- Number: US 10,870,999 B1
- Document ID: US10870999B1
- Status: Granted
- Kind: B1
- Application number: 16/662,716
- Filed: 2019-10-24
- Granted: 2020-12-22
- Earliest claimed: 2018-10-30
- Assignees: EXO Group LLC
- Applicants: Exo Group LLC
- Inventors: Wesley J Oliphant; Zachary James Oliphant; Garett William Oliphant
- Web page: https://patentgrep.com/patent/US10870999B1

## CPC

- E04G 23/0225: {of circular building elements, e.g. by circular bracing}
- E04G: SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS

## Abstract

A method for making a field repair on a hollow pole includes installing a sleeve spaced outwardly from the hollow pole and extending from an elevation above the top elevation of the damaged portion down to the concrete foundation, filling the interior of the pole and the space between the pole and the sleeve with concrete from the foundation to an elevation above the top elevation of the damaged portion, which effectively extends the anchorline of the structure upwardly to encompass the damaged area of the structure.

## Claims

### Claim 1

A method for repairing a hollow pole embedded in a concrete foundation, said hollow pole having a pole wall defining an interior and an exterior and having a damaged area extending downwardly from a top elevation to a bottom elevation, comprising the steps of:
installing laterally-extending reinforcing rods through the pole wall at a plurality of elevations and at a plurality of radial positions from above the top elevation to below the bottom elevation of the damaged area;
installing a sleeve spaced outwardly from said laterally-extending reinforcing rods and extending from above said top elevation to said concrete foundation;
pouring concrete into the interior of the hollow pole to fill the interior of the hollow pole to an elevation above the top elevation of the damaged area; and
pouring concrete to fill the space between said sleeve and said pole wall from said concrete foundation to above said top elevation.

### Claim 2 (depends on 1)

A method for repairing a hollow pole embedded in a concrete foundation as recited in claim 1, and further comprising the step of securing a plurality of upright reinforcing rods to said laterally-extending reinforcing rods and forming a cage between said pole wall and said sleeve before pouring concrete to fill the space between said sleeve and said pole wall.

### Claim 3 (depends on 2)

A method for repairing a hollow pole embedded in a concrete foundation as recited in claim 2, and further comprising the step of securing said laterally-extending reinforcing rods to said pole wall by threading said laterally-extending reinforcing rods through respective nuts secured to said pole wall.

### Claim 4 (depends on 3)

A method for repairing a hollow pole embedded in a concrete foundation as recited in claim 3, wherein said laterally-extending reinforcing rods have an enlarged head at their outer end.

### Claim 5 (depends on 4)

A method for repairing a hollow pole embedded in a concrete foundation as recited in claim 4, and further comprising the step of installing a fitting through a first hole in said pole wall above said top elevation, and using said fitting to pour concrete into the interior of said pole.

### Claim 6 (depends on 5)

A method for repairing a hollow pole embedded in a concrete foundation as recited in claim 5, and further comprising the step of, when filling the interior of said hollow pole with concrete, waiting until the concrete begins to flow out of a second hole in said pole wall above said top elevation to ensure that concrete has filled the interior of said pole up to the elevation of said second hole, and then stopping the concrete flow into the interior of the pole.