# US 11,118,415 B2 · Method and arrangement for transporting drill pipes

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 11,118,415 B2
- Document ID: US11118415B2
- Status: Granted
- Kind: B2
- Application number: 16/311,297
- Filed: 2017-06-30
- Published: 2019-06-20
- Granted: 2021-09-14
- Earliest claimed: 2016-07-15
- Assignees: Rigtec AS
- Applicants: Rigtec AS
- Inventors: Morten Eriksen
- Web page: https://patentgrep.com/patent/US11118415B2

## CPC

- E21B 19/155: {Handling between horizontal and vertical position}
- E21B 19/06: Elevators, i.e. rod- or tube-gripping devices
- E21B 19/15: Racking of rods in horizontal position; Handling between horizontal and vertical position
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

Method for transporting drill pipes (12) to and/or from a drill string (14) of a drill rig comprising a plurality of connected drill pipes (12), the method comprising repeatingly lifting/lowering single drill pipes (12) one by one from/to a lower region (28) to/from an upper region (30) adjacent to an upper end (32) of the drill string (14). An arrangement (10) for transporting drill pipes (12) to a drill string (14) and a drill rig comprising the arrangement (10) are also provided.

## Claims

### Claim 1

A method for transporting drill pipes to a drill string of a drill rig comprising a plurality of connected drill pipes, the method comprising:
continuously lowering the drill string;
repeatingly lifting single drill pipes one by one from a lower region to an upper region adjacent to an upper end of the drill string by at least two lifting devices in an alternating manner;
repeatingly moving single drill pipes one by one by one or more moving devices from the upper region to a connecting region, where the single drill pipes can be connected to the upper end of the drill string; and
connecting the single drill pipes one by one to the drill string while the drill string is lowered,
wherein the repeated lifting of single drill pipes and the repeated moving of single drill pipes are carried out simultaneously.

### Claim 2 (depends on 1)

The method according to claim 1, further comprising repeatingly tilting single drill pipes one by one in the lower region from a substantially horizontal orientation to a substantially vertical orientation.

### Claim 3 (depends on 2)

The method according to claim 2, wherein the repeated tilting of single drill pipes is carried out by at least two tilting devices in an alternating manner.

### Claim 4 (depends on 2)

The method according to claim 2, wherein the repeated tilting of single drill pipes is carried out simultaneously with the repeated lifting of single drill pipes.

### Claim 5 (depends on 1)

The method according to claim 1, further comprising continuously conveying single drill pipes in a substantially horizontal orientation to the lower region.

### Claim 6

A method for transporting drill pipes from a drill string of a drill rig comprising a plurality of connected drill pipes, the method comprising:
continuously raising the drill string;
disconnecting single drill pipes one by one from the drill string while the drill string is raised;
repeatingly moving single drill pipes one by one by one or more moving devices from a connection region, where the single drill pipe is disconnected from an upper end of the drill string, to an upper region adjacent to the upper end of the drill string; and
repeatingly lowering single drill pipes one by one from the upper to a lower region by at least two lifting devices in an alternating manner,
wherein the repeated lowering of single drill pipes and the repeated moving of single drill pipes are carried out simultaneously.

### Claim 7 (depends on 6)

The method according to claim 6, further comprising repeatingly tilting single drill pipes one by one in the lower region from a substantially vertical orientation to a substantially horizontal orientation.

### Claim 8 (depends on 7)

The method according to claim 7, wherein the repeated tilting of single drill pipes is carried out by at least two tilting devices in an alternating manner.

### Claim 9 (depends on 7)

The method according to claim 7, wherein the repeated tilting of single drill pipes is carried out simultaneously with the repeated lowering of single drill pipes.

### Claim 10 (depends on 6)

The method according to claim 6, further comprising continuously conveying single drill pipes in a substantially horizontal orientation from the lower region.

### Claim 11

An arrangement for transporting drill pipes to a drill string of a drill rig comprising a plurality of connected drill pipes, the arrangement comprising:
at least two lifting devices, wherein the at least two lifting devices are configured to lift single drill pipes one by one from a lower region to an upper region adjacent to an upper end of the drill string in an alternating manner; and
a moving device configured to move a single drill pipe from the upper region to a connection region, where the drill pipe can be connected to the upper end of the drill string.

### Claim 12 (depends on 11)

The arrangement according to claim 11, further comprising at least two tilting devices, wherein the at least two tilting devices are configured to tilt single drill pipes from a substantially horizontal orientation to a substantially vertical orientation in an alternating manner.

### Claim 13 (depends on 11)

The arrangement according to claim 11, further comprising a conveying device configured to continuously convey single drill pipes in a substantially horizontal orientation to the lower region.

### Claim 14 (depends on 11)

A drill rig comprising an arrangement according to claim 11.

### Claim 15 (depends on 11)

The arrangement according to claim 11, further comprising a device configured to continuously lower the drill string.

### Claim 16 (depends on 15)

The arrangement according to claim 15, further comprising a screwing device arranged to screw drill pipes to the drill string while the drill string is lowered.

### Claim 17 (depends on 11)

The arrangement according to claim 11, further comprising a screwing device arranged to screw drill pipes to the drill string while the drill string is lowered.
