Schedule management system
AssigneeShibuya Corporation
InventorsShiaru Muranaka, Kenji Yoneda, Hiroshi Utsumi
Life of this patent
Estimating the term…
Loading patent…
AssigneeShibuya Corporation
InventorsShiaru Muranaka, Kenji Yoneda, Hiroshi Utsumi
Estimating the term…
A schedule management system 1 having isolators 3 (production facilities) and a main control device 4 for managing a production schedules of all the isolators 3. The production process of each isolator constituting the production schedule has a plurality of sub-processes, the production status being determined in the sub-process. The main control device 4 adds a new separating operation to the passage process and performs an update when the main control device 4 obtains a determination result that the separation of cells in a separation state confirmation operation (sub-process) in the passage process is insufficient while a passage process for cells A is being carried out in the isolators. The main control device 4 alters the start time of a culture medium exchange process for other cells B different from the updated passage operation, and updates the production schedule.
A schedule management system comprising a plurality of production facilities for producing cell culture products on the basis of a plurality of production processes for producing the cell culture products and a main control device configured to manage the plurality of production processes and manage a cell culture product production schedule made of the plurality of production processes, wherein
Dependencies are inferred from the claim text.