# US 11,119,128 B2 · Loopback testing of electric power protection systems

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 11,119,128 B2
- Document ID: US11119128B2
- Status: Granted
- Kind: B2
- Application number: 16/919,896
- Filed: 2020-07-02
- Published: 2021-04-15
- Granted: 2021-09-14
- Earliest claimed: 2019-10-10
- Assignees: Schweitzer Engineering Laboratories, Inc.
- Applicants: Schweitzer Engineering Laboratories, Inc.
- Inventors: Edmund O. Schweitzer, III; David E. Whitehead; Krishnanjan Gubba Ravikumar; Austin Edward Wade
- Web page: https://patentgrep.com/patent/US11119128B2

## CPC

- G01R 19/2513: {Arrangements for monitoring electric power systems, e.g. power lines or loads; Logging}
- G05B 23/0256: {injecting test signals and analyzing monitored process response, e.g. injecting the test signal while interrupting the normal operation of the monitored system; superimposing the test signal onto a control signal during normal operation of the monitored system}
- H02J 13/12: Monitoring network conditions, e.g. electrical magnitudes or operational status
- H02J 13/1331: {using wireless data transmission}
- Y02E 60/00: Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y04S 10/30: State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge
- Y04S 40/126: using wireless data transmission
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

Systems and methods to test an electric power delivery system include a communication subsystem to transmit test signals to one or more merging units, a test subsystem to transmit a test data stream to the one or more merging units via the communication subsystem, and a processor subsystem to receive looped back data from the one or more merging unit in response to the transmitted test data stream and to determine an operating condition based on the looped back data.

## Claims

### Claim 1

A system to test a primary protection relay of an electric power delivery system, comprising:
a first merging unit, comprising:
a communication subsystem, comprising:
a monitored equipment interface to receive information from monitored equipment; and
a relay interface, comprising:
a first port to receive information from a protective relay; and
a second port to transmit information to the protective relay;
a test mode selection subsystem to allow a user to select one of an operating mode and a testing mode; and
a routing subsystem to route information from the monitored equipment interface through the first merging unit and to the relay interface in the operating mode, and to route a test data stream provided via the protective relay from the first port to the second port in the testing mode while bypassing the monitored equipment interface to provide a signal in response to the test data stream back to the protective relay;
a protective relay, comprising:
a protective relay communication subsystem in communication with the relay interface; and
a protective action subsystem to perform at least one protective action in response to the test data stream; and
a supervisory unit, comprising:
a testing unit to produce the test data stream; and
a supervisory unit communication subsystem in communication with the primary protective relay.

### Claim 2 (depends on 1)

The system of claim 1, wherein the protective relay is to communicate the protective action to the testing unit.

### Claim 3 (depends on 1)

The system of claim 1, wherein the test data stream comprises a plurality of time-aligned instructions.

### Claim 4 (depends on 3)

The system of claim 3, further comprising a second merging unit, and wherein the first merging unit and the second merging unit are to each execute a subset of the plurality of time-aligned instructions at predetermined times specified by the plurality of time-aligned instructions.

### Claim 5 (depends on 1)

The system of claim 1, wherein the test mode selection subsystem comprises at least one of a physical input or a logical input to allow a user to select one of the operating mode and the testing mode.

### Claim 6 (depends on 1)

The system of claim 1, wherein the test data stream passes from the first port to the second port substantially unmodified by the merging unit.

### Claim 7 (depends on 1)

The system of claim 1, wherein the supervisory system is further to parse a testing file to identify a plurality of instructions to communicate to the merging unit and to generate the test data stream based on the testing file.

### Claim 8 (depends on 1)

The system of claim 1, wherein the test data stream is to be communicated from the merging unit to the protective relay via a communication link utilized in the operating mode.

### Claim 9

A method of testing a protection relay of an electric power delivery system, the method comprising:
placing one or more merging units in a normal mode;
in the normal mode, receiving signals from the electric power delivery system at a communication subsystem of the one or more merging units and transmitting the signals to the protective relay;
placing the one or more merging units in a testing mode;
transmitting test signals provided by a supervisory unit to the one or more merging units from the protection relay;
receiving the test signals at the communication subsystem of the one or more merging units;
in the testing mode, looping the test signals through the communication subsystem from a first port to receive information from the protective relay and back to the protection relay through a second port to transmit information to the protective relay; and
determining an operating condition of the electric power delivery system using the looped test signals from the one or more merging units.

### Claim 10 (depends on 9)

The method of claim 9, further comprising receiving a testing file from the supervisory unit to generate the test signals with the protection relay.

### Claim 11 (depends on 9)

The method of claim 9, further comprising providing individual test signals to multiple merging units of the one or more merging units.

### Claim 12 (depends on 9)

The method of claim 9, further comprising automatically entering into a test mode with the protection relay when receiving the looped test signals form the one or more merging units.

### Claim 13 (depends on 12)

The method of claim 12, further comprising verifying if the one or more merging units are in the testing mode with the protection relay.