# US 10,865,078 B1 · Lifting assembly for elevating components to a wind turbine and a method for using the lifting assembly

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 10,865,078 B1
- Document ID: US10865078B1
- Status: Granted
- Kind: B1
- Application number: 16/627,893
- Filed: 2018-06-28
- Published: 2020-11-26
- Granted: 2020-12-15
- Earliest claimed: 2017-07-27
- Assignees: S&LAccess Systems AB
- Applicants: S&L Access Systems AB
- Inventors: Michael Strandberg; Kenneth Lundberg
- Web page: https://patentgrep.com/patent/US10865078B1

## CPC

- B66C 23/185: {for use erecting wind turbines (B66C23/207 takes precedence)}
- B66C 23/207: {with supporting couples provided by wind turbines}
- F03D 13/10: Assembly of wind motors; Arrangements for erecting wind motors
- F05B 2230/61: using auxiliary equipment for lifting or holding
- Y02E 10/72: Wind turbines with rotation axis in wind direction
- B66C: CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES ({specially adapted for lifting invalids A61G7/10;} rope, cable, or chain winding mechanisms, braking or detent devices therefor B66D; specially adapted for nuclear reactors G21)
- F03D: WIND MOTORS
- F05B: INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

A lifting assembly for elevating components to a wind turbine. The lifting assembly comprises a plurality of tower segments adapted to be arranged on top of each other to form an elongated tower, and a lifting device including a support frame for supporting the tower, a securing assembly for securing the tower to the wind turbine, and a crane having a base part and a jib rotatably connected to the base part. The lifting device comprises a platform arranged vertically moveable between a lower and an upper position. The platform has a first storage area for supporting components with a weight of more than 10 tons. The crane is mounted on the platform and is configured to move the components between the platform and the wind turbine when the platform is in the upper position. The platform is provided with an opening adapted to receive the tower segments. The crane and the first storage area are arranged on opposite sides of the opening, and one of the tower segments is a top segment having an upper part provided with a second storage area for supporting components with a weight of more than 10 tons. The invention also relates to a method for using the lifting assembly for replacing an old component of a wind turbine with a new component.

## Claims

### Claim 1

A lifting assembly for elevating components to a wind turbine, comprising:
a plurality of tower segments which together form an elongated tower with an adjustable height, and
a lifting device including:
a support frame for supporting the tower,
a securing assembly for securing the tower to the wind turbine, and
a crane, wherein the lifting device comprises:
a platform arranged moveable relative the support frame between a lower position and an upper position, and the platform has a first storage area for supporting components weighing more than 10 tons, the crane is mounted on the platform and is configured to move the components between the platform and the wind turbine when the platform is in the upper position, the platform is provided with an opening adapted to receive the tower segments, the crane and the first storage area are arranged on opposite sides of the opening and one of the tower segments is a top segment, having an upper part provided with a second storage area for supporting components weighing more than 10 tons.

### Claim 2 (depends on 1)

The lifting assembly according to claim 1, wherein said top segment comprises a cap connected to said upper part and having an upper surface defining said second storage area.

### Claim 3 (depends on 2)

The lifting assembly according to claim 2, wherein said cap is removably connected to the upper part.

### Claim 4 (depends on 2)

The lifting assembly according to claim 2, wherein said opening, and the peripheries of the tower segments and the cap are rectangular.

### Claim 5 (depends on 1)

The lifting assembly according to claim 1, wherein the lifting device comprises a drive unit for moving the platform and a power generation device configured to generate electric power to said drive unit, and the power generation device is mounted on said platform.

### Claim 6 (depends on 1)

The lifting assembly according to claim 1, wherein said platform has a length of at least 4 m and a width of at least 2 m, and preferably said platform has a length of at least 6 m and a width of at least 3 m.

### Claim 7 (depends on 1)

The lifting assembly according to claim 1, wherein said crane has a base part and a jib rotatably connected to the base part, and the jib has a maximum length of less than 40 m, and preferably the jib has a maximum length of less than 30 m.

### Claim 8

The lifting assembly according to claim wherein the weight of the crane is more than 10 tons.

### Claim 9 (depends on 1)

The lifting assembly according to claim 1, wherein the weight of the crane is less than 40 tons, and preferably less than 30 tons.

### Claim 10 (depends on 1)

The lifting assembly according to claim 1, wherein the platform is provided with extendable beams, for supporting a wind turbine roof.

### Claim 11 (depends on 1)

The lifting assembly according to claim 1, wherein the area of each of the first and second storage areas is at least 4 m2.

### Claim 12 (depends on 1)

A method for using the lifting assembly as defined in claim 1 for replacing an old component of a wind turbine with a new component, wherein the method comprises:
a) positioning the lifting device on the ground and in close proximity to the wind turbine,
b) lifting the new component by means of the crane and placing the new component on the first storage area of the platform,
c) moving one of the tower segments to the support frame in a vertical orientation through the opening of the platform by means of the crane,
d) connecting the tower segment to the support frame,
e) vertically moving the platform to an upper end of the tower segment,
f) lifting another of the tower segments, placing the tower segment in a vertical orientation on the previous tower segment by means of the crane, and mechanically connecting the tower segments to each other,
g) repeating the steps e-f to build the elongated tower,
h) lifting the top segment and placing the top segment in a vertical orientation on the previous tower segment by means of the crane, and mechanically connecting the top segment to the previous tower segment,
i) connecting the top segment to the wind turbine by means of the securing assembly,
j) vertically moving the platform to the upper part of the tower segment,
k) mechanically securing the platform to the top segment,
l) moving the old component from the wind turbine and placing it on the second storage area by means of the crane,
m) moving the new component from the platform and placing it on the wind turbine by means of the crane,
n) moving the old component from the second storage area to the first storage area by means of the crane,
o) removing the mechanical securing of the platform to the top segment,
p) vertically moving the platform from the tower segment downwards to the previous tower segment,
q) disconnecting the tower segments from each other,
r) moving the tower segment to the ground by means of the crane,
s) repeating the steps p-r until the platform has been moved to the last tower segment,
t) moving the platform to the support frame,
u) disconnecting the last tower segment from the support frame, and
v) moving the last tower segment to the ground by means of the crane.

### Claim 13 (depends on 12)

The method according to claim 12, wherein said component is any of a gear box, a generator, and a wind turbine wing.

### Claim 14 (depends on 12)

The method according to claim 12 for using the lifting assembly, wherein the method further comprises starting the power generation devices before step b.

### Claim 15 (depends on 12)

The method according to claim 12 for using the lifting assembly, wherein the method further comprises the following steps:
removing the roof of the wind turbine and placing it on the extendable beams on the platform before performing step l, and
lifting the roof back onto the wind turbine before step o.