Detection of plunger movement in DC solenoids through current sense technique
AssigneeTexas Instruments Incorporated
InventorsNavaneeth Kumar Narayanasamy, Manu Balakrishnan
Life of this patent
Estimating the term…
Abstract
An apparatus and method of detecting movement of a plunger of the solenoid includes detecting a peak (IPEAK) in a current signal applied to a coil of the solenoid. A predetermined threshold is added to the current signal applied to the coil of the solenoid to generate a level shifted signal. The level shifted signal and the peak signal are compared to detect movement of a plunger of the solenoid.
Claims18
A method of detecting movement of a plunger of a solenoid comprising:
- detecting a peak (IPEAK) in a current signal applied to a coil of the solenoid;
- detecting a valley in the current signal applied to the coil of the solenoid to generate a valley signal (IVALLEY);
- adding a predetermined threshold to the current signal applied to the coil of the solenoid to generate a level shifted signal;
- comparing the level shifted signal and the peak signal to detect movement of a plunger of the solenoid;
- wherein if the current signal drops below the predetermined threshold, the plunger has moved.
In a system for operating a solenoid, a circuit to detect complete movement of a plunger of a solenoid, comprising:
- a device for measuring current through the solenoid and generating a first current signal;
- an active peak detector circuit receiving the first current signal for detecting a peak thereof and generating a peak detection signal;
- a level shifter circuit coupled in parallel with the active peak detector and receiving the first current signal, the level shifter circuit adding a threshold voltage to the first current signal to generate a level shifted signal;
- and
- a comparator comparing the peak detection signal with the level shifted signal, whereby if the level shifted signal matches the peak detection signal, complete movement of the solenoid is detected.
A control circuit for operating a solenoid comprising:
- a circuit for applying a voltage across a solenoid coil and measuring current through the coil to generate a first signal;
- a detector circuit detecting a peak in the current through the coil represented by the first signal;
- a circuit for detecting a valley in the first signal;
- an adder circuit for adding a predetermined threshold to the first signal;
- a comparator comparing output of the adder circuit to the peak signal to detect movement of the plunger of the solenoid.
Dependencies are inferred from the claim text.