at least one of the one or more computer-implemented probability distributions for each of the simulated first plurality of computer-based options based upon the associated expected reduction of the at least one of the one or more uncertainties;
generate an expected net value of information associated with each of the first plurality of computer-based options, wherein the expected net value of information associated with the each of the first plurality of computer-based options is generated by applying the associated updated at least one of the one or more probability distributions;
determine an option of the first plurality of computer-based options that has a greatest expected net value of information of the expected net values of information that are associated with each of the first plurality of computer-based options; and
update the simulated first infrastructure based upon implementing the determined computer-based option that results in a second infrastructure.

### Claim 9 (depends on 8)

The system of claim 8, further comprising the one or more processor-based devices configured to:
determine a value of perfect information associated with resolving the one or more uncertainties.

### Claim 10 (depends on 8)

The system of claim 8, further comprising the one or more processor-based devices configured to:
map the one or more uncertainties to the simulated first infrastructure, wherein the first infrastructure comprises a process control system.

### Claim 11 (depends on 8)

The system of claim 8, further comprising the one or more processor-based devices configured to:
update the at least one of the one or more computer-implemented probability distributions for the each of the simulated first plurality of computer-based options based upon the associated expected reduction of the at least one of the one or more uncertainties, wherein the updating is performed by application of a Bayesian method.

### Claim 12 (depends on 8)

The system of claim 8, further comprising the one or more processor-based devices configured to:
generate the expected net value of information associated with the each of the first plurality of computer-based options, wherein each of the net expected net values of information is generated by application of a computer-based monte carlo simulation.

### Claim 13 (depends on 8)

The system of claim 8, further comprising the one or more processor-based devices configured to:
generate the expected net value of information associated with the each of the first plurality of computer-based options, wherein each of the net expected net values of information is generated by a look-ahead infrastructure option model.

### Claim 14 (depends on 8)

The system of claim 8, further comprising the one or more processor-based devices configured to:
simulate the second infrastructure;
simulate an implementation of each of a second plurality of computer-based options, wherein each of the second plurality of computer-based options comprises one or more actions with respect to the second infrastructure that are expected to reduce the at least one of the one or more uncertainties;
determine an option of the second plurality of computer-based options that has a greatest expected net value of information of the expected net values of information that are associated with each of the second plurality of computer-based options; and
update the updated simulated infrastructure based upon implementing the determined computer-based infrastructure option of the second plurality of computer-based options.

### Claim 15

An article comprising a non-transitory computer-readable medium storing instructions for enabling a processor-based system to:
access one or more computer-implemented probability distributions that embody one or more uncertainties that influence a sequence of decisions;
map the one or more uncertainties to a simulated first infrastructure that comprises a plurality of computer-implemented systems, wherein the first infrastructure is applied to support executing the sequence of decisions;
simulate an implementation of each of a first plurality of computer-based options, wherein each of the first plurality of computer-based options comprises one or more actions with respect to the first infrastructure that are expected to reduce at least one of the one or more uncertainties;
update at least one of the one or more computer-implemented probability distributions for each of the simulated first plurality of computer-based options based upon the associated expected reduction of the at least one of the one or more uncertainties;
generate an expected net value of information associated with each of the first plurality of computer-based options, wherein the expected net value of information associated with the each of the first plurality of computer-based options is generated by applying the associated updated at least one of the one or more probability distributions;
determine an option of the first plurality of computer-based options that has a greatest expected net value of information of the expected net values of information that are associated with each of the first plurality of computer-based options; and
update the simulated first infrastructure based upon implementing the determined computer-based option that results in a second infrastructure.

### Claim 16 (depends on 15)

The article of claim 15, further storing instructions for enabling the processor-based system to:
determine a value of perfect information associated with resolving the one or more uncertainties.

### Claim 17 (depends on 15)

The article of claim 15, further storing instructions for enabling the processor-based system to:
map the one or more uncertainties to the simulated first infrastructure, wherein the first infrastructure comprises a computer-implemented knowledge base.

### Claim 18 (depends on 15)

The article of claim 15, further storing instructions for enabling the processor-based system to:
update the at least one of the one or more computer-implemented probability distributions for the each of the simulated first plurality of computer-based options based upon the associated expected reduction of the at least one of the one or more uncertainties, wherein the updating is performed by application of a Bayesian method.

### Claim 19 (depends on 15)

The article of claim 15, further storing instructions for enabling the processor-based system to:
generate the expected net value of information associated with the each of the first plurality of computer-based options, wherein each of the net expected net values of information is generated by application of a computer-based monte carlo simulation.

### Claim 20 (depends on 15)

The article of claim 15, further storing instructions for enabling the processor-based system to:
simulate the second infrastructure;
simulate an implementation of each of a second plurality of computer-based options, wherein each of the second plurality of computer-based options comprises one or more actions with respect to the second infrastructure that are expected to reduce the at least one of the one or more uncertainties;
determine an option of the second plurality of computer-based options that has a greatest expected net value of information of the expected net values of information that are associated with each of the second plurality of computer-based options; and
update the updated simulated infrastructure based upon implementing the determined computer-based infrastructure option of the second plurality of computer-based options.
