Method of recovering room-and-pillar coal pillar by using external replacement supports
AssigneeChina University of Mining and Technology
InventorsNan Zhou, Hengfeng Liu, Meng Li, Zhongya Wu, Jixiong Zhang
Life of this patent
Estimating the term…
Loading patent…
AssigneeChina University of Mining and Technology
InventorsNan Zhou, Hengfeng Liu, Meng Li, Zhongya Wu, Jixiong Zhang
Estimating the term…
A method of recovering a room-and-pillar coal pillar by using external replacement supports. In the recovery of a room-and-pillar coal pillar, a cement material wall is formed by performing pouring around a coal pillar having a width to height ratio of less than 0.6, by means of a single-pillar sack arrangement technique, such that a coal pillar resource may be mined while a wall made from a cement filling material supports an overlying stratum. After mining is complete, a coal pillar goaf region is filled with the cement filling material, and after the cement filling material solidifies and is stable, the single pillar can be recovered.
A method for recovering room-type coal pillars by replacing with external supports, comprising the following steps:
Dependencies are inferred from the claim text.