Back to results
US 10,650,392 B2Granted
Methods and systems for using multiple data sets to analyze performance metrics of targeted companies
AssigneeM Science LLC
InventorsAnthony Berkman, Seth Goldstein, Justin A. Jones
Life of this patent
Estimating the term…
Abstract
New and improved methods and systems for modeling the performance of selected company metrics. Multiple, non-traditional sets of objective data along with mathematical analytical techniques are used to provide transparency and visibility into company performance relating to the particular metrics. Company inflection points and changes in strategy may be identified. The performance of a company and/or the performance of a selected industry or industry sector may be analyzed.
Claims5
A data analysis system, comprising:
- a processor in electronic communication with a plurality of disparate, non-fundamental data sources, each of the data sources providing electronically accessible, measurable data that is different from any of the other ones of the plurality of disparate, non-fundamental data sources;
- and
- a database connected with said processor;
- said processor configured to:
- receive an input performance metric for a selected company;
- collect sets of data related to said performance metric from each of said plurality of disparate, non-fundamental data sources;
- validate said sets of data;
- discard invalid sets of data from said collected data sets;
- combine the non-discarded sets of data into a combined data set;
- store said combined data set in said database;
- select an analytical process to apply to the stored combined data set, said analytical process being selected from a group consisting of regression analysis, time series analysis, smoothing methods, spectral analysis, neural networks, artificial intelligence, and machine learning;
- apply the selected analytical process to the combined data set to create a model of the performance metric;
- validate the model of the performance metric against the actual performance of the selected company;
- and
- if model is not validated, correct said model.
12 more elements
Dependencies are inferred from the claim text.