Methods and apparatus for switching between bandwidth parts
AssigneeHuawei Technologies Co., Ltd.
InventorsJavad Abdoli, Zhenfei Tang
Life of this patent
Estimating the term…
Abstract
A user equipment (UE) receives control signaling in a scheduling bandwidth part (BWP). The control signaling indicates switching from a first active BWP to a second active BWP or switching from a first active BWP pair to a second active BWP pair for the UE. The control signaling aligns with a time unit boundary, such as a slot boundary, that is associated with the scheduling BWP. In the event that a scheduled BWP for a UE has a different numerology than a scheduling BWP that is currently active for the UE, the UE could switch from the scheduling BWP to the scheduled BWP based on a control signaling monitoring periodicity of the scheduled BWP.
Claims28
A method comprising:
- receiving, by an apparatus, control signaling in a scheduling slot of a scheduling bandwidth part (BWP), wherein the control signaling indicates switching from a first active BWP to a second active BWP or switching from a first active BWP pair to a second active BWP pair for the apparatus,
- wherein the control signaling aligns with a time unit boundary associated with the scheduling BWP,
- wherein the control signaling indicates a plurality of slots scheduled for data transmission or reception in the second active BWP or the second active BWP pair,
- wherein the control signaling indicates an earliest slot in the plurality of slots using a non-negative integer K0, and
- wherein K0=0 corresponds to a slot of the second active BWP or the second active BWP pair which includes a control signaling monitoring occasion based on a control signaling monitoring periodicity of the second active BWP or the second active BWP pair and is on or after a boundary of the scheduling slot plus a transition time from the first active BWP to the second active BWP or from the first active BWP pair to the second active BWP pair.
An apparatus comprising:
- a processor;
- and
- a non-transitory processor-readable storage medium storing instructions for execution by the processor, the instructions causing the processor to perform a method comprising:
- receiving control signaling in a scheduling slot of a scheduling bandwidth part (BWP), wherein the control signaling indicates switching from a first active BWP to a second active BWP or switching from a first active BWP pair to a second active BWP pair for the apparatus,
- wherein the control signaling aligns with a time unit boundary associated with the scheduling BWP,
- wherein the control signaling indicates a plurality of slots scheduled for data transmission or reception in the second active BWP or the second active BWP pair,
- wherein the control signaling indicates an earliest slot in the plurality of slots using a non-negative integer K0, and wherein K0=0 corresponds to a slot of the second active BWP or the second active BWP pair which includes a control signaling monitoring occasion based on a control signaling monitoring periodicity of the second active BWP or the second active BWP pair and is on or after a boundary of the scheduling slot plus a transition time from the first active BWP to the second active BWP or from the first active BWP pair to the second active BWP pair.
A method comprising:
- transmitting, by a network equipment, control signaling to a user equipment (UE) in a scheduling slot of a scheduling bandwidth part (BWP), wherein the control signaling indicates switching from a first active BWP to a second active BWP or switching from a first active BWP pair to a second active BWP pair for the UE,
- wherein the control signaling aligns with a time unit boundary associated with the scheduling BWP,
- wherein the control signaling indicates a plurality of slots scheduled for data transmission or reception in the second active BWP or the second active BWP pair,
- wherein the control signaling indicates an earliest slot in the plurality of slots using a non-negative integer K0, and
- wherein K0=0 corresponds to a slot of the second active BWP or the second active BWP pair which includes a control signaling monitoring occasion based on a control signaling monitoring periodicity of the second active BWP or the second active BWP pair and is on or after a boundary of the scheduling slot plus a transition time from the first active BWP to the second active BWP or from the first active BWP pair to the second active BWP pair.
A network equipment comprising:
- a processor;
- and
- a non-transitory processor-readable storage medium storing instructions for execution by the processor, the instructions causing the processor to perform a method comprising:
- transmitting control signaling to a user equipment (UE) in a scheduling slot of a scheduling bandwidth part (BWP), wherein the control signaling indicates switching from a first active BWP to a second active BWP or switching from a first active BWP pair to a second active BWP pair for the UE,
- wherein the control signaling aligns with a time unit boundary associated with the scheduling BWP,
- wherein the control signaling indicates a plurality of slots scheduled for data transmission or reception in the second active BWP or the second active BWP pair,
- wherein the control signaling indicates an earliest slot in the plurality of slots using a non-negative integer K0, and
- wherein K0=0 corresponds to a slot of the second active BWP or the second active BWP pair which includes a control signaling monitoring occasion based on a control signaling monitoring periodicity of the second active BWP or the second active BWP pair and is on or after a boundary of the scheduling slot plus a transition time from the first active BWP to the second active BWP or from the first active BWP pair to the second active BWP pair.
Dependencies are inferred from the claim text.