Multi-tool scheduling for cooperative manufacturing
AssigneeAutodesk, Inc.
InventorGregory David Meess
Life of this patent
Estimating the term…
Loading patent…
AssigneeAutodesk, Inc.
InventorGregory David Meess
Estimating the term…
Methods, systems, and apparatus, including medium-encoded computer program products, for synchronizing the manufacture of objects using two or more separate tools include, in at least one aspect, determining tasks to be performed in a shared build volume to manufacture a 3D object, assigning the tasks to respective queues, ordering the tasks within each queue of assigned tasks based on a spatial dimension extent, generating wait times within the queues in accordance with timing dependencies, identifying which of the queues of assigned tasks takes a most amount of time in accordance with temporal dimension extents and the wait times, creating at least one variant of the queues of assigned tasks, repeating the ordering, the adding, and the identifying to reduce a total time of manufacturing, and providing a finalized version of the queues of assigned tasks for conducting synchronized activities of manufacturing in the shared build volume.
A computer-implemented method, comprising:
A non-transitory computer-readable medium encoding instructions programmed to cause one or more hardware processors of one or more computing devices to perform operations comprising:
A system comprising:
Dependencies are inferred from the claim text.