Method for reporting scheduling decisions by a communication tester
AssigneeRohde & Schwarz GmbH & Co. KG
InventorsYadhunandana Kumaraiah, Francesco Villanese, Francesco Rossetto
Life of this patent
Estimating the term…
Abstract
A method for reporting scheduling decisions by a communication tester is provided. The method comprises the steps of establishing a communication between the communication tester and a device under test, and creating a message log during the communication with the aid of the communication tester. In this context, the message log comprises reports with all negative scheduling decisions.
Claims19
A method for reporting scheduling decisions by a communication tester, the method comprising the steps of:
- establishing a communication between the communication tester and a device under test, and
- creating a message log during the communication via the communication tester,
- wherein the message log comprises reports with at least one negative scheduling decision,
- wherein the at least one negative scheduling decision comprises a reason and a time at which a desired operation was not possible, and
- wherein the reason comprises a transition time between uplink and downlink that is too short for a half-duplex device under test and/or the communication tester has configured measurement gaps in a respective slot.
A communication tester for reporting scheduling decisions, the communication tester comprising:
- a transceiver, and
- a controller,
- wherein the transceiver establishes a communication between the communication tester and a device under test,
- wherein the controller creates a message log during the communication, wherein the message log comprises reports with at least one negative scheduling decision,
- wherein the at least one negative scheduling decision comprises a reason and a time at which a desired operation was not possible, and
- wherein the reason comprises a transition time between uplink and downlink that is too short for a half-duplex device under test and/or the communication tester has configured measurement gaps in a respective slot.
Dependencies are inferred from the claim text.