Optimal wind farm operation
AssigneeABB Schweiz AG
InventorsCarsten Franke, Kedar Kulkarni, Adrian Timbus, Jan Poland, Silvia Mastellone, Yan Zhang
Life of this patent
Estimating the term…
Loading patent…
AssigneeABB Schweiz AG
InventorsCarsten Franke, Kedar Kulkarni, Adrian Timbus, Jan Poland, Silvia Mastellone, Yan Zhang
Estimating the term…
The present invention relates to a method of operating a wind farm comprising an upstream and a downstream turbine, wherein the upstream turbine is operated with current operation parameters under current wind conditions, wherein the method comprises the steps of: receiving future wind conditions for a time period for the wind farm, and evaluating required operation parameters for minimising wake effect of the downstream turbine under the future wind conditions, and determining a cost coefficient for changing the operation parameters to required operation parameters under consideration of fatigue effect of the wind turbine, calculating power productions P0 and Pc, in the predetermined time period, by the wind farm if operated with the current operation parameters under the current wind conditions and if operated with the required operation parameters under the future wind conditions, respectively, and operating the upstream turbine with the required operation parameters if the cost coefficient is lower than a cost that would be obtained by a power production increment Pc-P0.
A method of operating a wind farm with an upstream turbine and a downstream turbine, wherein the upstream turbine is operated with a current upstream operation parameter value under current wind conditions, the method comprising the steps of:
A controller for operating a wind farm comprising an upstream turbine and a downstream turbine, wherein the upstream turbine is operated with a yaw angle γ0 under current wind conditions, wherein the controller is configured to:
Dependencies are inferred from the claim text.