Electronic component supply system
AssigneeFuji Corporation
InventorsYukihiro Yamashita, Hiroaki Muratsuchi
Life of this patent
Estimating the term…
Abstract
Provided is an electronic component supply system determining the types of electronic components installed on component pallets at a time when the electronic components are installed on the component pallets for installation, which determines the types of the electronic components installed on the component pallets based on planned multiple jobs continuously performed by multiple electronic component mounting machines to which the component pallets are attached and an execution order for the jobs such that the number of the component pallets exchanged during job switching is minimized.
Claims3
An electronic component supply system determining types of electronic components installed on component pallets, comprising:
- control circuitry configured to determine the types of the electronic components installed on the component pallets based on planned multiple jobs continuously performed by multiple electronic component mounting machines to which the component pallets are attached and an execution order for the jobs such that the number of the component pallets exchanged during job switching is minimized,
- wherein the electronic component mounting machines are arranged in series and one of the component pallets is connected respectively to the electronic component mounting machines,
- wherein the control circuitry determines which of the component pallets connected to the component mounting machines is a pallet to be exchanged based on a number of jobs remaining of the multiple jobs after a component pallet exchange, and
- wherein the control circuitry determines the types of the electronic components on the pallet to be exchanged during the component pallet exchange after completion of a predetermined number of the multiple jobs is based on a number of components not used on pallets that remain after the component pallet exchange and on a number of components required by a remaining number of jobs of the planned multiple jobs.
Dependencies are inferred from the claim text.