Disaster recovery switchover method and system, and node
AssigneeHuawei Technologies Co., Ltd.
InventorsSinan Wang, Guogen Zhang, Chaoli Qin
Life of this patent
Estimating the term…
Loading patent…
AssigneeHuawei Technologies Co., Ltd.
InventorsSinan Wang, Guogen Zhang, Chaoli Qin
Estimating the term…
A disaster recovery switchover system, the disaster recovery switchover system includes a production node, a redundancy node, and a recording node, the production node currently runs a first production service, and the method includes: receiving, by the recording node, first restoration information sent by the production node, where the first restoration information is information required for restoring the first production service to a latest running status of the first production service; and sending, by the recording node when determining that the first production service needs to be restored on the redundancy node, second restoration information to the redundancy node, where the second restoration information is information that is obtained according to the first restoration information and that is required to restore the first production service on the redundancy node, so that the redundancy node switches the first production service to the redundancy node according to the second restoration information.
A disaster recovery switchover method, comprising:
A disaster recovery switchover method, comprising:
A recording node associated with a disaster recovery switchover system, comprising:
Dependencies are inferred from the claim text.