Bolt installation and tensioning system
AssigneeNuScale Power, LLC
InventorsSteven W. Shaw, Derek Noel
Life of this patent
Estimating the term…
Loading patent…
AssigneeNuScale Power, LLC
InventorsSteven W. Shaw, Derek Noel
Estimating the term…
A bolt installation and removal (BIR) system is used for assembling and disassembling a nuclear vessel. The BIR system includes a platform with a stand for supporting the nuclear vessel. A track extends around an outside perimeter of the platform and multiple tool carts include wheels that roll on the track. Tool towers are located on the carts and include tool assemblies configured to install and remove bolts on the nuclear reactor vessel. Magazine towers also extend up from the tool carts next to the tool towers and include magazines that hold bolts for exchanging with the tool assemblies. Drive mechanisms move tool heads in the tool assemblies around a first vertical axis, vertically up and down, and laterally to more simply and reliably install and remove the bolts in a radioactive underwater environment.
A tool cart for assembling and disassembling a nuclear vessel, comprising:
A tool cart for assembling and disassembling a nuclear vessel, comprising:
A tool cart for assembling and disassembling a nuclear vessel, comprising:
A tool tower for attaching and detaching a bolt to a nuclear vessel, comprising:
A bolt installation and removal system for assembling and disassembling a nuclear vessel, comprising:
Dependencies are inferred from the claim text.