Control method of a treatment plant of elements to be recycled or disposed and a treatment plant of elements to be recycled or disposed
OwnerMarco Venturi, Mauro Biavatiinventors
Life of this patent
Estimating the term…
Abstract
A control method of a treatment plant for elements to be recycled or disposed of, having a crushing roll to reduce the size of the elements to be recycled or disposed of, and a screen operatively arranged upstream of the crushing roll to enable passage therethrough only of elements having a size larger than a predetermined size, includes the steps of measuring the current absorbed by the crushing roll; comparing the measured current value to a first predetermined value; and reducing the vibrations of the screen, if the measured current exceeds the first predetermined value.
Claims3
A control method of a treatment plant for elements to be recycled or disposed comprising:
- at least one crushing roll for a reduction in size of the elements to be recycled or disposed, the at least one crushing roll being rotatable about a rotary shaft;
- at least one screen operatively arranged upstream of said crushing roll to allow passage to said crushing roll only of elements having a size larger than a predetermined size;
- and
- a conveyor belt operatively arranged upstream of said screen for conveying and transferring the elements to be recycled or disposed of,
- said method comprising:
- a measuring step of measuring current absorbed by said crushing roll;
- a comparing step of comparing a measured value of said absorbed current with a first predetermined value;
- a reducing step of reducing vibrations of said screen if said measured value exceeds said first predetermined value;
- a decreasing step of decreasing a feed speed of said conveyor belt simultaneously with said reducing step of vibrations of said screen;
- a stopping step of stopping said screen and said conveyor belt if said value of said measured value is higher than a second predetermined value;
- simultaneously to said stopping step of said screen and said conveyor belt, at least one first inversion step of inversing operation of said crushing roll;
- and a step of moving said crushing roll away from the elements if, after said at least one first inversion step of inversing the operation of said crushing roll, said value of said measured current remains above said first and said second predetermined values.
Dependencies are inferred from the claim text.