# US 11,118,947 B2 · Information processing device, information processing method and non-transitory computer readable medium

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 11,118,947 B2
- Document ID: US11118947B2
- Status: Granted
- Kind: B2
- Application number: 16/238,679
- Filed: 2019-01-03
- Published: 2019-07-04
- Granted: 2021-09-14
- Earliest claimed: 2018-01-04
- Assignees: KABUSHIKl KAISHA TOSHIBA
- Applicants: Kabushiki Kaisha Toshiba
- Inventors: Takuro Moriyama; Gaku Ishii
- Web page: https://patentgrep.com/patent/US11118947B2

## CPC

- G01D 18/00: Testing or calibrating apparatus or arrangements provided for in groups G01D1/00 - G01D15/00
- G01D 3/032: affecting incoming signal, e.g. by averaging; gating undesired signals
- G01D: MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR

## Abstract

According to one embodiment, an information processing device includes an anomaly detector and an integration unit. The anomaly detector is configured to estimate a degree of drift anomaly based on measured values of a sensor during a sub-period which is a part of a monitored period. The integration unit is configured to estimate the degree of drift anomaly accumulated within the monitored period based on the estimated degrees of drift anomaly accumulated within the sub-periods. Symptoms of a drift anomaly include mismatches between the actual values and measured values.

## Claims

### Claim 1

An information processing device comprising:
an anomaly detector configured to estimate a degree of drift anomaly accumulated within a sub-period which is part of a monitored period based on measured values of a sensor during the sub-period; and
an integration unit configured to estimate a degree of drift anomaly accumulated within a whole of the monitored period based on the degree of drift anomaly accumulated within the sub-period;
wherein symptoms of the drift anomaly include mismatches between actual values and measured values.

### Claim 2 (depends on 1)

The information processing device according to claim 1, wherein
the integration unit is configured to determine whether the drift anomaly has occurred based on an estimated degree of drift anomaly accumulated within the whole of the monitored period.

### Claim 3 (depends on 2)

The information processing device according to claim 2, further comprising a display device which is configured to display at least whether the drift anomaly has occurred or the degree of drift anomaly on the sensor.

### Claim 4 (depends on 2)

The information processing device according to claim 2, wherein
the degree of drift anomaly is an amount of drift indicating a size of mismatch between the actual values and the measured values of the sensor, and
the integration unit is configured to estimate the amount of drift accumulated within the whole of the monitored period.

### Claim 5 (depends on 2)

The information processing device according to claim 2, further comprising a sub-period generator which is configured to generate the sub-period.

### Claim 6 (depends on 5)

The information processing device according to claim 5, wherein
the sub-period generator is configured to generate a plurality of sub-periods, and the integration unit is configured to determine whether the drift anomaly has occurred within the monitored period by estimating the degree of drift anomaly accumulated within the monitored period based on the estimated degrees of drift anomaly accumulated within the sub-periods.

### Claim 7 (depends on 6)

The information processing device according to claim 6, wherein
the anomaly detector is configured to concurrently estimate the degrees of drift anomaly based on the measured values of the sensors during the plurality of sub-periods.

### Claim 8 (depends on 6)

The information processing device according to claim 6, wherein
the sub-period generator is configured to generate sub-periods with overlapping periods, and
the integration unit is configured to use the estimated degree of drift anomaly for at least one of the sub-periods if the sub-periods include overlapping periods, when estimating the degree of drift anomaly accumulated within the whole of the monitored period.

### Claim 9 (depends on 6)

The information processing device according to claim 6, wherein
the sub-period generator is configured to generate sub-periods by dividing the monitored period.

### Claim 10 (depends on 5)

The information processing device according to claim 5, wherein
the sub-period generator is configured to generate a sub-period excluding a part of the monitored period, and
the integration unit is configured to estimate the degree of drift anomaly accumulated within the excluded part of the monitored period, based on the degree of drift anomaly estimated for the sub-period, when estimating the degree of drift anomaly accumulated within the whole of the monitored period.

### Claim 11 (depends on 5)

The information processing device according to claim 5, wherein
the anomaly detector is configured to calculate a degree of reliability of the degree of drift anomaly estimated for the sub-period, and
the sub-period generator is configured to determine whether the sub-period is generated again or not, based on the degree of reliability.

### Claim 12 (depends on 5)

The information processing device according to claim 5, wherein
the anomaly detector is configured to determine whether estimation of the degree of drift anomaly is successful for the sub-period, and
the sub-period generator is configured to generate the sub-period again if the anomaly detector determines that the estimation of the degree of drift anomaly is failed.

### Claim 13 (depends on 1)

The information processing device according to claim 1, wherein
the anomaly detector is configured to estimate the degree of drift anomaly multiple times for the sub-period, and
the integration unit is configured to determine whether the drift anomaly has occurred in the sensor by selecting the degrees of drift anomaly and estimating the degree of drift anomaly accumulated within the whole of the monitored period, multiple times.

### Claim 14

An information processing method comprising the steps of:
generating a sub-period which is part of a monitored period;
estimating a degree of drift anomaly accumulated within the sub-period based on measured values of a sensor during the sub-period;
estimating a degree of drift anomaly accumulated within a whole of the monitored period, based on the estimated degree of drift anomaly for the sub-period;
determining whether a drift anomaly has occurred in the sensor based on the estimated degree of drift anomaly accumulated within the whole of the monitored period; and
displaying whether the drift anomaly has occurred in the sensor,
wherein symptoms of the drift anomaly include mismatches between actual values and measured values.

### Claim 15

A non-transitory storage medium having a computer program stored therein which causes a computer to execute processes comprising:
generating a sub-period which is part of a monitored period;
estimating a degree of drift anomaly accumulated within the sub-period based on measured values of a sensor during the sub-period;
estimating a degree of drift anomaly accumulated within a whole of the monitored period, based on the estimated degree of drift anomaly for the sub-period;
determining whether a drift anomaly has occurred in the sensor based on the estimated degree of drift anomaly accumulated within the whole of the monitored period; and
displaying whether the drift anomaly has occurred in the sensor,
wherein symptoms of the drift anomaly include mismatches between actual values and measured values.

### Claim 16

An information processing device comprising:
an anomaly detector configured to estimate a degree of drift anomaly based on measured values of a sensor during a sub-period which is a part of a monitored period; and
an integration unit configured to estimate the degree of drift anomaly accumulated within the monitored period based on the degrees of drift anomaly accumulated within the sub-periods;
wherein
symptoms of a drift anomaly include mismatches between the actual values and measured values,
the integration unit is configured to determine whether the drift anomaly has occurred based on an estimated degree of drift anomaly accumulated within the monitored period,
the device further comprising a sub-period generator which is configured to generate the sub-period,
the sub-period generator is configured to generate a plurality of sub-periods, and the integration unit is configured to determine whether the drift anomaly has occurred within the monitored period by estimating the degree of drift anomaly accumulated within the monitored period based on the estimated degrees of drift anomaly accumulated within the sub-periods,
the sub-period generator is configured to generate sub-periods with overlapping periods, and
the integration unit is configured to use the estimated degree of drift anomaly for at least one of the sub-periods if the sub-periods include overlapping periods, when estimating the degree of drift anomaly accumulated within the monitored period.

### Claim 17

An information processing device comprising:
an anomaly detector configured to estimate a degree of drift anomaly based on measured values of a sensor during a sub-period which is a part of a monitored period; and
an integration unit configured to estimate the degree of drift anomaly accumulated within the monitored period based on the degrees of drift anomaly accumulated within the sub-periods;
wherein
symptoms of a drift anomaly include mismatches between the actual values and measured values,
the integration unit is configured to determine whether the drift anomaly has occurred based on an estimated degree of drift anomaly accumulated within the monitored period,
the device further comprising a sub-period generator which is configured to generate the sub-period,
the sub-period generator is configured to generate a sub-period excluding a part of the monitored period, and
the integration unit is configured to estimate the degree of drift anomaly accumulated within the excluded part of the monitored period, based on the degree of drift anomaly estimated for the sub-period, when estimating the degree of drift anomaly accumulated within the monitored period.

### Claim 18

An information processing device comprising:
an anomaly detector configured to estimate a degree of drift anomaly based on measured values of a sensor during a sub-period which is a part of a monitored period; and
an integration unit configured to estimate the degree of drift anomaly accumulated within the monitored period based on the degrees of drift anomaly accumulated within the sub-periods;
wherein
symptoms of a drift anomaly include mismatches between the actual values and measured values,
the integration unit is configured to determine whether the drift anomaly has occurred based on an estimated degree of drift anomaly accumulated within the monitored period,
the device further comprising a sub-period generator which is configured to generate the sub-period,
the anomaly detector is configured to calculate a degree of reliability of the degree of drift anomaly estimated for the sub-period, and
the sub-period generator is configured to determine whether the sub-period is generated again or not, based on the degree of reliability.

### Claim 19

An information processing device comprising:
an anomaly detector configured to estimate a degree of drift anomaly based on measured values of a sensor during a sub-period which is a part of a monitored period; and
an integration unit configured to estimate the degree of drift anomaly accumulated within the monitored period based on the degrees of drift anomaly accumulated within the sub-periods;
wherein
symptoms of a drift anomaly include mismatches between the actual values and measured values,
the integration unit is configured to determine whether the drift anomaly has occurred based on an estimated degree of drift anomaly accumulated within the monitored period,
the device further comprising a sub-period generator which is configured to generate the sub-period,
the anomaly detector is configured to determine whether estimation of the degree of drift anomaly is successful for the sub-period, and
the sub-period generator is configured to generate the sub-period again if the anomaly detector determines that the estimation of the degree of drift anomaly is failed.