Wet well prediction using real time data
AssigneeSaudi Arabian Oil Company
InventorsMuhammad Shehryar Khakwani, Abbas Wasel Albeshri, Abdullah Hamed Bar
Life of this patent
Estimating the term…
Loading patent…
AssigneeSaudi Arabian Oil Company
InventorsMuhammad Shehryar Khakwani, Abbas Wasel Albeshri, Abdullah Hamed Bar
Estimating the term…
Embodiments of systems and methods for predicting when a dry oil producing well is expected to transition to a wet oil producing well, the system configured to generate predictions from multiple databases of information. A first database is designed to store real time data about an active producing well and a second database can be a historical production information database, such as an Online Transactions Processing (OLTP) database. The data from both databases can be normalized, compared, and correlated to create a predictive model that accurately predicts when a particular well is expected to transition from a dry oil producing well to a wet oil producing well. The system and method can be configured to use many different techniques including an autoregressive integrated moving average equation to create a predictive model based off the normalized data from the multiple databases.
A method for predicting when a dry oil producing well is expected to transition to a wet oil producing well, the method comprising:
A system for predicting when a dry oil producing well is expected to transition to a wet oil producing well, the system comprising:
Dependencies are inferred from the claim text.