Building energy storage system with peak load contribution and stochastic cost optimization
AssigneeJohnson Controls Technology Company
InventorsMohammad N. Elbsat, Michael J. Wenzel
Life of this patent
Estimating the term…
Loading patent…
AssigneeJohnson Controls Technology Company
InventorsMohammad N. Elbsat, Michael J. Wenzel
Estimating the term…
A central plant includes storage devices configured to store resources purchased from a utility or generated by the central plant and to discharge the one or more resources. The central plant includes a controller configured to obtain a cost function comprising a peak load contribution (PLC) term representing a cost based on an amount of the one or more resources purchased during coincidental peak (CP) subperiods. The controller is configured to modify the cost function by applying a peak subperiods mask to the PLC term, wherein, for each subperiod, the peak subperiods mask modifies a portion of the PLC term corresponding to the subperiod based on a probability that the subperiod will be one of the CP subperiods. The controller is also configured to perform an optimization of the modified cost function.
A central plant comprising:
A method for allocating one or more resources in a central plant, the method comprising:
An energy cost optimization system for a building, the system comprising:
Dependencies are inferred from the claim text.