Method for coordinating switches in multiple reclosers in a distribution feeder line in response to detection of a fault
AssigneeS&C Electric Company
InventorsAlejandro Montenegro, Yoav Sharon
Life of this patent
Estimating the term…
Loading patent…
AssigneeS&C Electric Company
InventorsAlejandro Montenegro, Yoav Sharon
Estimating the term…
A method for controlling multiple switching devices in an electrical power distribution network in response to detecting a fault. The method determines that a fault current is present, and opens a switch in each of the switching devices in response thereto. The method then initiates a current pulse in the switch in a farthest upstream switching device for a first pulse duration time, closes the switch in the farthest upstream recloser if no fault current is detected during the first pulse duration temporarily changes the TCC curve of the farthest upstream recloser to a second TCC curve that is an instantaneous or near instantaneous TCC curve, and initiates a current pulse in the switch in a next farthest upstream switching device that is downstream of the farthest upstream switching device after the switch in a farthest upstream switching device is closed.
A method for controlling multiple switching devices positioned at certain intervals along an electrical line in an electrical power distribution network in response to detecting a fault, where the switching devices are operable to allow or prevent current flow, and where each switching device has a first time current characteristic (TCC) curve during normal operation when no fault is present in the line, said TCC curve identifying how fast the switching device will be opened in response to certain current levels, the method comprising:
A method for controlling multiple switching devices positioned at certain intervals along a feeder line in an electrical power distribution network in response to detecting a fault, where each switching device has a first time current characteristic (TCC) curve during normal operation where no fault is present in the feeder line, the method comprising:
A system for controlling multiple switching devices positioned at certain intervals along an electrical line in an electrical power distribution network in response to detecting a fault, where the switching devices are operable to allow or prevent current flow, and where each switching device has a first time current characteristic (TCC) curve during normal operation when no fault is present in the line, said TCC curve identifying how fast the switching device will be closed in response to certain current levels, the system comprising: