# US 11,119,009 B2 · Abnormality sign notifying system, method, and program

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 11,119,009 B2
- Document ID: US11119009B2
- Status: Granted
- Kind: B2
- Application number: 16/149,788
- Filed: 2018-10-02
- Published: 2019-05-30
- Granted: 2021-09-14
- Earliest claimed: 2017-11-24
- Assignees: Toyota Jidosha Kabushiki Kaisha
- Applicants: Toyota Jidosha Kabushiki Kaisha
- Inventors: Shun Sato
- Web page: https://patentgrep.com/patent/US11119009B2

## CPC

- G01M 99/005: {Testing of complete machines, e.g. washing-machines or mobile phones (testing of machine parts G01M13/00; testing of electric apparatus or components G01R31/50)}
- G01M: TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR

## Abstract

An abnormality sign notifying system includes: an abnormality occurrence time estimation unit configured to estimate an abnormality occurrence time at which an abnormality occurs in a facility based on information related to an operation of the facility installed in a production line; an abnormality elimination period estimation unit configured to estimate an abnormality elimination period required for eliminating the abnormality of the facility based on characteristic information related to a part, which is a replacement required part, necessary for eliminating the abnormality of the facility; a notifying time setting unit configured to set a notifying time at which a sign of the abnormality of the facility is notified at the abnormality elimination period before the abnormality occurrence time; and a notifying unit configured to notify the sign of the abnormality of the facility at the notifying time.

## Claims

### Claim 1

An abnormality sign notifying system comprising:
an abnormality occurrence time estimation unit configured to estimate an abnormality occurrence time at which an abnormality occurs in a facility based on information related to an operation of the facility installed in a production line;
an abnormality elimination period estimation unit configured to estimate an abnormality elimination period required for eliminating the abnormality of the facility based on characteristic information related to a part necessary for eliminating the abnormality of the facility;
a notifying time setting unit configured to set a notifying time at which a sign of the abnormality of the facility is notified at the abnormality elimination period before the abnormality occurrence time; and
a notifying unit configured to notify the sign of the abnormality of the facility at the notifying time.

### Claim 2 (depends on 1)

The abnormality sign notifying system according to claim 1, wherein when the abnormality elimination period is less than a predetermined number of days, the abnormality elimination period estimation unit estimates the abnormality elimination period in such a way that the abnormality elimination period becomes the predetermined number of days.

### Claim 3 (depends on 1)

The abnormality sign notifying system according to claim 1, wherein
the characteristic information includes information related to whether the part is in stock, and
the abnormality elimination period estimation unit estimates the abnormality elimination period in such a way that the abnormality elimination period becomes longer when the part is out of stock than the abnormality elimination period when the part is in stock.

### Claim 4 (depends on 3)

The abnormality sign notifying system according to claim 3, wherein
the abnormality elimination period estimation unit estimates the abnormality elimination period in such a way that the abnormality elimination period becomes longer when the part is out of stock than the abnormality elimination period when the part is in stock at least for a period necessary to procure the part.

### Claim 5 (depends on 1)

The abnormality sign notifying system according to claim 1, wherein
the characteristic information includes information related to a weight of the part, and
the abnormality elimination period estimation unit estimates the abnormality elimination period such that the abnormality elimination period is longer when the weight is greater than or equal to a predetermined weight than the abnormality elimination period when the weight is less than the predetermined weight.

### Claim 6 (depends on 5)

The abnormality sign notifying system according to claim 5, wherein the abnormality elimination period estimation unit estimates the abnormality elimination period such that the abnormality elimination period is longer when the weight is greater than or equal to the predetermined weight than the abnormality elimination period when the weight is less than the predetermined weight at least for a period required for carrying the part out from the production line and carrying the part into the production line.

### Claim 7 (depends on 5)

The abnormality sign notifying system according to claim 5, wherein when the weight of the part is greater than or equal to the predetermined weight, and there is a long suspension period during which an operation of the production line stops continuously at least for three days before the abnormality occurrence time, the notifying time setting unit sets the notifying time such that the notifying time is at the abnormality elimination period before the abnormality occurrence time and the abnormality elimination period overlaps the long suspension period.

### Claim 8 (depends on 7)

The abnormality sign notifying system according to claim 7, wherein the notifying time setting unit sets the notifying time at the abnormality elimination period before an end date of the long suspension period.

### Claim 9 (depends on 5)

The abnormality sign notifying system according to claim 5, wherein
the characteristic information further includes information related to a stock of the part, and
the abnormality elimination period estimation unit estimates the abnormality elimination period in such a way that the abnormality elimination period becomes longer when the part is out of stock than the abnormality elimination period when the part is in stock.

### Claim 10 (depends on 9)

The abnormality sign notifying system according to claim 9, wherein
the abnormality elimination period estimation unit estimates the abnormality elimination period in such a way that the abnormality elimination period becomes longer when the part is out of stock than the abnormality elimination period when the part is in stock at least for a period necessary to procure the part.

### Claim 11

An abnormality sign notifying method comprising:
estimating an abnormality occurrence time at which an abnormality occurs in a facility based on information related to an operation of the facility installed in a production line;
estimating an abnormality elimination period required for eliminating the abnormality of the facility based on characteristic information related to a part necessary for eliminating the abnormality of the facility;
setting a notifying time at which a sign of the abnormality of the facility is notified at the abnormality elimination period before the abnormality occurrence time; and
notifying the sign of the abnormality of the facility at the notifying time.

### Claim 12 (depends on 11)

A non-transitory computer readable medium storing a program for causing a computer to execute the abnormality sign notifying method according to claim 11.
