# US 11,119,823 B1 · Method and system for job prioritization in backup windows

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 11,119,823 B1
- Document ID: US11119823B1
- Status: Granted
- Kind: B1
- Application number: 16/925,672
- Filed: 2020-07-10
- Granted: 2021-09-14
- Earliest claimed: 2020-05-27
- Assignees: EMC IP Holding Company LLC
- Applicants: EMC IP Holding Company LLC
- Inventors: Mahesh Reddy Appireddygari Venkataramana; Chetan Battal; Swaroop Shankar D H; Shelesh Chopra
- Web page: https://patentgrep.com/patent/US11119823B1

## CPC

- G06F 9/4881: {Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues}
- G06F 9/4887: {involving deadlines, e.g. rate based, periodic}
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

A method and system for performing jobs that includes obtaining a current status of a job scheduler queue, obtaining policy level information comprising one or more weightages for each job in the job scheduler queue, and obtaining a current number of available streams for processing jobs in the job scheduler queue. The method and system includes calculating a distance between a first job in the job scheduler queue and the remaining jobs in the job scheduler queue using the one or more weightages to obtain a plurality of distances. The remaining jobs are reordered in the job scheduler queue based on the calculated distances. After the reordering, the first job is scheduled in the job scheduler queue and, after the scheduling of the first job, removing the first job from the job scheduler queue.

## Claims

### Claim 1

A method for performing jobs, the method comprising:
obtaining a current status of a job scheduler queue;
obtaining policy-level information comprising one or more weightages for each job in the job scheduler queue;
obtaining a current number of available streams for processing jobs in the job scheduler queue;
calculating a distance between a first job in the job scheduler queue and the remaining jobs in the job scheduler queue using the one or more weightages to obtain a plurality of distances;
reordering the remaining jobs in the job scheduler queue based on the calculated distances;
scheduling, after the reordering, the first job in the job scheduler queue; and
after scheduling the first job, removing the first job from the job scheduler queue.

### Claim 2 (depends on 1)

The method of claim 1, wherein the weightage comprises a policy weightage and an application weightage.

### Claim 3 (depends on 1)

The method of claim 1, wherein the calculated distances is further based on the current number of available streams and a number of jobs in the job scheduler queue.

### Claim 4 (depends on 1)

The method of claim 1, wherein the remaining jobs in the job scheduler queue are arranged in decreasing order of the calculated distances.

### Claim 5 (depends on 1)

The method of claim 1, wherein the jobs in the job scheduler queue are a part of a backup process.

### Claim 6 (depends on 1)

The method of claim 1, wherein the current status of the job scheduler queue comprises a time factor for each job in the job scheduler queue.

### Claim 7 (depends on 6)

The method of claim 6, wherein a calculated distance of the calculated distances is calculated using the following equation:
d
=
1
N
·
S
⁢
(
W
j
·
T
j
-
W
i
·
T
i
)
2
where d is the distance between two jobs, N is a number of jobs in the job scheduler queue, S is the number of available streams, W is the weightage of each job, and T is the time factor for the corresponding job.

### Claim 8

A non-transitory computer: readable medium comprising computer-readable program code, which when executed by a computer processor enables the computer processor to perform a method for performing jobs, the method comprising:
obtaining a current status of a job scheduler queue;
obtaining policy-level information comprising one or more weightages for each job in the job scheduler queue;
obtaining a current number of available streams for processing jobs in the job scheduler queue;
calculating a distance between a first job in the job scheduler queue and the remaining jobs in the job scheduler queue using the one or more weightages to obtain a plurality of distances;
reordering the remaining jobs in the job scheduler queue based on the calculated distances;
scheduling, after the reordering, the first job in the job scheduler queue; and
after scheduling the first job, removing the first job from the job scheduler queue.

### Claim 9 (depends on 8)

The non-transitory computer-readable medium of claim 8, wherein the weightage comprises a policy weightage and an application weightage.

### Claim 10 (depends on 8)

The non-transitory computer-readable medium of claim 8, wherein the calculated distances is further based on the current number of available streams and a number of jobs in the job scheduler queue.

### Claim 11 (depends on 8)

The non-transitory computer-readable medium of claim 8, wherein the remaining jobs in the job scheduler queue are arranged in decreasing order of the calculated distances.

### Claim 12 (depends on 8)

The non-transitory computer-readable medium of claim 8, wherein the jobs in the job scheduler queue are a part of a backup process.

### Claim 13 (depends on 8)

The non-transitory computer-readable medium of claim 8, wherein the current status of the job scheduler queue comprises a time factor for each job in the job scheduler queue.

### Claim 14 (depends on 13)

The non-transitory computer: readable medium of claim 13, wherein a calculated distance of the calculated distances is calculated using the following equation:
d
=
1
N
·
S
⁢
(
W
j
·
T
j
-
W
i
·
T
i
)
2
where d is the distance between two jobs, N is a number of jobs in the job scheduler queue, S is the number of available streams, W is the weightage of each job, and T is the time factor for the corresponding job.

### Claim 15

A system, comprising:
a backup storage device comprising a processors with memory configured to:
obtaining a current status of a job scheduler queue;
obtaining policy-level information comprising one or more weightages for each job in the job scheduler queue;
obtaining a current number of available streams for processing jobs in the job scheduler queue;
calculating a distance between a first job in the job scheduler queue and the remaining jobs in the job scheduler queue using the one or more weightages to obtain a plurality of distances;
reordering the remaining jobs in the job scheduler queue based on the calculated distances;
scheduling, after the reordering, the first job in the job scheduler queue; and
after scheduling the first job, removing the first job from the job scheduler queue.

### Claim 16 (depends on 15)

The system of claim 15, wherein the weightage comprises a policy weightage and an application weightage.

### Claim 17 (depends on 15)

The system of claim 15, wherein the calculated distances is further based on the current number of available streams and a number of jobs in the job scheduler queue.

### Claim 18 (depends on 15)

The system of claim 15, wherein the remaining jobs in the job scheduler queue are arranged in decreasing order of the calculated distances.

### Claim 19 (depends on 15)

The system of claim 15, wherein the jobs in the job scheduler queue are a part of a backup process.

### Claim 20 (depends on 15)

The system of claim 15, wherein a calculated distance of the calculated distances is calculated using the following equation:
d
=
1
N
·
S
⁢
(
W
j
·
T
j
-
W
i
·
T
i
)
2
where d is the distance between two jobs, N is a number of jobs in the job scheduler queue, S is the number of available streams, W is the weightage of each job, and T is a time factor for the corresponding job.
