# US 10,954,686 B2 · System and method for installing a tensioning tendon in a wind turbine tower

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 10,954,686 B2
- Document ID: US10954686B2
- Status: Granted
- Kind: B2
- Application number: 15/753,214
- Filed: 2016-08-09
- Published: 2018-08-23
- Granted: 2021-03-23
- Earliest claimed: 2015-08-31
- Assignees: Siemens Gamesa Renewable Energy, Inc.; Wind Tower Technologies, LLC
- Applicants: Siemens Gamesa Renewable Energy, Inc.; Wind Tower Technologies, LLC
- Inventors: Matthew J. Chase; James D. Lockwood; Guy Russell
- Web page: https://patentgrep.com/patent/US10954686B2

## CPC

- E04H 12/16: Prestressed structures
- E04H 12/34: Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
- F03D 13/10: Assembly of wind motors; Arrangements for erecting wind motors
- F03D 13/20: Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
- Y02E 10/72: Wind turbines with rotation axis in wind direction
- Y02E 10/728: Onshore wind turbines
- E04H: BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL (foundations E02D)
- F03D: WIND MOTORS
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

A system and method for installing a post-tensioning tendon (130) in an equipment tower (100). A sheave frame (196) attaches to anchor rods (140), and a pulley (198) is mounted to the sheave frame through which a hoisting cable (197) is passed for connection to an end (138) of the tendon to lift the tendon to the anchor rods. A carriage assembly (150) having a shank (152) and a bearing plate platform (154) extending transversely from the shank for receiving a bearing plate (170) is attached to the tendon. The carriage assembly includes a deflecting surface (158) to deflect the carriage assembly away from the installed bearing plate upon lowering after tendon attachment. A pair of hydraulic jacks (210) tension the tendon to a desired load.

## Claims

### Claim 1

A system for installing a tensioning tendon into an equipment tower without the use of an overhead crane, the system comprising:
a sheave frame (196) attachable to a first anchor rod (139) that extends downward from a portion of an equipment tower (100);
a stability bar (190) disposed between the sheave frame (196) and a second anchor rod (141) that extends downward from the portion of the equipment tower (100), wherein the stability bar is configured to selectively adjust a distance between the first anchor rod and the second anchor rod;
a pulley (198) supported by the sheave frame (196) through which a hoisting cable (197) may be passed for connection to an end (138) of a tensioning tendon (130), the pulley (198) supported by the sheave frame (196) so the hoisting cable (197) can lift the tensioning tendon (130) to a position between the first anchor rod and the second anchor rod for attachment to the first and second anchor rods (139, 141),
wherein a sheave assembly comprising the sheave frame, the stability bar, and the pulley is configured to be selectively positionable along the first anchor rod and to be fixed to the first anchor rod once in a selected position, and
a carriage assembly (150) comprising a bearing plate platform (154) configured for receiving a bearing plate (170) attached to the end (138) of the tensioning tendon (130), the carriage assembly (150) attachable to the hoisting cable (197) such that lifting of the carriage assembly (150) with the hoisting cable (197) accomplishes lifting of the tensioning tendon (130) to the position for attachment.

### Claim 2 (depends on 1)

The system of claim 1, further comprising:
a first aperture (169) and a second aperture (171) formed in the bearing plate (170); and
wherein the pulley (198) is supported by the sheave frame (196) such that, when the sheave frame (196) and the stability bar (190) are attached to the anchor rods (139, 141), the hoisting cable (197) lifts the carriage assembly (150) to the position for attachment whereat the first and second apertures (169, 171) are in substantial alignment with the first and second anchor rods (139, 141) respectively.

### Claim 3 (depends on 2)

The system of claim 2, further comprising:
a winch (199);
wherein the hoisting cable (197) is operably connected with the winch (199) for alternatively winding and unwinding the hoisting cable (197) to alternatively lift and lower the carriage assembly (150).

### Claim 4 (depends on 3)

The system of claim 3, further comprising:
a shank (152) of the carriage assembly (150) from which the bearing plate platform (154) extends, the shank (152) comprising a deflecting surface (158) positioned with respect to the bearing plate platform (154) so that, after the bearing plate (170) is affixed to the first and second anchor rods (139, 141) and the carriage assembly (150) is being lowered, the deflecting surface (158) impinges on the bearing plate (170), thereby deflecting the carriage assembly (150) away from the bearing plate (170).

### Claim 5 (depends on 4)

The system of claim 4, wherein the deflecting surface (158) forms an obtuse angle with a vertical portion (156) of the carriage assembly (150) connected to the bearing plate platform (154).

### Claim 6 (depends on 1)

The system of claim 1, wherein the sheave assembly further comprises:
a first shackle (184) secured to the sheave frame and releasably connectable to the first anchor rod (139);
a second shackle (182) releasably connectable to the second anchor rod (141); and
wherein the stability bar (190) is operably connected to the first shackle (184) and the second shackle (182) to adjust the distance between the first anchor rod (139) and the second anchor rod (141).

### Claim 7 (depends on 6)

The system of claim 6, wherein the sheave assembly further comprises:
a first compression nut (194) for supporting the first shackle (184) and the sheave frame (196) on the first anchor rod (139); and
a second compression nut (192) for supporting the second shackle (182) on the second anchor rod (141).

### Claim 8 (depends on 1)

The system of claim 1, wherein the pulley (198) is mounted to the sheave frame (196) at an angle relative to the stability bar (190) to provide a direct centerline position of the hoisting cable (197) between the first anchor rod (139) and the second anchor rod (141).

### Claim 9 (depends on 1)

The system of claim 1, further comprising:
a winch (199), the hoisting cable (197) operably connected with the winch (199) for winding and unwinding the hoisting cable (197) to alternatively lift and lower the carriage assembly (150);
a shank (152) of the carriage assembly (150) from which the bearing plate platform (154) extends, the shank (152) comprising a vertical portion (156) and a deflecting surface (158) whereby the deflecting surface (158) forms an obtuse angle with the vertical portion (156);
a pivot rod (174) extending through the shank (152);
a flange (176) connectable to the hoisting cable (197), the pivot rod (174) extending through the flange (176) to allow the carriage assembly (150) to pivot about the pivot rod (174);
a locking mechanism (179) operable to prevent the carriage assembly (150) from pivoting about the pivot rod (174) when in an engaged position; and
whereby the deflecting surface (158) is positioned with respect to the bearing plate platform (154) such that, after the bearing plate (170) is affixed to the first and second anchor rods (139, 141) and the carriage assembly (150) is being lowered, the deflecting surface (158) impinges on the bearing plate (170) thereby deflecting the carriage assembly (150) away from the bearing plate (170).

### Claim 10

A system for installing a tensioning tendon into an equipment tower without the use of an overhead crane, the system comprising:
a carriage assembly (150) configured for releasably securing an end (138) of a tensioning tendon (130);
a hoisting cable (197) attached to the carriage assembly (150);
a sheave assembly (180) attachable to a pair of anchor rods (140) that extend downward from an upper portion (108) of an equipment tower (100), wherein the sheave assembly is configured to be selectively positionable along the pair of anchor rods and to be fixed to the pair of anchor rods once in a selected position;
the hoisting cable (197) extending through the sheave assembly (180) and connected to a winch (199) at a base of the equipment tower (100), the winch (199) operable to lift the carriage assembly (150) toward the sheave assembly (180); and
wherein, when the sheave assembly (180) is secured to the pair of anchor rods (140), the hoisting cable (197) is positioned with respect to the pair of anchor rods (140) such that the hoisting cable (197) can be lifted to a position substantially centered between the pair of anchor rods (140).

### Claim 11 (depends on 10)

The system of claim 10, the carriage assembly (150) further comprising:
a shank (152);
a bearing plate platform (154) extending from the shank (152), the bearing plate platform (154) configured for receiving a bearing plate (170) attached to the end (138) of the tensioning tendon 9130); and
wherein, the shank (152) comprises a vertical portion (156) and a deflecting surface (158) angled with respect to the vertical portion (156) such that, after the bearing plate (170) is affixed to the pair of anchor rods (140) and the carriage assembly (150) is being lowered, the deflecting surface (158) impinges onto the bearing plate (170), thereby deflecting the carriage assembly (150) away from the bearing plate (170).

### Claim 12 (depends on 11)

The system of claim 11, wherein the deflecting surface (158) forms an obtuse angle with the vertical portion (156).

### Claim 13 (depends on 10)

The system of claim 10, the sheave assembly (180) further comprising:
a first shackle (184) configured for releasably connecting the sheave assembly (180) with a first anchor rod (139) of the pair of anchor rods (140) and a second shackle (182) configured for releasably connecting the sheave assembly (180) with a second anchor rod (141) of the pair of anchor rods (140);
a horizontal stability bar (190) connecting the first shackle (184) with the second shackle (182), the horizontal stability bar (190) inhibiting the sheave assembly (180) from torqueing during lifting of the tensioning tendon (130).

### Claim 14 (depends on 13)

The system of claim 13, wherein the horizontal stability bar (190) is configured to selectively adjust a distance between the first anchor rod and the second anchor rod.

### Claim 15

A method of installing a tensioning tendon into an equipment tower without the use of an overhead crane, the method comprising the steps of:
attaching a sheave assembly (180) to a pair of upper anchor rods (140) that extend downward from a portion of an equipment tower (100) by positioning the sheave assembly at a selected position along the pair of upper anchor rods and then fixing the sheave assembly to the pair of upper anchor rods at the selected position, the sheave assembly (180) comprising a pulley (198);
threading a hoisting cable (197) through the pulley (180), the hoisting cable (197) operably connected with a winch (199) for unwinding and winding the hoisting cable (197);
releasably securing an end of the hoisting cable (197) remote from the winch (199) to a carriage assembly (150) that is, in turn, secured to a second end (138) of the tensioning tendon (130), wherein the carriage assembly (150) comprises a bearing plate platform (154) configured for receiving a bearing plate (170) attached to the second end (138) of the tensioning tendon (130);
activating the winch (199) to lift the carriage assembly (150) and thereby lift the second end (138) of the tensioning tendon (130) to a position proximate the pair of upper anchor rods (140);
connecting the second end (138) of the tensioning tendon (130) to the pair of upper anchor rods (140);
connecting a first end (131) of the tensioning tendon (130) to a pair of lower anchor rods (134) of the equipment tower (100); and
activating a pair of hydraulic jacks (210) releasably attached to the pair of lower anchor rods (134) to stress the tensioning tendon (130) to a desired load.

### Claim 16 (depends on 15)

The method of claim 15,
wherein the step of releasably securing the end of the hoisting cable (197) remote from the winch (199) to the second end (138) of the tensioning tendon (130) is accomplished by releasably securing the bearing plate (170) to the bearing plate platform (154); and
wherein the step of connecting the second end (138) of the tensioning tendon (130) to the pair of upper anchor rods (140) is accomplished by connecting the bearing plate (170) to the pair of upper anchor rods (140).

### Claim 17 (depends on 16)

The method of claim 16, further comprising:
providing the carriage assembly (150) with a deflecting surface (158) that will impinge on the bearing plate (170) to deflect the carriage assembly (150) away from the bearing plate (170) when the bearing plate (170) is affixed to the pair of upper anchor rods (140) and the carriage assembly (150) is lowered.

### Claim 18 (depends on 15)

The method of claim 15,
wherein the bearing plate (170) comprises a first aperture (169) and a second aperture (170) formed there through, the first and second apertures (169, 170) positioned within the bearing plate (170) to receive respective ones (139, 141) of the pair of upper anchor rods (140);
the method further comprising:
attaching the sheave assembly (180) to the pair of upper anchor rods (140) so that the pulley (198) positions the hoisting cable (197) on a substantially direct centerline between the pair of upper anchor rods (140);
adjusting a distance between a first anchor rod and a second anchor rod of the pair of upper anchor rods using the sheave assembly to ensure substantial alignment with the first and second apertures; and
activating the winch (199) to wind the hoisting cable (197) so the first and second apertures (169, 170) are in the substantial alignment with the respective ones (139, 141) of the pair of upper anchor rods (140).