Process optimization method and system for a power plant
AssigneeABB Schweiz AG
InventorsMohan Kumar Shanmugam, Senthil Kumar Sundaram, Gopinath Selvaraj, Shrikant Bhat
Life of this patent
Estimating the term…
Loading patent…
AssigneeABB Schweiz AG
InventorsMohan Kumar Shanmugam, Senthil Kumar Sundaram, Gopinath Selvaraj, Shrikant Bhat
Estimating the term…
A method and system are disclosed for optimizing load scheduling for a power plant having one or more power generator units. An exemplary method and corresponding system can involve detecting an event indicative of a need for adapting one or more constraints for an objective function used in load scheduling. On such detection, the objective function is analysed to determine adaptive constraint values for the one or more constraints for optimally solving the objective function. These adaptive constraint values can be used to solve the objective function and the solution of the objective function with the one or more adapted constraint values can be used to operate the one or more power generation units of the power plant.
A method for operating one or more power generation units of a power plant with a control system that comprises an optimizer to obtain an optimal solution for optimizing load scheduling for the one or more power generation units by controlling process parameters of the power plant based on the optimal solution, the method comprising:
Dependencies are inferred from the claim text.