# US 10,955,446 B2 · Method for ascertaining the phase currents of an electric machine including a converter

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 10,955,446 B2
- Document ID: US10955446B2
- Status: Granted
- Kind: B2
- Application number: 16/094,735
- Filed: 2017-04-03
- Published: 2019-04-25
- Granted: 2021-03-23
- Earliest claimed: 2016-05-04
- Assignees: Robert Bosch GmbH; SEG Automotive Germany GmbH
- Applicants: Robert Bosch GmbH; Seg Automotive Germany GmbH
- Inventors: Arunkumar M S; Julian Roesner
- Web page: https://patentgrep.com/patent/US10955446B2

## CPC

- G01R 19/25: using digital measurement techniques
- G01R 25/00: Arrangements for measuring phase angle between a voltage and a current or between voltages or currents
- H02M 7/219: in a bridge configuration
- H02P 6/28: Arrangements for controlling current (H02P6/10 takes precedence)
- H02P 9/48: Arrangements for obtaining a constant output value at varying speed of the generator, e.g. on vehicle (H02P9/04 - H02P9/46 take precedence)
- H02M 1/0009: {Devices or circuits for detecting current in a converter}
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- H02M: APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF (transformers H01F; dynamo-electric converters H02K47/00; controlling transformers, reactors or choke coils, control or regulation of electric motors, generators or dynamo-electric converters H02P)
- H02P: CONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS

## Abstract

A method for ascertaining phase currents of an electric machine including a converter and stator including stator windings (phase number of at least three), in which the phase currents of measuring phases (at least two), are measured, the phase currents being measured in a measuring interval when the active switching elements of the measuring phases in a lowside path of the converter are activated in a switching interval delimited by a switching-on point-in-time and switching-off point-in-time, the phase currents of the remaining phases being determined arithmetically from the measured phase currents so that the measured phase currents, a spatial angle of the measuring phases, and a spatial angle of the remaining phases are used for arithmetic determination, in which the measuring interval is selected to be with respect to time outside a switching-on point-in-time or switching-off point-in-time of at least one of the active switching elements of the stator phases.

## Claims

### Claim 1

A method for ascertaining the phase currents of an electric machine, the method comprising:
measuring, the electric machine including a converter and a stator including stator windings having a phase number of at least three, the phase currents of a number of measuring phases, which is at least two, are measured, the phase currents of the measuring phases each being measured in a measuring interval when active switching elements associated with the measuring phases in a lowside path of the converter are activated in a switching interval which is delimited by a switching-on point in time and a switching-off point in time, the phase currents of the remaining phases being determined arithmetically from the measured phase currents so that at least the measured phase currents, a spatial angle of the measuring phases, and a spatial angle of the remaining phases are used for the arithmetic determination;
wherein the measuring interval is selected so that the switching-on point in time and the switching-off point in time of at least one of the active switching elements of the converter associated with the phases of the stator lie with respect to time outside of the measuring interval,
wherein the switching-on points in time and the switching-off points in time are determined and sorted in chronological sequence, a time difference between one of the switching-on points in time or one of the switching-off points in time and a directly adjacent one of the switching-on points in time or of the switching-off points in time is determined and compared to the measuring interval.

### Claim 2 (depends on 1)

The method of claim 1, wherein the measuring interval includes at least one settling time of at least one of the stator windings, a first measuring time for measuring a phase current of a first measuring phase and a further measuring time for measuring a phase current of a further measuring phase.

### Claim 3 (depends on 1)

The method of claim 1, wherein the measuring interval is selected so that the switching-on points in time and the switching-off points in time of the active switching elements in a highside path of the converter and/or the active switching elements in a lowside path of the converter associated with the phases of the stator lie with respect to time outside the measuring interval.

### Claim 4 (depends on 1)

The method of claim 1, wherein the measuring interval is selected and situated with respect to time between the switching-on points in time or switching-off points in time so that the time difference at least corresponds to the measuring interval.

### Claim 5 (depends on 1)

The method of claim 1, wherein the measuring interval is selected and situated with respect to time between the switching-on points in time or switching-off points in time so that at least two phase currents are measurable within the measuring interval.

### Claim 6 (depends on 1)

The method of claim 1, wherein the switching-on points in time and the switching-off points in time are recurring with respect to time, in particular periodically, and the measuring interval is ascertained again for each cycle.

### Claim 7 (depends on 1)

The method of claim 1, wherein it is carried out in the case of pulse width modulation mode and/or block mode of the converter.

### Claim 8 (depends on 1)

The method of claim 1, wherein the phase currents of at least two measuring phases are measured in the form of an aggregate current.

### Claim 9 (depends on 1)

The method of claim 1, wherein the spatial angle of the measuring phases and the remaining phases are determined on the basis of a geometrical arrangement of the measuring phases and the remaining phases in the electric machine.

### Claim 10 (depends on 1)

The method of claim 1, wherein the measuring interval includes at least one settling time of at least one of the stator windings, a first measuring time for measuring a phase current of a first measuring phase and a further measuring time for measuring a phase current of a further measuring phase, the settling time being between 10 microseconds and 20 microseconds, and the first measuring time and the further measuring time each being between 2 microseconds and 10 microseconds.

### Claim 11 (depends on 10)

The method of claim 10, the settling time being 13 microseconds, and the first measuring time and the further measuring time each being 3 microseconds.

### Claim 12 (depends on 1)

The method of claim 1, wherein the determined time difference between the one of the switching-on point in time or the one of the switching-off point in time and the directly adjacent one of the switching-on points in time or of the switching-off points in time is compared to the duration of the measuring interval.

### Claim 13 (depends on 1)

The method of claim 1, wherein the measuring interval is selected and situated with respect to time between the switching-on points in time or switching-off points in time so that at least two phase currents, which are the greatest possible number of phase currents, are measurable within the measuring interval.

### Claim 14

A processing unit for ascertaining the phase currents of an electric machine, comprising:
a processor configured to measure, the electric machine including a converter and a stator including stator windings having a phase number of at least three, the phase currents of a number of measuring phases, which is at least two, are measured, the phase currents of the measuring phases each being measured in a measuring interval when active switching elements associated with the measuring phases in a lowside path of the converter are activated in a switching interval which is delimited by a switching-on point in time and a switching-off point in time, the phase currents of the remaining phases being determined arithmetically from the measured phase currents so that at least the measured phase currents, a spatial angle of the measuring phases, and a spatial angle of the remaining phases are used for the arithmetic determination;
wherein the measuring interval is selected so that the switching-on point in time and the switching-off point in time of at least one of the active switching elements of the converter associated with the phases of the stator lie with respect to time outside the measuring interval,
wherein the switching-on points in time and the switching-off points in time are determined and sorted in chronological sequence, a time difference between one of the switching-on points in time or one of the switching-off points in time and a directly adjacent one of the switching-on points in time or of the switching-off points in time is determined and compared to the measuring interval.

### Claim 15

A motor vehicle electrical system, comprising:
a processing unit for ascertaining the phase currents of an electric machine, including:
a processor configured to measure, the electric machine including a converter and a stator including stator windings having a phase number of at least three, the phase currents of a number of measuring phases, which is at least two, are measured, the phase currents of the measuring phases each being measured in a measuring interval when active switching elements associated with the measuring phases in a lowside path of the converter are activated in a switching interval which is delimited by a switching-on point in time and a switching-off point in time, the phase currents of the remaining phases being determined arithmetically from the measured phase currents so that at least the measured phase currents, a spatial angle of the measuring phases, and a spatial angle of the remaining phases are used for the arithmetic determination;
wherein the measuring interval is selected so that the switching-on point in time and the switching-off point in time of at least one of the active switching elements of the converter associated with the phases of the stator lie with respect to time outside of the measuring interval,
wherein the switching-on points in time and the switching-off points in time are determined and sorted in chronological sequence, a time difference between one of the switching-on points in time or one of the switching-off points in time and a directly adjacent one of the switching-on points in time or of the switching-off points in time is determined and compared to the measuring interval.

### Claim 16

A non-transitory computer readable medium having computer program, which is executable by a processor, comprising:
a program code arrangement having program code for ascertaining the phase currents of an electric machine, the electric machine including a converter and a stator including stator windings having a phase number of at least three, by performing the following:
measuring the phase currents of a number of measuring phases, which is at least two, are measured, the phase currents of the measuring phases each being measured in a measuring interval when active switching elements associated with the measuring phases in a lowside path of the converter are activated in a switching interval which is delimited by a switching-on point in time and a switching-off point in time, the phase currents of the remaining phases being determined arithmetically from the measured phase currents so that at least the measured phase currents, a spatial angle of the measuring phases, and a spatial angle of the remaining phases are used for the arithmetic determination;
wherein the measuring interval the switching-on point in time and the switching-off point in time of at least one of the active switching elements of the converter associated with the phases of the stator lie with respect to time outside of the measuring interval,
wherein the switching-on points in time and the switching-off points in time are determined and sorted in chronological sequence, a time difference between one of the switching-on points in time or one of the switching-off points in time and a directly adjacent one of the switching-on points in time or of the switching-off points in time is determined and compared to the measuring interval.

### Claim 17 (depends on 16)

The computer readable storage medium of claim 16, wherein the measuring interval includes at least one settling time of at least one of the stator windings, a first measuring time for measuring a phase current of a first measuring phase and a further measuring time for measuring a phase current of a further measuring phase.