Reactive power control in power systems
AssigneeTelefonaktiebolaget LM Ericsson (publ)
InventorsLackis Eleftheriadis, Athanasios Karapantelakis, Konstantinos Vandikas
Life of this patent
Estimating the term…
Loading patent…
AssigneeTelefonaktiebolaget LM Ericsson (publ)
InventorsLackis Eleftheriadis, Athanasios Karapantelakis, Konstantinos Vandikas
Estimating the term…
Based on information from a controller scheduling data traffic in a processing arrangement, a super capacitor unit is activated, whereby reactive power is fed to a system bus of said power system. The controller is configured to have information at time t(n) about the data traffic workload of the processing arrangement at time t(n+1). By triggering discharge of the super capacitor unit based on super capacitor data at time t(n+1), transients on a system bus voltage are, at least in part, smoothed out at time t(n+1), which reduces the need for reactive power of the power system, where said transients are related to the data traffic workload of the processing arrangement. The power efficiency of the power system can be improved by 3-4% by the reduction of the need for reactive power from a power grid, for which reason the electrical bill of an operator is reduced.
A method of controlling reactive power of a power system, the power system comprising a power supply unit, PSU, with a power input connected to a power grid, the PSU having a power output connected to a power input of a power distribution unit, PDU, that distributes power to a processing arrangement, whereby the power system serves the processing arrangement with power via the PDU, the processing arrangement having a data traffic workload, the power system further comprising a super capacitor unit being connected to the power output of the PSU, the method being performed by a controller connected to the processing arrangement, the PDU and the super capacitor unit, the controller being configured to schedule the data traffic workload of the processing arrangement, whereby the controller is configured to have information at time t(n) about the data traffic workload of the processing arrangement at a subsequent time t(n+1), where the time t(n+1) is one time interval from, and next to, the time t(n), the method comprising:
A controller operative to control reactive power of a power system, the power system comprising a power supply unit, PSU, with a power input connected to a power grid, the PSU having a power output connected to a power input of a power distribution unit, PDU, that distributes power to a processing arrangement, whereby the power system serves the processing arrangement with power via the PDU, the processing arrangement having a data traffic workload, the power system further comprising a super capacitor unit being connected to the power output of the PSU, the controller being adapted to be connected to the processing arrangement, the PDU and the super capacitor unit, the controller is configured to schedule the data traffic workload of the processing arrangement, whereby the controller is configured to have information at time t(n) about the data traffic workload of the processing arrangement at a subsequent time t(n+1), where the time t(n+1) is one time interval from, and next to, the time t(n), the controller further comprising:
A non-transitory computer-readable storage medium comprising a computer program product including instructions to cause at least one processor of a controller operative to control reactive power of a power system, the power system comprising a power supply unit, PSU, with a power input connected to a power grid, the PSU having a power output connected to a power input of a power distribution unit, PDU, that distributes power to a processing arrangement, whereby the power system serves the processing arrangement with power via the PDU, the processing arrangement having a data traffic workload, the power system further comprising a super capacitor unit being connected to the power output of the PSU, the controller being adapted to be connected to the processing arrangement, the PDU and the super capacitor unit, the controller is configured to schedule the data traffic workload of the processing arrangement, whereby the controller is configured to have information at time t(n) about the data traffic workload of the processing arrangement at a subsequent time t(n+1), where the time t(n+1) is one time interval from, and next to, the time t(n), to:
Dependencies are inferred from the claim text.