A method for controlling an integrated renewable energy source and energy storage system (RES-ESS) facility configured to supply electric power to an electric grid at a grid interconnection point, the RES-ESS facility including a renewable energy source (RES) and an energy storage system (ESS) chargeable with electric power produced by the RES, and the RES-ESS facility having a point of grid interconnect (POGI) limit, the method comprising:
- providing at least one first power inverter coupled between the RES and the grid interconnection point, wherein the at least one first power inverter is configured to convert RES direct current (DC) electric power to RES alternating current (AC) electric power, and an aggregate output capacity of the at least one first power inverter is sized to exceed the POGI limit;
- providing at least one second power inverter coupled (i) between the ESS and the grid interconnection point, and (ii) between the at least one first power inverter and the grid interconnection point, wherein the at least one second power inverter is configured to (a) convert RES AC electric power to ESS DC electric power when charging the ESS with RES AC electric power, and (b) convert ESS DC electric power to ESS AC electric power when discharging the ESS AC electric power to the electric grid;
- generating a forecast signal comprising a time-dependent forecast of energy production of the RES based at least in part on (a) data from a sky imaging sensor associated with the RES-ESS facility, (b) data from a satellite imaging sensor, or (c) meteorological data;
- while supplying a first portion of the RES AC electric power to the electric grid, diverting a second portion of the RES AC electric power to the at least one second power inverter in an amount sufficient to avoid supplying RES AC electric power to the electric grid in excess of the POGI limit;
- and
- using the forecast signal to generate a time-varying charge/discharge control signal for the ESS that ensures a state of charger (SOC) schedule of the ESS is satisfied.