# US 10,956,842 B2 · Central plant with asset allocator

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 10,956,842 B2
- Document ID: US10956842B2
- Status: Granted
- Kind: B2
- Application number: 16/601,377
- Filed: 2019-10-14
- Published: 2020-02-06
- Granted: 2021-03-23
- Earliest claimed: 2017-03-29
- Assignees: Johnson Controls Technology Company
- Applicants: Johnson Controls Technology Company
- Inventors: Michael J. Wenzel; Matthew J. Ellis
- Web page: https://patentgrep.com/patent/US10956842B2

## CPC

- G06Q 10/06313: {Resource planning in a project environment}
- G05B 13/021: {in which a variable is automatically adjusted to optimise the performance}
- G06Q 10/0631: Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q 50/06: Energy or water supply
- H02J 3/00: Circuit arrangements for AC mains or AC distribution networks
- H02J 3/008: Circuit arrangements for power supply or distribution technologies responsive to energy trading
- H02J 3/14: by switching loads on to, or off from, the networks, e.g. progressively balanced loading
- H02J 3/28: Arrangements for balancing of the load in networks by storage of energy
- H02J 3/32: using batteries or super capacitors with converting means
- H02J 3/38: Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- H02J 2105/12: supplying households or buildings
- Y02B 70/3225: Demand response systems, e.g. load shedding, peak shaving
- Y02E 60/00: Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y04S 20/222: Demand response systems, e.g. load shedding, peak shaving
- Y04S 40/20: Information technology specific aspects, e.g. CAD, simulation, modelling, system security
- Y04S 50/10: Energy trading, including energy flowing from end-user application to grid
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

A controller for central plant equipment obtains a model of one or more sources configured to supply input resources, one or more subplants configured to convert the input resources to output resources, and one or more sinks configured to consume the output resources. The controller generates a resource balance constraint that requires balance between a first amount of each resource and a second amount of each resource. The first amount of each resource includes a sum of an amount of the resource supplied by the sources and an amount of the resource produced by the subplants. The second amount of each resource includes a sum of an amount of the resource consumed by the subplants and an amount of the resource consumed by the sinks. The controller performs an optimization of an objective function subject to the resource balance constraint to determine target amounts of each resource to be produced or consumed by the central plant equipment at a plurality of times within an optimization period. The controller controls the central plant equipment to produce or consume the target amounts of each resource at the plurality of times within the optimization period.

## Claims

### Claim 1

A controller for central plant equipment that operate to consume input resources from one or more utilities to produce output resources provided to a building or campus to serve energy loads of the building or campus, the controller comprising:
a processing circuit comprising one or more processors and memory storing instructions that, when executed by the one or more processors, cause the one or more processors to perform operations comprising:
obtaining a model comprising one or more sources configured to supply the input resources, one or more subplants configured to convert the input resources to the output resources, and one or more sinks configured to consume the output resources;
generating a resource balance constraint that requires balance between a first amount of each resource and a second amount of each resource, wherein:
the first amount of each resource comprises a sum of an amount of the resource supplied by the sources and an amount of the resource produced by the subplants; and
the second amount of each resource comprises a sum of an amount of the resource consumed by the subplants and an amount of the resource consumed by the sinks;
performing an optimization of an objective function subject to the resource balance constraint to determine amounts of each resource to be produced or consumed by the central plant equipment at a plurality of times within an optimization period; and
sending, from the processing circuit to the central plant equipment, electronic communications comprising operating parameters that cause the central plant equipment to produce or consume the amounts of each resource at the plurality of times within the optimization period.

### Claim 2 (depends on 1)

The controller of claim 1, wherein:
each of the sources represents one of the utilities;
each of the subplants represents a subset of the central plant equipment; and
each of the sinks represents one of the energy loads of the building or campus.

### Claim 3 (depends on 1)

The controller of claim 1, the central plant equipment further comprising storage equipment configured to store and discharge one or more of the resources, the storage equipment comprising at least one of thermal energy storage or electrical energy storage.

### Claim 4 (depends on 3)

The controller of claim 3, wherein:
the model further comprises one or more storage elements representing the storage equipment and configured to store and discharge one or more of the resources;
the first amount of each resource comprises a sum of the amount of the resource supplied by the sources, the amount of the resource produced by the subplants, and an amount of the resource discharged by the storage elements; and
the second amount of each resource comprises a sum of the amount of the resource consumed by the subplants, the amount of the resource consumed by the sinks, and an amount of the resource charged into the storage elements.

### Claim 5 (depends on 3)

The controller of claim 3, the operations further comprising adding one or more continuous decision variables to the objective function for each resource stored or discharged by the storage equipment.

### Claim 6 (depends on 3)

The controller of claim 3, the operations further comprising generating a storage constraint for the storage equipment, the storage constraint comprising at least one of:
a constraint linking decision variables adjacent in time; and
a constraint linking a state-of-charge of the storage equipment to a charge or discharge rate of the storage equipment;
wherein the optimization of the objective function is performed subject to both the resource balance constraint and the storage constraint.

### Claim 7 (depends on 1)

The controller of claim 1, the operations further comprising generating an operational domain constraint for each of the subplants, each operational domain defining a relationship between an amount of each resource consumed by the subplant and an amount of each resource produced by the subplant;
wherein the optimization of the objective function is performed subject to both the resource balance constraint and the operational domain constraint.

### Claim 8 (depends on 1)

The controller of claim 1, wherein:
the model further comprises connections between the sources, subplants, and sinks, the connections defining which of the subplants are capable of receiving the input resources from each of the sources or from other subplants and which of the subplants are capable of providing the output resources to each of the sinks or to other subplants; and
the resource balance constraint is generated using the connections.

### Claim 9 (depends on 8)

The controller of claim 8, the operations further comprising:
determining an efficiency associated with each of the connections, each efficiency defining a resource loss incurred when transporting a resource along one of the connections; and
modifying the resource balance constraint to account for the resource losses.

### Claim 10 (depends on 1)

The controller of claim 1, the operations further comprising adding one or more continuous decision variables to the objective function for each resource produced by the subplants or consumed by the subplants.

### Claim 11 (depends on 10)

The controller of claim 10, the operations further comprising:
identifying an operational domain for each of the subplants, each operational domain defining a relationship between an amount of each resource consumed by the subplant and an amount of each resource produced by the subplant;
adding one or more integer decision variables to the objective function in response to the operational domain having multiple convex regions; and
adding constraints linking the continuous decision variables to the integer decision variables to force the controller to choose values of resources consumed and produced that exist only in the operational domain when performing the optimization of the objective function.

### Claim 12 (depends on 1)

The controller of claim 1, wherein the first amount of each resource further comprises an amount of unmet load and the second amount of each resource further comprises an amount of overmet load;
wherein the objective function comprises a penalty that depends on at least one of the amount of unmet load or the amount of overmet load.

### Claim 13 (depends on 1)

The controller of claim 1, wherein the objective function comprises a rate of change penalty that depends on an amount by which a decision variable changes between a first time within the optimization period and a second time within the optimization period.

### Claim 14

A method for controlling central plant equipment to consume input resources from one or more utilities to produce output resources provided to a building or campus to serve energy loads of the building or campus, the method comprising:
obtaining a model comprising one or more sources configured to supply the input resources, one or more subplants configured to convert the input resources to the output resources, and one or more sinks configured to consume the output resources;
generating a resource balance constraint that requires balance between a first amount of each resource and a second amount of each resource, wherein:
the first amount of each resource comprises a sum of an amount of the resource supplied by the sources and an amount of the resource produced by the subplants; and
the second amount of each resource comprises a sum of an amount of the resource consumed by the subplants and an amount of the resource consumed by the sinks;
performing an optimization of an objective function subject to the resource balance constraint to determine amounts of each resource to be produced or consumed by the central plant equipment at a plurality of times within an optimization period; and
electronically communicating operating parameters to the central plant equipment, wherein the operating parameters cause the central plant equipment to operate to produce or consume the amounts of each resource at the plurality of times within the optimization period.

### Claim 15 (depends on 14)

The method of claim 14, wherein:
each of the sources represents one of the utilities;
each of the subplants represents a subset of the central plant equipment; and
each of the sinks represents one of the energy loads of the building or campus.

### Claim 16 (depends on 14)

The method of claim 14, comprising generating an operational domain constraint for each of the subplants, each operational domain defining a relationship between an amount of each resource consumed by the subplant and an amount of each resource produced by the subplant;
wherein the optimization of the objective function is performed subject to both the resource balance constraint and the operational domain constraint.

### Claim 17 (depends on 14)

The method of claim 14, wherein the model further comprises connections between the sources, subplants, and sinks, the connections defining which of the subplants are capable of receiving the input resources from each of the sources or from other subplants and which of the subplants are capable of providing the output resources to each of the sinks or to other subplants; and
the resource balance constraint is generated using the connections.

### Claim 18 (depends on 14)

The method of claim 14, wherein:
the model further comprises one or more storage elements representing storage equipment of the central plant equipment configured to store and discharge one or more of the resources;
the first amount of each resource comprises a sum of the amount of the resource supplied by the sources, the amount of the resource produced by the subplants, and an amount of the resource discharged by the storage elements; and
the second amount of each resource comprises a sum of the amount of the resource consumed by the subplants, the amount of the resource consumed by the sinks, and an amount of the resource charged into the storage elements.

### Claim 19 (depends on 18)

The method of claim 18, comprising generating a storage constraint for the storage equipment, the storage constraint comprising at least one of:
a constraint linking decision variables adjacent in time; and
a constraint linking a state-of-charge of the storage equipment to a charge or discharge rate of the storage equipment;
wherein the optimization of the objective function is performed subject to both the resource balance constraint and the storage constraint.

### Claim 20 (depends on 17)

The method of claim 17, comprising:
determining an efficiency associated with each of the connections, each efficiency defining a resource loss incurred when transporting a resource along one of the connections; and
modifying the resource balance constraint to account for the resource losses.

### Claim 21 (depends on 14)

The method of claim 14, wherein the first amount of each resource further comprises an amount of unmet load and the second amount of each resource further comprises an amount of overmet load;
wherein the objective function comprises a penalty that depends on at least one of the amount of unmet load or the amount of overmet load.

### Claim 22 (depends on 14)

The method of claim 14, wherein the objective function comprises a rate of change penalty that depends on an amount by which a decision variable changes between a first time within the optimization period and a second time within the optimization period.

### Claim 23

A controller for equipment that operate to consume input resources to produce output resources, the controller comprising:
a processing circuit comprising one or more processors and memory storing instructions that, when executed by the one or more processors, cause the one or more processors to perform operations comprising:
obtaining a model comprising one or more sources configured to supply the input resources, one or more subplants configured to convert the input resources to the output resources, and one or more sinks configured to consume the output resources;
generating a constraint that requires a first amount of each resource to be equal to a second amount of each resource, wherein:
the first amount of each resource comprises a sum of an amount of the resource supplied by the sources and an amount of the resource produced by the subplants; and
the second amount of each resource comprises a sum of an amount of the resource consumed by the subplants and an amount of the resource consumed by the sinks;
performing an optimization of an objective function subject to the constraint to determine amounts of each resource to be produced or consumed by the equipment at a plurality of times within an optimization period; and
sending electronic communications to the equipment that cause the equipment to operate in accordance with the electronic communications to produce or consume the amounts of each resource at the plurality of times within the optimization period.

### Claim 24 (depends on 23)

The controller of claim 23, wherein the model comprises connections between the sources, subplants, and sinks;
the operations further comprising:
determining an efficiency associated with each of the connections, each efficiency defining a resource loss incurred when transporting a resource along one of the connections; and
modifying the constraint to account for the resource losses.

### Claim 25 (depends on 23)

The controller of claim 23, wherein the first amount of each resource further comprises an amount of unmet load and the second amount of each resource further comprises an amount of overmet load;
wherein the objective function comprises a penalty that depends on at least one of the amount of unmet load or the amount of overmet load.

### Claim 26 (depends on 23)

The controller of claim 23, wherein the objective function comprises a rate of change penalty that depends on an amount by which a decision variable changes between a first time within the optimization period and a second time within the optimization period.

### Claim 27

A method for controlling equipment that consume input resources and produce output resources for use in serving energy loads of a building or campus, the method comprising:
obtaining a model comprising one or more sources configured to supply the input resources, one or more subplants configured to convert the input resources to the output resources, and one or more sinks configured to consume the output resources;
generating a resource balance constraint that requires balance between a first amount of each resource and a second amount of each resource, wherein:
the first amount of each resource comprises a sum of an amount of the resource supplied by the sources and an amount of the resource produced by the subplants; and
the second amount of each resource comprises a sum of an amount of the resource consumed by the subplants and an amount of the resource consumed by the sinks;
using the resource balance constraint to determine amounts of each resource to be produced or consumed by the equipment at a plurality of times within a time period; and
electronically communicating operating parameters to the equipment that cause the equipment to produce or consume the amounts of each resource at the plurality of times within the time period.

### Claim 28 (depends on 27)

The method of claim 27, wherein the first amount of each resource further comprises an amount of unmet load and the second amount of each resource further comprises an amount of overmet load;
wherein the amounts of each resource to be produced or consumed by the equipment are determined using a penalty that depends on at least one of the amount of unmet load or the amount of overmet load.

### Claim 29 (depends on 28)

The method of claim 28, wherein the second amount of each resource further comprises an amount of carryover representing an accumulated amount of the unmet load or the overmet load from one or more previous times within the time period.

### Claim 30 (depends on 27)

The method of claim 27, wherein the amounts of each resource to be produced or consumed by the equipment are determined using a rate of change penalty that depends on an amount by which a decision variable changes between a first time within the time period and a second time within the time period.