Controlling hydrocarbon production
AssigneeSaudi Arabian Oil Company
InventorsHuseyin Onur Balan, Anuj Gupta, Daniel T. Georgi, Ali Alkhatib, Alberto F. Marsala
Life of this patent
Estimating the term…
Loading patent…
AssigneeSaudi Arabian Oil Company
InventorsHuseyin Onur Balan, Anuj Gupta, Daniel T. Georgi, Ali Alkhatib, Alberto F. Marsala
Estimating the term…
Techniques for controlling hydrocarbon production includes (i) identifying a plurality of reservoir measurements of a subterranean hydrocarbon reservoir located between at least one injection wellbore and at least one production wellbore; (ii) processing the identified plurality of reservoir measurements to generate a petrophysical model of the subterranean hydrocarbon reservoir; (iii) determining, based on the petrophysical model, a flow of an injectant from the injection wellbore toward the production wellbore; and (iv) adjusting an inflow control device (ICD) positioned about the production wellbore based on the determined flow of the injectant.
A computer program product encoded on a non-transitory storage medium, the product comprising non-transitory, computer readable instructions for causing one or more processors to perform operations comprising:
Dependencies are inferred from the claim text.