# US 11,111,733 B2 · Drilling assemblies

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 11,111,733 B2
- Document ID: US11111733B2
- Status: Granted
- Kind: B2
- Application number: 16/696,725
- Filed: 2019-11-26
- Published: 2020-06-11
- Granted: 2021-09-07
- Earliest claimed: 2018-12-07
- Assignees: Nabors Drilling Technologies USA, Inc.
- Applicants: Nabors Drilling Technologies USA, Inc.
- Inventors: Christopher Magnuson
- Web page: https://patentgrep.com/patent/US11111733B2

## CPC

- E21B 15/00: Supports for the drilling machine, e.g. derricks or masts
- E21B 19/06: Elevators, i.e. rod- or tube-gripping devices
- E21B 19/08: Apparatus for feeding the rods or cables (E21B19/22 takes precedence; automatic feed E21B44/02); Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods
- E21B 19/087: by means of a swinging arm
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A drilling assembly that can include a first mast, a second mast, a water table coupled between the first and second masts, and a plurality of sheaves coupled to the water table and adapted to translate along a plane oriented generally perpendicular to a height of at least one of the first or second mast. A drilling assembly that can include a mast having a generally C-shaped support structure, as viewed from a top view, and an opening disposed within the support structure, where the mast is disposed adjacent to a wellbore, and where the opening is adapted to permit passage of tubulars from an external position to the wellbore through the mast. A drilling assembly that can include a mast, a water table coupled to the mast, and a drawworks disposed adjacent to the mast, where the drawworks is adapted to laterally translate relative to the mast.

## Claims

### Claim 1

A drilling assembly comprising: a first mast; a second mast; a water table coupled between the first and second masts; and a first plurality of sheaves coupled to the water table and adapted to translate, relative to the first mast, in a first horizontal direction along a first plane oriented generally perpendicular to a height of at least one of the first or second mast; and a first drawworks disposed in a receiving area with the receiving area adapted to translate, relative to the first mast, in the first horizontal direction along a second plane that is parallel to the first plane.

### Claim 2 (depends on 1)

The drilling assembly of claim 1, wherein the water table comprises a first portion and a second portion, wherein the first portion is engageable with the first mast and the second portion is engageable with the second mast, and wherein the first and second portions are engageable with one another.

### Claim 3 (depends on 2)

The drilling assembly of claim 2, wherein the first and second portions have generally same sizes as one another, generally same shapes as one another, generally same functions as one another, or any combination thereof.

### Claim 4 (depends on 1)

The drilling assembly of claim 1, further comprising:
a second plurality of sheaves coupled to the water table and adapted to translate, relative to the second mast, in a second horizontal direction along the first plane; and
a second drawworks adapted to translate, relative to the second mast, in the second horizontal direction along the second plane that is parallel to the first plane.

### Claim 5 (depends on 4)

The drilling assembly of claim 4, wherein the second plurality of sheaves and the second drawworks translate in unison in the second horizontal direction.

### Claim 6 (depends on 1)

The drilling assembly of claim 1, wherein the first plurality of sheaves and the first drawworks translate in unison in the first horizontal direction.

### Claim 7

A drilling assembly comprising: a first mast; a water table coupled to the first mast; and a first drawworks disposed in a receiving area disposed adjacent to the first mast, wherein the receiving area is adapted to laterally translate relative to the first mast; and a first plurality of sheaves disposed on the water table and adapted to laterally translate relative to the first mast in a direction along a first line, wherein the receiving area is adapted to laterally translate relative to the first mast along a second line generally parallel with the first line.

### Claim 8 (depends on 7)

The drilling assembly of claim 7, further comprising:
a second mast;
a second drawworks disposed adjacent to the second mast, wherein the second drawworks is adapted to laterally translate relative to the second mast; and
a second plurality of sheaves disposed on the second mast and adapted to laterally translate in a direction along the first line, wherein the second drawworks is adapted to laterally translate in a direction along the second line generally parallel with the first line.

### Claim 9 (depends on 8)

The drilling assembly of claim 8, wherein the first drawworks and the first plurality of sheaves are adapted to move in unison, and wherein the second drawworks and the second plurality of sheaves are adapted to move in unison.

### Claim 10 (depends on 7)

The drilling assembly of claim 7, wherein an angle of a drilling line extending from the first drawworks to at least one of the first plurality of sheaves is adapted to remain at a generally fixed angle when the first plurality of sheaves is moved in a direction along the first line.

### Claim 11 (depends on 1)

The drilling assembly of claim 1, further comprising:
a first traveling block coupled to the first plurality of sheaves; and
a first pivotable linkage coupled between the first mast and the first traveling block, the first pivotable linkage being slidably coupled to the first mast and configured to move the first traveling block toward or away from the first mast.

### Claim 12 (depends on 11)

The drilling assembly of claim 11, further comprising:
a first top drive coupled to the first traveling block, wherein the first top drive moves in unison with the first traveling block as the first pivotable linkage moves the first traveling block toward or away from the first mast.

### Claim 13 (depends on 12)

The drilling assembly of claim 12, wherein the first plurality of sheaves, the first drawworks, the first traveling block, and the first top drive move horizontally in unison.

### Claim 14 (depends on 12)

The drilling assembly of claim 12, further comprising:
a second plurality of sheaves coupled to the water table and adapted to translate, relative to the second mast, in a second horizontal direction along the first plane; and
a second drawworks adapted to translate, relative to the second mast, in the second horizontal direction along the second plane that is parallel to the first plane.

### Claim 15 (depends on 14)

The drilling assembly of claim 14, further comprising:
a second traveling block coupled to the second plurality of sheaves;
a second pivotable linkage coupled between the second mast and the second traveling block, the second pivotable linkage being slidably coupled to the second mast and configured to move the second traveling block toward or away from the second mast; and
a second top drive coupled to the second traveling block, wherein the second top drive moves in unison with the second traveling block as the second pivotable linkage moves the second traveling block toward or away from the second mast.