# US 10,958,101 B2 · Methods and apparatus incorporating topology error estimation for management of an electric power system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 10,958,101 B2
- Document ID: US10958101B2
- Status: Granted
- Kind: B2
- Application number: 15/995,430
- Filed: 2018-06-01
- Published: 2019-12-05
- Granted: 2021-03-23
- Earliest claimed: 2018-06-01
- Assignees: Siemens Industry, Inc.
- Applicants: Siemens Industry, Inc.
- Inventors: James G. Frame; Lei Fan
- Web page: https://patentgrep.com/patent/US10958101B2

## CPC

- H02J 13/1317: {using an auxiliary transmission line}
- G05B 13/024: {in which a parameter or coefficient is automatically adjusted to optimise the performance}
- H02J 3/02: using a single network for simultaneous distribution of AC power at different frequencies
- H02J 13/1321: {using a wired telecommunication network or a data transmission bus}
- H02J 13/333: the equipment forming part of substations
- H02J 13/34: the equipment being switches, relays or circuit breakers
- G05B 15/02: electric
- G06F 30/18: Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling (circuit design at the physical level G06F30/39; network planning tools for wireless communication networks H04W16/18)
- G06F 2119/06: Power analysis or power optimisation
- G06Q 50/06: Energy or water supply
- Y02E 40/70: Smart grids as climate change mitigation technology in the energy generation sector
- Y02E 60/00: Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y04S 10/18: using switches, relays or circuit breakers, e.g. intelligent electronic devices [IED]
- Y04S 10/50: Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- Y04S 40/124: using wired telecommunication networks or data transmission busses
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

An electric power system includes an energy management system configured to control a generated power output level of one or more electric generator resources, and a configuration of two or more high-voltage transmission lines, for efficient operation based, at least in part, on a topology error estimation using binary values corresponding to switch statuses. Increased accuracy of network topology estimates facilitates improved state estimation, which in turn enables production of more highly optimized control of electric generator resources and configuration of high-voltage transmission lines.

## Claims

### Claim 1

A method of controlling an electric power system, comprising:
providing a plurality of electric generator resources, each electric generator resource configured to operate in accordance with electric generator resource control data;
providing a plurality of transmission lines, each transmission line coupled to at least one electric generator resource;
providing a plurality of telemetered switching devices, each telemetered switching device coupled to at least one transmission line of the plurality of transmission lines;
providing a plurality of non-telemetered switching devices, each non-telemetered switching device coupled to at least one transmission line of the plurality of transmission lines;
providing an energy management system coupled to the plurality of electric generator resources, the plurality of transmission lines, and at least one telemetered switching device;
generating a first network topology model of the electric power system;
generating a first state estimation based, at least in part, on the first network topology model of the electric power system;
generating a first topology error estimation based, at least in part, on the first state estimation of the electric power system, wherein generating the first topology error estimation includes using a binary variable corresponding to a status of a telemetered or non-telemetered switching device;
generating a second network topology model of the electric power system based, at least in part, on the first network topology model of the electric power system and the first topology error estimation;
generating a second state estimation of the electric power system based, at least in part, on the second network topology model of the electric power system;
determining an optimized schedule of power generation for one or more electric generator resources of the plurality of electric generator resources, based at least in part on the second state estimation;
determining an optimized configuration of one or more transmission lines of the plurality of transmission lines, based at least in part on the second state estimation;
generating electric generator resource control data based, at least in part, on the optimized schedule of power generation;
generating transmission line configuration control data based, at least in part, on the optimized configuration of one or more transmission lines;
managing a generated electric power output level of at least one electric generator resource of the plurality of electric generator resources based, at least in part, on the electric generator resource control data; and
managing a configuration of one or more transmission lines based, at least in part, on the transmission line configuration control data.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
identifying bad data on which at least a portion of the first network topology model is based.

### Claim 3 (depends on 1)

The method of claim 1, wherein at least some of the transmission lines of the plurality of transmission lines are high-voltage transmission lines.

### Claim 4 (depends on 1)

The method of claim 1, wherein generating the first topology error estimation includes minimizing J(r)=½rTWr subject to
r=z−h(x),
c(x)=0, and
d(x,y)≤0
where
x is an nsv×1 vector of state variables namely xT=[θT, vT, PsT, QsT],
θT is an n×1 vector of node/bus voltage angles,
vT is an n×1 vector of node/bus voltage magnitudes,
Ps is an ns×1 vector of MW flows through switches that are represented in a physical model,
Qs is an ns×1 vector of MVAR flows through switches that are represented in the physical model,
y is an ns×1 vector of binary variables that correspond to switches that are represented in the physical model,
y
s
=
{
1
if
⁢
⁢
switch
⁢
⁢
s
⁢
⁢
is
⁢
⁢
closed
0
if
⁢
⁢
switch
⁢
⁢
s
⁢
⁢
is
⁢
⁢
open
,
z is an m×1 vector of measurements,
r is an m×1 vector of residuals between the measurements and the estimated value of the measurements,
W
=
R
z
-
1
=
[
σ
1
-
2
…
0
⋮
⋱
⋮
0
…
σ
m
-
2
]
,
W is a diagonal matrix whose elements are the measurement weights and Rz is a measurement covariance matrix,
h(x) is an m×1 vector of non-linear functions that express the measurements in terms of the state variables,
c(x) is an nec×1 vector function of equality constraints, and
d(x,y) is an nic×1 vector function of inequality constraints.

### Claim 5 (depends on 4)

The method of claim 4, wherein the inequality constraints include:
−ysM≤Pss≤ysM,
−ysM≤Qss≤ysM,
−(1−ys)M≤(θi−θj)≤(1−ys)M, and
−(1−ys)M≤(vi−vj)≤(1−ys)M.

### Claim 6 (depends on 1)

The method of claim 1, wherein generating the first topology error estimation includes minimizing J(r)=½rTWr subject to
r=z−h(x),
c(x)=0, and
d(x,y)≤0
where
x is an nsv×1 vector of state variables namely xT=[θT, PsT]
θT is an n×1 vector of node/bus voltage angles,
Ps is an ns×1 vector of MW flows through switches that are represented in a physical model,
y is an ns×1 vector of binary variables that correspond to switches that are represented in the physical model,
y
s
=
{
1
if
⁢
⁢
switch
⁢
⁢
s
⁢
⁢
is
⁢
⁢
closed
0
if
⁢
⁢
switch
⁢
⁢
s
⁢
⁢
is
⁢
⁢
open
,
z is an m×1 vector of measurements,
r is an m×1 vector of residuals between the measurements and an estimated value of the measurements,
W is a diagonal matrix whose elements are measurement weights,
h(x) is an m×1 vector of linear functions that express the measurements in terms of the state variables,
c(x) is an nec×1 vector function of equality constraints, and
d(x,y) is an nic×1 vector function of inequality constraints.

### Claim 7 (depends on 6)

The method of claim 6, wherein the inequality constraints include:
−ysM≤Pss≤ysM
−(1−ys)M≤(θi−θi)≤(1−ys)M.

### Claim 8 (depends on 1)

The method of claim 1, further comprising:
operating the at least one electric generator resource so as to modify the generated electric power output level in accordance with the electric generator resource control data.

### Claim 9 (depends on 1)

The method of claim 1, further comprising:
configuring the plurality of transmission lines in accordance with the transmission line configuration control data.

### Claim 10

An electric power system, comprising:
a plurality of electric generator resources, each electric generator resource configured to operate in accordance with electric generator resource control data;
a plurality of transmission lines, each transmission line coupled to at least one electric generator resource;
a plurality of telemetered switching devices, each telemetered switching device coupled to at least one transmission line of the plurality of transmission lines;
a plurality of non-telemetered switching devices, each non-telemetered switching device coupled to at least one transmission line of the plurality of transmission lines; and
an energy management system coupled to the plurality of electric generator resources, the plurality of transmission lines, and at least one telemetered switching device, the energy management system comprising:
a processor, a memory, and a plurality of instructions stored in the memory that, when executed by the processor, cause the energy management system to:
generate a first network topology model of the electric power system;
generate a first state estimation of the electric power system based, at least in part, on the first network topology model;
generate a first topology error estimation based, at least in part, on the first state estimation of the electric power system;
generate a second network topology model of the electric power system based, at least in part, on the first network topology model of the electric power system and the first topology error estimation;
generate a second state estimation of the electric power system based, at least in part, on the second network topology model of the electric power system;
determine an optimized schedule of power generation for one or more electric generator resources of the plurality of electric generator resources, based at least in part on the second state estimation;
determine an optimized configuration of one or more transmission lines of the plurality of transmission lines, based at least in part on the second state estimation;
generate electric generator resource control data based, at least in part, on the optimized schedule of power generation;
generate transmission line configuration control data based, at least in part, on the optimized configuration of one or more transmission lines;
manage a generated electric power output level of at least one electric generator resource based, at least in part, on the electric generator resource control data; and
manage a configuration of one or more transmission lines based, at least in part, on the transmission line configuration control data;
wherein the instructions that, when executed by the processor cause the energy management system to generate a first topology estimation of the electric power system further cause the energy management system to include binary variables corresponding to a status of one or more of the telemetered or non-telemetered switches.

### Claim 11 (depends on 10)

The electric power system of claim 10, wherein the instructions stored in the memory, when executed by the processor, further cause the energy management system to:
identify bad data on which at least a portion of the first network topology model is based.

### Claim 12 (depends on 10)

The electric power system of claim 10, wherein at least some of the transmission lines of the plurality of transmission lines are high-voltage transmission lines.

### Claim 13 (depends on 10)

The electric power system of claim 10, wherein the instructions stored in the memory, when executed by the processor, further cause the energy management system to:
generate the first topology error estimation by minimizing J(r)=½rTWr subject to
r=z−h(x),
c(x)=0, and
d(x,y)≤0
where
x is an nsv×1 vector of state variables namely xT=[θT, vT, PsT, QsT],
θT is an n×1 vector of node/bus voltage angles,
vT is an n×1 vector of node/bus voltage magnitudes,
Ps is an ns×1 vector of MW flows through switches that are represented in a physical model,
Qs is an ns×1 vector of MVAR flows through switches that are represented in the physical model,
y is an ns×1 vector of binary variables that correspond to switches that are represented in the physical model,
y
s
=
{
1
if
⁢
⁢
switch
⁢
⁢
s
⁢
⁢
is
⁢
⁢
closed
0
if
⁢
⁢
switch
⁢
⁢
s
⁢
⁢
is
⁢
⁢
open
,
z is an m×1 vector of measurements,
r is an m×1 vector of residuals between measurements and an estimated value of those measurements,
W
=
R
z
-
1
=
[
σ
1
-
2
…
0
⋮
⋱
⋮
0
…
σ
m
-
2
]
,
W is a diagonal matrix whose elements are measurement weights and Rz is a measurement covariance matrix,
h(x) is an m×1 vector of non-linear functions that express the measurements in terms of state variables,
c(x) is an nec×1 vector function of equality constraints, and
d(x,y) is an nic×1 vector function of inequality constraints.

### Claim 14 (depends on 13)

The electric power system of claim 13, wherein the inequality constraints include:
−ysM≤Psx≤yxM,
−ysM≤Qss≤ysM,
−(1−ys)M≤(θi−θj)≤(1−ys)M, and
−(1−ys)M≤(vi−vj)≤(1−ys)M.

### Claim 15 (depends on 10)

The electric power system of claim 10, wherein the instructions stored in the memory, when executed by the processor, further cause the energy management system to:
generate the first topology error estimation by minimizing J(r)=½rTWr subject to
r=z−h(x),
c(x)=0, and
d(x,y)≤0
where
x is an nsv×1 vector of state variables namely xT=[θT, PsT]
θT is an n×1 vector of node/bus voltage angles,
Ps is an ns×1 vector of MW flows through switches that are represented in a physical model,
y is an ns×1 vector of binary variables that correspond to switches that are represented in the physical model,
y
s
=
{
1
if
⁢
⁢
switch
⁢
⁢
s
⁢
⁢
is
⁢
⁢
closed
0
if
⁢
⁢
switch
⁢
⁢
s
⁢
⁢
is
⁢
⁢
open
,
z is an m×1 vector of measurements,
r is an m×1 vector of residuals between measurements and an estimated value of those measurements,
W is a diagonal matrix whose elements are measurement weights,
h(x) is an m×1 vector of linear functions that express measurements in terms of the state variables,
c(x) is an nec×1 vector function of equality constraints, and
d(x,y) is an nic×1 vector function of inequality constraints.

### Claim 16 (depends on 15)

The electric power system of claim 15, wherein the inequality constraints include:
−ysM≤Pss≤ysM
−(1−ys)M≤(θi−θj)≤(1−ys)M.

### Claim 17 (depends on 10)

The electric power system of claim 10, wherein the instructions stored in the memory, when executed by the processor, further cause the energy management system to:
operate the at least one electric generator resource so as to modify the generated electric power output level in accordance with the electric generator resource control data.

### Claim 18 (depends on 10)

The electric power system of claim 10, wherein the instructions stored in the memory, when executed by the processor, further cause the energy management system to:
configure the plurality of transmission lines in accordance with the transmission line configuration control data.

### Claim 19 (depends on 10)

The electric power system of claim 10, wherein the instructions stored in the memory, when executed by the processor, further cause the energy management system to:
represent a first portion of the electric power system at a switch/node level; and
represent a second portion of the electric power system at a bus/branch level.

### Claim 20 (depends on 10)

The electric power system of claim 10, wherein the instructions stored in the memory, when executed by the processor, further cause the energy management system to: