Central plant control system with automatic optimization formulation
AssigneeJohnson Controls Technology Company
InventorAndrew J. Przybylski
Life of this patent
Estimating the term…
Loading patent…
AssigneeJohnson Controls Technology Company
InventorAndrew J. Przybylski
Estimating the term…
A central plant control system configured to serve one or more energy loads in a building comprises equipment configured to consume, produce, or store one or more resources including electricity, water, natural gas, steam, hot thermal energy, cold thermal energy, or electrical energy. The central plant control system further comprises an asset allocator configured to receive an input model that describes a physical layout of the equipment of the central plant and create a net list that defines connections between the equipment of the central plant using the input model. The asset allocator is further configured to discover one or more systems of interconnected equipment and one or more groups of equipment using the net list, formulate an optimization problem for the central plant using the systems and groups of equipment, and operate the equipment of the central plant according to the optimization problem.
A method for operating equipment in a central plant, the method comprising:
A central plant control system configured to serve one or more energy loads in a building, the central plant control system comprising:
A central plant configured to serve one or more energy loads in a building, the central plant comprising:
Dependencies are inferred from the claim text.