# US 10,955,478 B2 · Method for monitoring an electromagnetic actuator type apparatus

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 10,955,478 B2
- Document ID: US10955478B2
- Status: Granted
- Kind: B2
- Application number: 16/489,529
- Filed: 2018-02-21
- Published: 2020-04-16
- Granted: 2021-03-23
- Earliest claimed: 2017-03-06
- Assignees: Safran Electronics & Defense; Centre National De La Recherche Scientifique
- Applicants: Safran Electronics & Defense; Centre National De La Recherche Scientifique
- Inventors: Romain Breuneval; Badr Mansouri; Emmanuel Boutleux; Guy Clerc; Julien Huillery; Ryan Michaud
- Web page: https://patentgrep.com/patent/US10955478B2

## CPC

- G01R 31/343: {in operation}
- G01M 13/02: Gearings; Transmission mechanisms
- G01R 31/008: {on air- or spacecraft, railway rolling stock or sea-going vessels}
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- G01M: TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR

## Abstract

A monitoring method for monitoring equipment of electromechanical actuator type, the equipment including a three-phase electric motor, the monitoring method comprising the following steps: measuring three-phase currents powering the three-phase electric motor; projecting the three-phase currents into a Park reference frame; performing an ensemblist empirical mode decomposition processor the quadrature current coupled with a blind source separation process in order to obtain source components; from among the source components, automatically selecting a first set of source components sensitive to a first defect, and a second set of source components sensitive to a second defect; constructing a first virtual defect signal and a second virtual defect signal; and extracting a first set of signatures representative of the first defect from the first virtual defect signal, and extracting a second set of signatures representative of the second defect from the second virtual defect signal.

## Claims

### Claim 1

A monitoring method for monitoring estimating a state of equipment of electromechanical actuator type, the equipment including a three-phase electric motor, the monitoring method comprising:
measuring three-phase currents powering the three-phase electric motor;
projecting the three-phase currents into a Park reference frame in order to obtain a quadrature current;
performing an ensemblist empirical mode decomposition process on the quadrature current coupled with a blind source separation process in order to obtain source components;
from among the source components, automatically selecting a first set of source components sensitive to a first defect, and a second set of source components sensitive to a second defect by using a selection criterion, the first defect and the second defect potentially degrading the operation of the equipment;
constructing a first virtual defect signal ŝdef A from the first set of source components and a second virtual defect signal ŝdef B from the second set of source components;
extracting a first set of signatures representative of the first defect from the first virtual defect signal, and extracting a second set of signatures representative of the second defect from the second virtual defect signal:
calculating a severity sev(def4) for the first defect and a severity sev(defB) for the second defect:
estimating lifetime of the equipment based on a result of the calculation; and
operating the equipment in accordance with the estimated lifetime.

### Claim 2 (depends on 1)

The monitoring method according to claim 1, wherein the blind source separation process comprises independent component analysis using as its separation criterion a statistical independence criterion.

### Claim 3 (depends on 1)

The monitoring method according to claim 1, wherein the automatic selection is performed by using a selection criterion selected with reference to the first defect and to the second defect and based on a statistical characteristic of the first set of source components and of the second set of source components.

### Claim 4 (depends on 3)

The monitoring method according to claim 3, wherein the statistical characteristic is a Kurtosis.

### Claim 5 (depends on 1)

The monitoring method according to claim 1, wherein the first signature and/or the second signature signk is such that Signk=NbPeaks*AmpPP, where NbPeaks is the number of times the corresponding first virtual defect signal or second virtual defect signal becomes greater than a predefined threshold, and where AmpPP is a maximum peak to peak amplitude between two peaks of the corresponding first virtual defect signal or second virtual defect signal.

### Claim 6 (depends on 1)

The monitoring method according to claim 1, wherein a signature from among the signatures of the first set of signatures or of the second set of signatures is an rms value calculated using:
(
∑
t
=
1
T
⁢
s
^
k
⁡
(
t
)
2
)
1
2
where ŝk is the corresponding first virtual defect signal or the second virtual defect signal, T is the duration of ŝk, and t is time.

### Claim 7 (depends on 1)

The monitoring method according to claim 1, wherein a signature from among the first set of signatures or the second set of signatures is an energy calculated using:
(
∑
t
=
1
T
⁢
s
^
k
⁡
(
t
)
2
)
,
where ŝk is the corresponding first virtual defect signal or second virtual defect signal, T is the duration of ŝk, and t is time.

### Claim 8 (depends on 1)

The monitoring method according to claim 1, wherein the severity sev(defk) of the first defect or of the second defect is calculated from the signature signk of the corresponding first defect or second defect as follows:
sev
⁡
(
def
k
)
=

sign
k
-
sign
k
⁢
⁢
0


sign
k
⁢
⁢
0

where signko is the value of the signature for the corresponding first defect or second defect at the beginning of the equipment being put into service.

### Claim 9 (depends on 8)

The monitoring method according to claim 8, wherein the severity is calculated by a neural network or by a vector support machine or by a Bayesian network.

### Claim 10 (depends on 1)

The monitoring method according to claim 1, wherein the first defect or the second defect is a short circuit of an electric motor stator.

### Claim 11 (depends on 1)

The monitoring method according to claim 1, wherein the first defect or the second defect is seizing of a mechanical transmission.

### Claim 12 (depends on 1)

The monitoring method according to claim 1, wherein the three-phase currents powering the three-phase electric motor are measured synchronously.
