# US 10,865,911 B2 · Method of installing an in-line structure in a pipeline

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 10,865,911 B2
- Document ID: US10865911B2
- Status: Granted
- Kind: B2
- Application number: 16/333,656
- Filed: 2017-09-12
- Published: 2019-08-22
- Granted: 2020-12-15
- Earliest claimed: 2016-09-16
- Assignees: Technip France
- Applicants: Technip France
- Inventors: Martin Chalmers; Tomasz Tkaczyk
- Web page: https://patentgrep.com/patent/US10865911B2

## CPC

- F16L 1/207: {Pipe handling apparatus}
- F16L 1/12: Laying or reclaiming pipes on or under water
- F16L 1/16: on the bottom
- F16L 2101/20: Expelling gases or fluids
- Y10T 137/6123: With aperture forming means
- F16L: PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- Y10T: TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION

## Abstract

A method of installing an In-Line Structure (ILS) to a fluid-filled pipeline extending from a reel, over an aligner, and through a lay-tower during offshore reeling, the pipeline having an oblique part from the reel to the aligner, and a vertical part from the aligner through the lay-tower, including at least the steps of: (a) draining fluid in the fluid-filled pipeline from the vertical part of the pipeline to create a drained portion of the vertical part of the pipeline up to and around the aligner; (b) cutting the pipeline at or near the draining of step (a) to create upper and lower open ends of the pipeline; (c) installing the In-Line Structure to at least the upper open end of the pipeline; (d) locating a vent hose through a vent port in the In-Line Structure; (e) adding fluid into the drained portion of the pipeline and venting air from the drained portion of the pipeline through the vent hose to wholly or substantially fill the drained portion of the pipeline with the fluid.

## Claims

### Claim 1

A method of installing an In-Line Structure (ILS) to a fluid-filled pipeline extending from a reel, over an aligner, and through a lay-tower during offshore reeling, the pipeline having an oblique part from the reel to the aligner, and a vertical part from the aligner through the lay-tower, comprising at least the steps of:
(a) draining fluid in the fluid-filled pipeline from the vertical part of the pipeline to create a drained portion of the vertical part of the pipeline up to and around the aligner;
(b) cutting the pipeline at or near the draining of step (a) to create upper and lower open ends of the pipeline;
(c) installing the In-Line Structure to at least the upper open end of the pipeline;
(d) locating a vent hose through a vent port in the In-Line Structure;
(e) adding fluid into the drained portion of the pipeline and venting air from the drained portion of the pipeline through the vent hose to wholly or substantially fill the drained portion of the pipeline with the fluid.

### Claim 2 (depends on 1)

The method as claimed in claim 1, comprising installing the In-Line Structure (ILS) between the upper and the lower open ends of the pipeline.

### Claim 3 (depends on 1)

The method as claimed in claim 1, further comprising the step of installing a second In-Line Structure (ILS) to the lower open end of the pipeline.

### Claim 4 (depends on 1)

The method as claimed in claim 1, wherein the fluid in the fluid-filled pipeline is pressurised, and further comprising the step of relieving the pressure of the fluid prior to step (a).

### Claim 5 (depends on 1)

The method as claimed in claim 1, wherein the fluid in the fluid-filled pipeline is pressurized after step (e).

### Claim 6 (depends on 1)

The method as claimed in claim 1, further comprising forming a hole in the vertical part of the pipeline to allow the draining of the fluid from the vertical part of the pipeline.

### Claim 7 (depends on 1)

The method as claimed in claim 1, further comprising wholly or substantially removing the vent hose from the pipeline after step (e) and sealing the vent port in the In-Line Structure.

### Claim 8 (depends on 1)

The method as claimed in claim 1, further comprising adding the fluid in step (e) into the In-Line Structure.

### Claim 9 (depends on 1)

The method as claimed in claim 1, further comprising adding the fluid in step (e) into the fluid-filled oblique part of the pipeline.

### Claim 10 (depends on 1)

The method as claimed in claim 1, further comprising moving the oblique part of the pipeline between step (b) and step (c).

### Claim 11 (depends on 1)

The method as claimed in claim 1, further comprising cutting the pipeline to remove a portion of the pipeline greater than the length of the In-Line Structure.
