Radio frequency beam management and failure pre-emption
AssigneeNational Instruments Corporation
InventorsNikhil U. Kundargi, Achim Nahler, James Wesley McCoy
Life of this patent
Estimating the term…
Loading patent…
AssigneeNational Instruments Corporation
InventorsNikhil U. Kundargi, Achim Nahler, James Wesley McCoy
Estimating the term…
A processor in a UE evaluates a radio frequency beam quality metric against a threshold, switches from a first beam to a second beam in response to determining the metric falls below the threshold, and transmits to a base station (BS) a report that includes beam measurements. The report indicates the UE has performed the switching and that the beam measurements are with respect to the second beam. A processor in a UE/BS associates narrower and broader beams, uses the narrower beam, rather than the broader beam, to transfer user data between the BS and the UE, evaluates a beam quality metric of the narrower beam against the threshold, and switches to using the broader beam, rather than the narrower beam, to transfer user data between the BS and the UE in response to determining the beam quality metric of the narrower beam falls below the threshold.
A user equipment (UE) for performing radio frequency beam management in communication with a base station, comprising:
A method for performing radio frequency beam management in communication between a base station and a user equipment (UE), the method comprising:
A base station (BS)/user equipment (UE) attempting to pre-empt radio frequency beam failure in communication between a UE/BS, comprising:
A method for attempting to pre-empt radio frequency beam failure in communication between a base station (BS) and a user equipment (UE), the method comprising:
Dependencies are inferred from the claim text.