Optimising fire protection for an offshore platform
AssigneeEquinor Energy AS
InventorsDagfinn Krøger, Bjarne Alexander Solberg
Life of this patent
Estimating the term…
Loading patent…
AssigneeEquinor Energy AS
InventorsDagfinn Krøger, Bjarne Alexander Solberg
Estimating the term…
An offshore oil and gas platform has equipment and piping associated with an oil and gas installation. A method for optimising fire protection for the platform includes arranging the platform to have an evacuation time of at most 15 minutes or less using one or more evacuation route(s) via a gangway or bridge allowing personnel to escape to a vessel or to another platform, determining a maximum evacuation time for the platform, assessing the risk to personnel using the evacuation route(s) in accordance with the determined maximum evacuation time in the event of a fire, and providing passive fire protection to equipment and/or piping on the platform in order to prevent escalation of the fire that would create a risk to personnel on the evacuation route(s) during the determined evacuation time.
A method for optimising fire protection for an offshore oil and gas platform, the platform having equipment and piping associated with an oil and gas installation, the method comprising:
A method for optimising fire protection for an offshore oil and gas platform, the platform having equipment and piping associated with an oil and gas installation, the method comprising:
A method for optimising fire protection for an offshore oil and gas platform, the platform having equipment and piping associated with an oil and gas installation, the method comprising:
Dependencies are inferred from the claim text.