Controlling timing of dedicated-bearer setup based on base station load
AssigneeSprint Spectrum L.P.
InventorsSathyanarayanan Raghunathan, Muthukumaraswamy Sekar, Maheswaran Vijayakumar, Suresh Majjara
Life of this patent
Estimating the term…
Loading patent…
AssigneeSprint Spectrum L.P.
InventorsSathyanarayanan Raghunathan, Muthukumaraswamy Sekar, Maheswaran Vijayakumar, Suresh Majjara
Estimating the term…
In a wireless communication system where a wireless access network includes a base station providing coverage in which to serve devices and where the wireless access network provides connectivity with an Internet Multimedia Subsystem (IMS), a method and system to help manage network resources by dynamically controlling when setup of a dedicated bearer will be invoked for a packet-based call placed by a device served by the base station. If the base station is lightly loaded, then setup of dedicated bearer could be invoked before the called party answers the call. Whereas, if the base station is heavily loaded, then setup of the dedicated bearer could be invoked if and when the called party has answered.
A method for resource management in a wireless access network, wherein the wireless access network includes a base station that provides coverage in which to serve user equipment devices (UEs) and the wireless access network provides connectivity with an Internet Multimedia Subsystem (IMS), the method comprising:
A method for resource management in a wireless communication system, wherein the wireless communication system comprises a base station and a gateway system, the base station providing coverage in which to serve user equipment devices (UEs) and having an interface with the gateway system, and the gateway system providing for communication with an Internet Multimedia Subsystem (IMS), the method comprising:
A wireless access network comprising a base station, a gateway system, and a control system, wherein the base station provides coverage in which to serve user equipment devices (UEs), wherein the gateway system provides connectivity with an Internet Multimedia Subsystem (IMS), and wherein the control system controls setup of dedicated bearers within the wireless access network to carry bearer data of communication sessions,
Dependencies are inferred from the claim text.