Production planning system and method
AssigneeTRUMPF Werkzeugmaschinen GmbH + Co. KG
InventorStephan Fischer
Life of this patent
Estimating the term…
Loading patent…
AssigneeTRUMPF Werkzeugmaschinen GmbH + Co. KG
InventorStephan Fischer
Estimating the term…
The invention relates to production planning systems and methods. A production optimization system is provided which has the following: a production environment with at least one first machine, a second machine, a distribution unit configured to be connected to the first machine and the second machine via a communication network and to ascertain the machine state thereof, and an optimization unit configured to generate a production plan where at least one task for producing a product is separated into machine-specific sub-tasks for the first machine or the second machine, said sub-tasks being provided with a sequence for the first machine or the second machine. The distribution unit ascertains the next occurring sub-task for the first machine or the second machine from the optimization unit while taking into consideration the respective machine state, to remove the sub-task from the production plan, and to assign the sub-task to the respective machine.
A production optimization system comprising:
An optimization process carried out by an optimization unit, the optimization process comprising the steps:
A distribution method carried out according to a distribution unit and an optimization unit, comprising the steps:
Dependencies are inferred from the claim text.