Systems and methods for testing wellbore completion systems
AssigneeSaudi Arabian Oil Company
InventorMohamed Larbi Zeghlache
Life of this patent
Estimating the term…
Loading patent…
AssigneeSaudi Arabian Oil Company
InventorMohamed Larbi Zeghlache
Estimating the term…
Techniques for testing a wellbore tubular system include positioning a primary wellbore tubular that includes an inner volume on at least one fixed mount positioned to support the primary wellbore tubular; positioning a secondary wellbore tubular concentrically or eccentrically within at least a portion of the inner volume of the primary wellbore tubular; coupling the secondary wellbore tubular on an adjustable stand positioned to support the secondary wellbore tubular; running a logging tool within an inner volume of the secondary wellbore tubular; detecting at least one defect of at least one of the primary wellbore tubular or the secondary wellbore tubular; and moving the secondary wellbore tubular within the inner volume of the primary wellbore tubular on a roller of the at least one adjustable stand.
A modular testing system, comprising:
A method for testing a wellbore tubular system, comprising:
A wellbore tubular testing system, comprising:
Dependencies are inferred from the claim text.