# US 11,079,786 B2 · Predictive method, apparatus and program product for weather adjustment of resource usage data

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 11,079,786 B2
- Document ID: US11079786B2
- Status: Granted
- Kind: B2
- Application number: 16/434,767
- Filed: 2019-06-07
- Published: 2020-12-10
- Granted: 2021-08-03
- Earliest claimed: 2019-06-07
- Applicants: Christopher Sticht
- Inventors: Christopher Sticht
- Web page: https://patentgrep.com/patent/US11079786B2

## CPC

- G05F 1/66: Regulating electric power
- G01D 4/004: {Remote reading of utility meters to a fixed location}
- G01W 1/02: Instruments for indicating weather conditions by measuring two or more variables, e.g. humidity, pressure, temperature, cloud cover or wind speed (G01W1/10 takes precedence)
- G05F: SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
- G01D: MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01W: METEOROLOGY (radar, sonar, lidar or analogous systems, designed for meteorological use G01S13/95, G01S15/88, G01S17/95)

## Abstract

A method for weather adjustment of an electrical utility system. Data defining sequential events in the utility system is obtained, each event identified by three coordinate values: hour of day, recorded temperature, and resource usage. A three-dimensional topological surface is generated from the coordinate value, by plotting the resource usage against the hour and temperature in a three-dimensional space. A polynomial equation having calculated coefficients and a highest degree of six for each variable is generated to define the topological surface, wherein the polynomial equation expresses the resource usage as a tenth-degree polynomial function of hour of day and temperature. A future load on components of the system at a particular temperature and hour of day is determined by applying the coefficients to the coordinate values for the particular temperature and hour, and modifying the functionality of components of the electrical utility system based on the determined future load.

## Claims

### Claim 1

A method for weather adjustment of an electrical utility system, comprising:
obtaining data defining a plurality of sequential events in the electrical utility system, each event identified by three coordinate values, the three coordinate values being hour of day, recorded temperature, and resource usage of the electrical utility system;
generating from the three coordinate values a three-dimensional topological surface by plotting the resource usage against the hour of day and the temperature in a three-dimensional space;
generating a polynomial equation defining the topological surface, wherein the polynomial equation expresses the resource usage as a tenth-degree polynomial function of hour of day and temperature, with each independent variable having a highest degree of six, the polynomial equation having a set of calculated coefficients;
determining a future load on a component of the electrical utility system at a particular temperature and hour of day by applying the calculated coefficients to the coordinate values for the particular temperature and hour of day; and
modifying the functionality of one or more components of the electrical utility system based on the determined future load.

### Claim 2 (depends on 1)

The method of claim 1, wherein the polynomial equation defines the resource usage coordinate value by application of the coefficients to the coordinate values for hour of day and temperature.

### Claim 3 (depends on 1)

The method of claim 1, wherein the plurality of sequential events totals a number of events in the range between 24 and 600000.

### Claim 4 (depends on 1)

The method of claim 1, wherein the load is one or more of customer load, transformer load, feeder load, and substation load.

### Claim 5 (depends on 1)

The method of claim 1 wherein the component is one or more of a breaker, a switch, a recloser, a fuse, a sectionalizer, a customer meter, a service transformer, a circuit/feeder (part or whole), a spot secondary-network, a secondary-network grid, a primary-network, a substation bus, a substation, a substation power transformer, a transmission/sub-transmission line, a transmission network, a planning area, a generator, a generation facility, sets of generation facilities, a utility system or an interconnected system of utility systems.

### Claim 6 (depends on 1)

The method of claim 1, wherein the tenth-degree polynomial function is:
z=B0+B1·x+B2·x2+B3·x3+B4·x4+B5·x5+B6·x6+B7·y+B8·x·y+B9·x2·y+B10·x3·y+B11·x4·y+B12·x5·y+B13·x6y+B14·y2+B15·x·y2+B16·x2·y2+B17·x3y2+B18·x4·y2+B19·x5·y2+B20·x6·y2+B21·y3+B22·x·y3+B23·x2·y3+B24·x3·y3+B25·x4·y3+B26·x5·y3+B27·x6·y3+B28·y4+B29·x·y4+B30·x2·y4+B31·x3·y4+B32·x4·y4+B33·x5·y4+B34·x6·y4,
wherein Bs are the calculated coefficients.

### Claim 7

A method for system automation of an electrical utility system, comprising:
obtaining data defining a plurality of sequential events in a portion the electrical utility system, each event identified by three coordinate values, the three coordinate values being hour of day, recorded temperature, and resource usage of the electrical utility system;
generating from the three coordinate values a three-dimensional topological surface by plotting the resource usage against the hour of day and the temperature in a three-dimensional space;
generating a polynomial equation defining the topological surface, wherein the polynomial equation expresses the resource usage as a tenth-degree polynomial function of hour of day and temperature, with each independent variable having a highest degree of six, the polynomial equation having a set of calculated coefficients;
determining a future load on a component of the electrical utility system at a particular temperature and hour of day by applying the calculated coefficients to the coordinate values for the particular temperature and hour of day; and
modifying the functionality of one or more components of the electrical utility system based on the determined future load.

### Claim 8 (depends on 7)

The method of claim 7, wherein the polynomial equation defines the resource usage coordinate value by application of the coefficients to the coordinate values for hour of day and temperature.

### Claim 9 (depends on 7)

The method of claim 7, wherein the plurality of sequential events totals a number of events in the range between 24 and 600000.

### Claim 10 (depends on 7)

The method of claim 7, wherein the load is one or more of customer load, transformer load, feeder load, and substation load.

### Claim 11 (depends on 7)

The method of claim 7 wherein the component is one or more of a breaker, a switch, a recloser, a fuse, a sectionalizer, a customer meter, a service transformer, a circuit/feeder (part or whole), a spot secondary-network, a secondary-network grid, a primary-network, a substation bus, a substation, a substation power transformer, a transmission/sub-transmission line, a transmission network, a planning area, a generator, a generation facility, sets of generation facilities, a utility system or an interconnected system of utility systems.

### Claim 12 (depends on 7)

The method of claim 7, wherein the tenth-degree polynomial function is:
z=B0+B1·x+B2·x2+B3·x3+B4·x4+B5·x5+B6·x6+B7·y+B8·x·y+B9·x2·y+B10·x3·y+B11·x4·y+B12·x5·y+B13·x6y+B14·y2+B15·x·y2+B16·x2·y2+B17·x3y2+B18·x4·y2+B19·x5·y2+B20·x6·y2+B21·y3+B22·x·y3+B23·x2·y3+B24·x3·y3+B25·x4·y3+B26·x5·y3+B27·x6·y3+B28·y4+B29·x·y4+B30·x2·y4+B31·x3·y4+B32·x4·y4+B33·x5·y4+B34·x6·y4,
wherein Bs are the calculated coefficients.

### Claim 13

An electrical utility system, comprising:
a plurality of electrical grid components; and
a distribution management system;
wherein the distribution management system is adapted to:
receive communications from the electrical grid components;
obtain data defining a plurality of sequential events in a portion the electrical utility system, each event identified by three coordinate values, the three coordinate values being hour of day, recorded temperature, and resource usage of the electrical utility system;
generate from the three coordinate values a three-dimensional topological surface by plotting the resource usage against the hour of day and the temperature in a three-dimensional space;
generate a polynomial equation defining the topological surface, wherein the polynomial equation expresses the resource usage as a tenth-degree polynomial function of hour of day and temperature, with each independent variable having a highest degree of six, the polynomial equation having a set of calculated coefficients;
determine a future load on a component of the electrical utility system at a particular temperature and hour of day by applying the calculated coefficients to the coordinate values for the particular temperature and hour of day; and
modify a component of the electrical utility system based on the determined future load.

### Claim 14 (depends on 13)

The method of claim 13, wherein the polynomial equation defines the resource usage coordinate value by application of the coefficients to the coordinate values for hour of day and temperature.

### Claim 15 (depends on 13)

The method of claim 13, wherein the plurality of sequential events totals a number of events in the range between 24 and 600000.

### Claim 16 (depends on 13)

The method of claim 13, wherein the load is one or more of customer load, transformer load, feeder load, and substation load.

### Claim 17 (depends on 13)

The method of claim 13 wherein the component is one or more of a breaker, a switch, a recloser, a fuse, a sectionalizer, a customer meter, a service transformer, a circuit/feeder (part or whole), a spot secondary-network, a secondary-network grid, a primary-network, a substation bus, a substation, a substation power transformer, a transmission/sub-transmission line, a transmission network, a planning area, a generator, a generation facility, sets of generation facilities, a utility system or an interconnected system of utility systems.

### Claim 18 (depends on 13)

The method of claim 13, wherein the tenth-degree polynomial function is:
z=B0+B1·x+B2·x2+B3·x3+B4·x4+B5·x5+B6·x6+B7·y+B8·x·y+B9·x2·y+B10·x3·y+B11·x4·y+B12·x5·y+B13·x6y+B14·y2+B15·x·y2+B16·x2·y2+B17·x3y2+B18·x4·y2+B19·x5·y2+B20·x6·y2+B21·y3+B22·x·y3+B23·x2·y3+B24·x3·y3+B25·x4·y3+B26·x5·y3+B27·x6·y3+B28·y4+B29·x·y4+B30·x2·y4+B31·x3·y4+B32·x4·y4+B33·x5·y4+B34·x6·y4,
wherein Bs are the calculated coefficients.