# US 11,118,817 B2 · Cooling system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 11,118,817 B2
- Document ID: US11118817B2
- Status: Granted
- Kind: B2
- Application number: 15/944,142
- Filed: 2018-04-03
- Published: 2019-10-03
- Granted: 2021-09-14
- Earliest claimed: 2018-04-03
- Assignees: Heatcraft Refrigeration Products LLC
- Applicants: Heatcraft Refrigeration Products LLC
- Inventors: Shitong Zha
- Web page: https://patentgrep.com/patent/US11118817B2

## CPC

- F25B 1/10: with multi-stage compression (with cascade operation F25B7/00)
- F25B 9/10: with several cooling stages
- F25B 39/02: Evaporators
- F25B 40/04: Desuperheaters
- F25B 41/20: Disposition of valves, e.g. of on-off valves or flow control valves (expansion valves F25B41/31)
- F25B 43/006: {Accumulators}
- F25B 49/005: {of safety devices (F25B49/02 and F25B49/04 take precedence)}
- F25B 5/02: arranged in parallel
- F25B 7/00: Compression machines, plants or systems, with cascade operation, i.e. with two or more circuits, the heat from the condenser of one circuit being absorbed by the evaporator of the next circuit (F25B9/00 takes precedence)
- F25B 2339/024: Evaporators with refrigerant in a vessel in which is situated a heat exchanger
- F25B 2400/0409: for evaporators
- F25B 2400/05: Compression system with heat exchange between particular parts of the system
- F25B 2400/072: Intercoolers therefor
- F25B 2400/13: Economisers
- F25B 2400/23: Separators
- F25B 2500/06: Damage
- F25B 2500/07: Exceeding a certain pressure value in a refrigeration component or cycle
- F25B 2500/29: High ambient temperatures
- F28D 2021/0071: {Evaporators}
- F25B: REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F28D: HEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT (fluid heaters having heat generating means and heat transferring means F24H; furnaces F27; details of heat-exchange apparatus of general)

## Abstract

An apparatus includes a high side heat exchanger, a flash tank, a first load, a first compressor, an auxiliary cooling system, and a first check valve. The high side heat exchanger removes heat from a refrigerant. The flash tank stores the refrigerant from the high side heat exchanger. The first load uses the refrigerant to remove heat from a space proximate the first load. The first compressor compresses the refrigerant from the first load. The auxiliary cooling system removes heat from the refrigerant stored in the flash tank during a power outage. The first check valve directs the refrigerant between the first load and the first compressor back to the flash tank when the pressure of the refrigerant between the first load and the first compressor exceeds a threshold during the power outage.

## Claims

### Claim 1

An apparatus comprising:
a high side heat exchanger configured to remove heat from a refrigerant;
a flash tank configured to store the refrigerant from the high side heat exchanger;
a first load configured to use the refrigerant to remove heat from a space proximate the first load;
a first compressor configured to compress the refrigerant from the first load;
an auxiliary cooling system configured to remove heat from the refrigerant stored in the flash tank during a power outage; and
a first check valve with an inlet that is downstream of the first load during a non-defrosting operation wherein the first check valve directs, when the pressure of the refrigerant between the first load and the first compressor exceeds a threshold during the power outage, the refrigerant between the first load and the first compressor back to the flash tank before the refrigerant reaches the high side heat exchanger.

### Claim 2 (depends on 1)

The apparatus of claim 1, further comprising:
a second load configured to use the refrigerant to remove heat from a second space proximate the second load;
a second compressor configured to compress the refrigerant from the second load, the first compressor further configured to compress the refrigerant from the second compressor; and
a second check valve that directs, when the pressure of the refrigerant between the second load and the second compressor exceeds a threshold during the power outage, the refrigerant between the second load and the second compressor back to the flash tank before the refrigerant reaches the high side heat exchanger.

### Claim 3 (depends on 2)

The apparatus of claim 2, further comprising a desuperheater configured to remove heat from the refrigerant from the second compressor.

### Claim 4 (depends on 1)

The apparatus of claim 1, further comprising a bypass valve configured to pass a flash gas from the flash tank to the first compressor.

### Claim 5 (depends on 1)

The apparatus of claim 1, further comprising an oil separator configured to remove an oil from the refrigerant from the first compressor.

### Claim 6 (depends on 1)

The apparatus of claim 1, wherein the auxiliary cooling system comprises a heat exchanger configured to transfer heat from the refrigerant to a second refrigerant.

### Claim 7 (depends on 1)

The apparatus of claim 1, further comprising an accumulator configured to convert the refrigerant from a liquid to a gas before the refrigerant enters the first compressor.

### Claim 8

A method comprising:
removing, by a high side heat exchanger, heat from a refrigerant;
storing, by a flash tank, the refrigerant from the high side heat exchanger;
using, by a first load, the refrigerant to remove heat from a space proximate the first load;
compressing, by a first compressor, the refrigerant from the first load;
removing, by an auxiliary cooling system, heat from the refrigerant stored in the flash tank during a power outage; and
in response to the pressure of the refrigerant between the first load and the first compressor exceeding a threshold during the power outage, directing, by a first check valve, refrigerant between the first load and the first compressor back to the flash tank before the refrigerant reaches the high side heat exchanger, wherein the first check valve comprises an inlet that is downstream of the first load during a non-defrosting operation.

### Claim 9 (depends on 8)

The method of claim 8, further comprising:
using, by a second load, the refrigerant to remove heat from a second space proximate the second load;
compressing, by a second compressor, the refrigerant from the second load;
compressing, by the first compressor, the refrigerant from the second compressor; and
in response to the pressure of the refrigerant between the second load and the second compressor exceeding a threshold during the power outage, directing, by a second check valve, the refrigerant between the second load and the second compressor back to the flash tank before the refrigerant reaches the high side heat exchanger.

### Claim 10 (depends on 9)

The method of claim 9, further comprising removing, by a desuperheater, heat from the refrigerant from the second compressor.

### Claim 11 (depends on 8)

The method of claim 8, further comprising passing, by a bypass valve, a flash gas from the flash tank to the first compressor.

### Claim 12 (depends on 8)

The method of claim 8, further comprising removing, by an oil separator, an oil from the refrigerant from the first compressor.

### Claim 13 (depends on 8)

The method of claim 8, further comprising transferring, by a heat exchanger of the auxiliary cooling system, heat from the refrigerant to a second refrigerant.

### Claim 14 (depends on 8)

The method of claim 8, further comprising converting, by an accumulator, the refrigerant from a liquid to a gas before the refrigerant enters the first compressor.

### Claim 15

A system comprising:
a high side heat exchanger configured to remove heat from a first refrigerant;
a flash tank configured to store the first refrigerant from the high side heat exchanger;
a first load configured to use the first refrigerant to remove heat from a space proximate the first load;
a first compressor configured to compress the first refrigerant from the first load;
an auxiliary heat exchanger configured to transfer heat from the first refrigerant stored in the flash tank to a second refrigerant during a power outage;
an auxiliary compressor configured to compress the second refrigerant;
an auxiliary high side heat exchanger configured to remove heat from the second refrigerant;
an auxiliary generator configured to power the auxiliary compressor during the power outage; and
a first check valve with an inlet that is downstream of the first load during a non-defrosting operation wherein the first check valve directs, when the pressure of the first refrigerant between the first load and the first compressor exceeds a threshold during the power outage, the first refrigerant between the first load and the first compressor back to the flash tank before the refrigerant reaches the high side heat exchanger.

### Claim 16 (depends on 15)

The system of claim 15, further comprising:
a second load configured to use the first refrigerant to remove heat from a second space proximate the second load;
a second compressor configured to compress the first refrigerant from the second load, the first compressor further configured to compress the first refrigerant from the second compressor; and
a second check valve that directs, when the pressure of the first refrigerant between the second load and the second compressor exceeds a threshold during the power outage, the first refrigerant between the second load and the second compressor back to the flash tank before the refrigerant reaches the high side heat exchanger.

### Claim 17 (depends on 16)

The system of claim 16, further comprising a desuperheater configured to remove heat from the first refrigerant from the second compressor.

### Claim 18 (depends on 15)

The system of claim 15, further comprising a bypass valve configured to pass a flash gas from the flash tank to the first compressor.

### Claim 19 (depends on 15)

The system of claim 15, further comprising an oil separator configured to remove an oil from the first refrigerant from the first compressor.

### Claim 20 (depends on 15)

The system of claim 15, wherein the auxiliary heat exchanger is a plate heat exchanger.

### Claim 21 (depends on 15)

The system of claim 15, further comprising an accumulator configured to convert the first refrigerant from a liquid to a gas before the first refrigerant enters the first compressor.