# US 10,956,839 B2 · Server tool

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 10,956,839 B2
- Document ID: US10956839B2
- Status: Granted
- Kind: B2
- Application number: 16/267,594
- Filed: 2019-02-05
- Published: 2020-08-06
- Granted: 2021-03-23
- Earliest claimed: 2019-02-05
- Assignees: Bank of America Corporation
- Applicants: Bank of America Corporation
- Inventors: Karthik Rajan Venkataraman Palani
- Web page: https://patentgrep.com/patent/US10956839B2

## CPC

- G06Q 10/04: Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q30/0202)
- G06N 20/00: Machine learning
- G06Q 10/0631: Resource planning, allocation, distributing or scheduling for enterprises or organisations
- H04L 41/145: {involving simulating, designing, planning or modelling of a network}
- H04L 41/149: for prediction of maintenance
- H04L 41/16: using machine learning or artificial intelligence
- H04L 67/10: in which an application is distributed across nodes in the network (software deployment G06F8/60; multiprogramming arrangements G06F9/46)
- H04L 67/1025: Dynamic adaptation of the criteria on which the server selection is based
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

A memory stores a log that includes first, second, and third datasets each containing server information collected at different times. The processor forms vectors from the datasets, calculates distance vectors between them and uses the distance vectors and pairwise angles between distance vectors to predict a dataset for a first future time. When the first future time arrives, the processor collects the server information, stores it in a fourth dataset, and calculates a variance between that dataset and the predicted dataset. Using the variance, distance vectors, and angles, the processor determines a second predicted dataset corresponding to a second future time, from which it determines a server usage prediction. If the server usage prediction is below a decommission threshold, the processor decommissions the server. If the server usage prediction is above a capacity threshold, the processor generates a report advising an administrator to upgrade or remove projects from the server.

## Claims

### Claim 1

An apparatus comprising:
a memory configured to store a set of instructions and a server log comprising:
a first historical dataset comprising a set of information collected from a first server at a first time;
a second historical dataset comprising the set of information collected from the first server at a second time later than the first time; and
a third historical dataset comprising the set of information collected from the server at a third time later than the second time; and
a hardware processor communicatively coupled to the memory, the hardware processor configured to:
form a first vector from the first historical dataset;
form a second vector from the second historical dataset;
form a third vector from the third historical dataset;
calculate a first distance vector based on a distance from the first vector to the second vector;
calculate a second distance vector based on a distance from the first vector to the third vector;
calculate a first angle based on a dot product between the first distance vector and the second distance vector;
determine, prior to a first future time later than the third time, based at least in part on the first distance vector, the second distance vector, and the first angle, a first predicted dataset corresponding to the first future time;
collect the set of server information at the first future time and store the set of server information collected at the first future time in a fourth historical dataset;
calculate a variance between the fourth historical dataset and the first predicted dataset;
determine, prior to a second future time later than the first future time, based at least in part on the first distance vector, the second distance vector, the first angle, and the variance, a second predicted dataset corresponding to the second future time;
determine, based on the second predicted dataset, a server usage prediction for the second future time;
determine, based on the set of instructions and the server usage prediction, that a project should be moved from the first server to a second server;
move the project from the first server to the second server;
determine that the server usage prediction is below a decommission threshold;
in response to determining that the server usage prediction is below the decommission threshold, decommission the first server;
determine that the server usage prediction is above a capacity threshold; and
in response to determining that the server usage prediction is above a capacity threshold, generate a report advising an administrator to upgrade the first server or remove projects from the first server.

### Claim 2 (depends on 1)

The apparatus of claim 1, wherein determining the first predicted dataset and the second predicted dataset comprises using a machine learning model.

### Claim 3 (depends on 1)

The apparatus of claim 1, wherein the set of instructions includes a list of software that is not installed on the second server and is needed to run the project; and
the processor is further configured to install the list of software on the second server.

### Claim 4 (depends on 1)

The apparatus of claim 1, wherein the set of information comprises at least one of peak-usage information, user login information, and processor usage.

### Claim 5 (depends on 1)

The apparatus of claim 1, wherein the first vector, the second vector, and the third vector are normalized.

### Claim 6 (depends on 1)

The apparatus of claim 1, wherein the decommission threshold and the capacity threshold are set by the administrator.

### Claim 7

A method comprising:
accessing a server log stored in a memory, the server log comprising:
a first historical dataset comprising a set of information collected from a first server at a first time;
a second historical dataset comprising the set of information collected from the first server at a second time later than the first time; and
a third historical dataset comprising the set of information collected from the server at a third time later than the second time;
forming a first vector from the first historical dataset;
forming a second vector from the second historical dataset;
forming a third vector from the third historical dataset;
calculating a first distance vector based on a distance from the first vector to the second vector;
calculating a second distance vector based on a distance from the first vector to the third vector;
calculating a first angle based on a dot product between the first distance vector and the second distance vector;
determining, prior to a first future time later than the third time, based at least in part on the first distance vector, the second distance vector, and the first angle, a first predicted dataset corresponding to the first future time;
collecting the set of server information at the first future time and storing the set of server information collected at the first future time in a fourth historical dataset;
calculating a variance between the fourth historical dataset and the first predicted dataset;
determining, prior to a second future time later than the first future time, based at least in part on the first distance vector, the second distance vector, the first angle, and the variance, a second predicted dataset corresponding to the second future time;
determining, based on the second predicted dataset, a server usage prediction for the second future time;
accessing a set of instructions stored in the memory;
determining, based on the set of instructions and the server usage prediction, that a project should be moved from the first server to a second server;
moving the project from the first server to the second server;
determining that the server usage prediction is below a decommission threshold;
in response to determining that the server usage prediction is below the decommission threshold, decommissioning the first server;
determining that the server usage prediction is above a capacity threshold; and
in response to determining that the server usage prediction is above a capacity threshold, generating a report advising an administrator to upgrade the first server or remove projects from the first server.

### Claim 8 (depends on 7)

The method of claim 7, wherein determining the first predicted dataset and the second predicted dataset comprises using a machine learning model.

### Claim 9 (depends on 7)

The method of claim 7, further comprising:
installing a list of software on the second server, wherein the list of software is stored in the set of instructions and comprises software that is not installed on the second server and that is needed to run the project.

### Claim 10 (depends on 7)

The method of claim 7, wherein the set of information comprises at least one of peak-usage information, user login information, and processor usage.

### Claim 11 (depends on 7)

The method of claim 7, wherein the first vector, the second vector, and the third vector are normalized.

### Claim 12 (depends on 7)

The method of claim 7, wherein the decommission threshold and the capacity threshold are set by the administrator.

### Claim 13

A system comprising:
a storage element operable to store:
a set of instructions;
a first historical dataset comprising a set of information collected from a first server at a first time;
a second historical dataset comprising the set of information collected from the first server at a second time later than the first time; and
a third historical dataset comprising the set of information collected from the server at a third time later than the second time; and
a processing element communicatively coupled to the storage element and operable to:
form a first vector from the first historical dataset;
form a second vector from the second historical dataset;
form a third vector from the third historical dataset;
calculate a first distance vector based on a distance from the first vector to the second vector;
calculate a second distance vector based on a distance from the first vector to the third vector;
calculate a first angle based on a dot product between the first distance vector and the second distance vector;
determine, prior to a first future time later than the third time, using machine learning based at least in part on the first distance vector, the second distance vector, and the first angle, a first predicted dataset corresponding to the first future time;
collect the set of server information at the first future time and store the set of server information collected at the first future time in a fourth historical dataset;
calculate a variance between the fourth historical dataset and the first predicted dataset;
determine, prior to a second future time later than the first future time, using machine learning based at least in part on the first distance vector, the second distance vector, the first angle, and the variance, a second predicted dataset corresponding to the second future time;
determine, based on the second predicted dataset, a server usage prediction for the second future time;
determine, based on the set of instructions and the server usage prediction, that a project should be moved from the first server to a second server;
move the project from the first server to the second server;
determine that the server usage prediction is below a decommission threshold;
in response to determining that the server usage prediction is below the decommission threshold, decommission the first server;
determine that the server usage prediction is above a capacity threshold; and
in response to determining that the server usage prediction is above a capacity threshold, generate a report advising an administrator to upgrade the first server or remove projects from the first server.

### Claim 14 (depends on 13)

The system of claim 13, wherein the set of instructions includes a list of software that is not installed on the second server and is needed to run the project; and
the processing element is further operable to install the list of software on the second server.

### Claim 15 (depends on 13)

The system of claim 13, wherein the set of information comprises at least one of peak-usage information, user login information, and processor usage.

### Claim 16 (depends on 13)

The system of claim 13, wherein the first vector, the second vector, and the third vector are normalized.

### Claim 17 (depends on 13)

The system of claim 13, wherein the decommission threshold and the capacity threshold are set by the administrator.
