# US 10,959,188 B2 · Techniques and apparatuses for power control for uplink channels

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 10,959,188 B2
- Document ID: US10959188B2
- Status: Granted
- Kind: B2
- Application number: 15/851,868
- Filed: 2017-12-22
- Published: 2018-07-19
- Granted: 2021-03-23
- Earliest claimed: 2017-01-16
- Assignees: QUALCOMM Incorporated
- Applicants: QUALCOMM Incorporated
- Inventors: Renqiu Wang; Hao Xu; Wanshi Chen; Peter Gaal; Wei Zeng; Tingfang Ji; Amir Aminzadeh Gohari
- Web page: https://patentgrep.com/patent/US10959188B2

## CPC

- H04W 52/325: {Power control of control or pilot channels}
- H04W 52/146: {Uplink power control}
- H04W 52/16: Deriving transmission power values from another channel
- H04W 52/225: {Calculation of statistics, e.g. average or variance}
- H04W 52/343: {taking into account loading or congestion level}
- H04W 52/346: {distributing total power among users or channels}
- H04W 72/0446: Resources in time domain, e.g. slots or frames
- H04W 72/21: in the uplink direction of a wireless link, i.e. towards the network
- H04W 72/0473: {the resource being transmission power}
- H04W 72/23: in the downlink direction of a wireless link, i.e. towards a terminal
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

A user equipment (UE) may transmit a control channel and a data channel using contiguous resource allocations of a portion of a slot. The control channel may be associated with control channel power spectral density (PSD) and the data channel may be associated with a data channel PSD. When a difference between the control channel PSD and the data channel PSD exceeds a maximum delta value, the UE may experience degraded performance as a result of tonal interference and/or the like. In some aspects, the UE may determine a control channel transmit power for the control channel and a data channel transmit power for the data channel. The control channel transmit power and the data channel transmit power may be determined such that the maximum delta value is not exceeded and that a threshold relating to a link budget is satisfied, thereby ensuring that performance is not degraded.

## Claims

### Claim 1

A method for wireless communication, comprising:
determining, by a user equipment, a control channel transmit power for a control channel and a data channel transmit power for a data channel that are to be transmitted during a portion of a slot,
wherein the control channel and the data channel are scheduled to be transmitted in contiguous resource blocks of the portion of the slot,
wherein a difference between a control channel power spectral density (PSD) associated with the control channel transmit power and a data channel PSD associated with the data channel transmit power is less than a maximum difference in PSDs the user equipment can accommodate for contiguous resource blocks,
wherein the control channel transmit power and the data channel transmit power satisfy a threshold relating to a link budget, and
wherein a quantity of resource blocks in a resource allocation for the control channel or the data channel is reduced from a quantity of resource blocks in a candidate resource allocation based at least in part on the control channel transmit power or the data channel transmit power; and
transmitting, by the user equipment, at least one of the control channel or the data channel during the portion of the slot.

### Claim 2 (depends on 1)

The method of claim 1, wherein the control channel is a physical uplink control channel (PUCCH) and the data channel is a physical uplink shared channel (PUSCH).

### Claim 3 (depends on 1)

The method of claim 1, wherein the portion of the slot is a region allocated for the control channel or the data channel.

### Claim 4 (depends on 1)

The method of claim 1, wherein the data channel PSD is greater than the control channel PSD, and wherein the control channel transmit power is determined based at least in part on the data channel transmit power.

### Claim 5 (depends on 4)

The method of claim 4, wherein a control channel resource allocation is determined based at least in part on the control channel transmit power.

### Claim 6 (depends on 1)

The method of claim 1, wherein the control channel PSD is greater than the data channel PSD, and wherein the data channel transmit power is determined based at least in part on the control channel transmit power.

### Claim 7 (depends on 6)

The method of claim 6, wherein a data channel resource allocation is determined based at least in part on the data channel transmit power.

### Claim 8 (depends on 1)

The method of claim 1, wherein a control channel resource allocation and the control channel transmit power are determined based at least in part on a data channel resource allocation and the data channel transmit power, and wherein the data channel resource allocation and the data channel transmit power are determined based at least in part on the control channel resource allocation and the control channel transmit power.

### Claim 9 (depends on 1)

The method of claim 1, wherein a power split associated with the control channel transmit power and the data channel transmit power is determined based at least in part on a prioritization relating to a type of uplink control information that is to be transmitted during the portion of the slot.

### Claim 10 (depends on 1)

The method of claim 1, wherein the data channel transmit power is determined based at least in part on a candidate control channel transmit power and a maximum transmit power.

### Claim 11 (depends on 1)

The method of claim 1, wherein the control channel transmit power is determined based at least in part on a candidate data channel transmit power and a maximum transmit power.

### Claim 12 (depends on 1)

The method of claim 1, wherein one of the control channel or the data channel is not transmitted during the portion of the slot based at least in part on a type of uplink control information that is to be transmitted during the portion of the slot, and a transmit power of the other of the control channel or the data channel is determined based at least in part on a candidate transmit power.

### Claim 13 (depends on 1)

The method of claim 1, wherein a control channel resource allocation and a data channel resource allocation are determined before the control channel transmit power and the data channel transmit power are determined.

### Claim 14 (depends on 1)

The method of claim 1, wherein a control channel resource allocation, the control channel transmit power, a data channel resource allocation, and the data channel transmit power are determined based at least in part on at least one of:
received dynamic signaling,
received semi-static signaling, or
a stored configuration.

### Claim 15

A user equipment for wireless communication, comprising:
memory; and
one or more processors coupled to the memory, the memory and the one or more processors configured to:
determine a control channel transmit power for a control channel and a data channel transmit power for a data channel that are to be transmitted during a portion of a slot,
wherein the control channel and the data channel are scheduled to be transmitted in contiguous resource blocks of the portion of the slot,
wherein a difference between a control channel power spectral density (PSD) associated with the control channel transmit power and a data channel PSD associated with the data channel transmit power is less than a maximum difference in PSDs the user equipment can accommodate for contiguous resource blocks,
wherein the control channel transmit power and the data channel transmit power satisfy a threshold relating to a link budget, and
wherein a quantity of resource blocks in a resource allocation for the control channel or the data channel is reduced from a quantity of resource blocks in a candidate resource allocation based at least in part on the control channel transmit power or the data channel transmit power; and
transmit at least one of the control channel or the data channel during the portion of the slot.

### Claim 16 (depends on 15)

The user equipment of claim 15, wherein the control channel is a physical uplink control channel (PUCCH) and the data channel is a physical uplink shared channel (PUSCH).

### Claim 17 (depends on 15)

The user equipment of claim 15, wherein the portion of the slot is a region allocated for the control channel or the data channel.

### Claim 18 (depends on 15)

The user equipment of claim 15, wherein the data channel PSD is greater than the control channel PSD, and wherein the control channel transmit power is determined based at least in part on the data channel transmit power.

### Claim 19 (depends on 18)

The user equipment of claim 18, wherein a control channel resource allocation is determined based at least in part on the control channel transmit power.

### Claim 20 (depends on 15)

The user equipment of claim 15, wherein the control channel transmit power is greater than the data channel transmit power, and wherein the data channel transmit power is determined based at least in part on the control channel transmit power.

### Claim 21 (depends on 20)

The user equipment of claim 20, wherein a data channel resource allocation is determined based at least in part on the data channel transmit power.

### Claim 22 (depends on 15)

The user equipment of claim 15, wherein a control channel resource allocation and the control channel transmit power are determined based at least in part on a data channel resource allocation and the data channel transmit power, and wherein the data channel resource allocation and the data channel transmit power are determined based at least in part on the control channel resource allocation and the control channel transmit power.

### Claim 23 (depends on 15)

The user equipment of claim 15, wherein a power split associated with the control channel transmit power and the data channel transmit power is determined based at least in part on a prioritization relating to a type of uplink control information that is to be transmitted during the portion of the slot.

### Claim 24 (depends on 15)

The user equipment of claim 15, wherein the data channel transmit power is determined based at least in part on a candidate control channel transmit power and a maximum transmit power.

### Claim 25 (depends on 15)

The user equipment of claim 15, wherein the control channel transmit power is determined based at least in part on a candidate data channel transmit power and a maximum transmit power.

### Claim 26 (depends on 15)

The user equipment of claim 15, wherein one of the control channel or the data channel is not transmitted during the portion of the slot based at least in part on a type of uplink control information that is to be transmitted during the portion of the slot, and a transmit power of the other of the control channel or the data channel is determined based at least in part on a candidate transmit power.

### Claim 27

An apparatus for wireless communication, comprising:
means for determining a control channel transmit power for a control channel and a data channel transmit power for a data channel that are to be transmitted during a portion of a slot,
wherein the control channel and the data channel are scheduled to be transmitted in contiguous resource blocks of the portion of the slot,
wherein a difference between a control channel power spectral density (PSD) associated with the control channel transmit power and a data channel PSD associated with the data channel transmit power is less than a maximum difference in PSDs the apparatus can accommodate for contiguous resource blocks,
wherein the control channel transmit power and the data channel transmit power satisfy a threshold relating to a link budget, and
wherein a quantity of resource blocks in a resource allocation for the control channel or the data channel is reduced from a quantity of resource blocks in a candidate resource allocation based at least in part on the control channel transmit power or the data channel transmit power; and
means for transmitting at least one of the control channel or the data channel during the portion of the slot.

### Claim 28

A non-transitory computer-readable medium storing instructions for wireless communication, the instructions comprising:
one or more instructions that, when executed by one or more processors of user equipment, cause the one or more processors to:
determine a control channel transmit power for a control channel and a data channel transmit power for a data channel that are to be transmitted during a portion of a slot,
wherein the control channel and the data channel are scheduled to be transmitted in contiguous resource blocks of the portion of the slot,
wherein a difference between a control channel power spectral density (PSD) associated with the control channel transmit power and a data channel PSD associated with the data channel transmit power is less than a maximum difference in PSDs the user equipment can accommodate for contiguous resource blocks,
wherein the control channel transmit power and the data channel transmit power satisfy a threshold relating to a link budget, and
wherein a quantity of resource blocks in a resource allocation for the control channel or the data channel is reduced from a quantity of resource blocks in a candidate resource allocation based at least in part on the control channel transmit power or the data channel transmit power; and
transmit at least one of the control channel or the data channel during the portion of the slot.

### Claim 29 (depends on 27)

The apparatus of claim 27, wherein the control channel is a physical uplink control channel (PUCCH) and the data channel is a physical uplink shared channel (PUSCH).

### Claim 30 (depends on 28)

The non-transitory computer-readable medium of claim 28, wherein the control channel is a physical uplink control channel (PUCCH) and the data channel is a physical uplink shared channel (PUSCH).
