Operating a highly available automation system
AssigneeSiemens Aktiengesellschaft
InventorsHans-Jürgen Arbogast, Thomas Grosch
Life of this patent
Estimating the term…
Loading patent…
AssigneeSiemens Aktiengesellschaft
InventorsHans-Jürgen Arbogast, Thomas Grosch
Estimating the term…
To achieve an automatic adjustment of a monitoring time in an automation system with a first automation device and a second automation device, at least one of the two automation devices operates a measuring program. A desired ring interruption is carried out by the measuring program by blocking a ring port in order thus to provoke a ring reconfiguration that utilizes a reconfiguration time. The blockage of the ring port is canceled again after the reconfiguration time has elapsed. The ring port is blocked again if the ring port has been opened by the ring reconfiguration, and all routing tables are deleted. As a result of this, at least the peripheral units are triggered to learn new network routes. Runtimes of test telegrams are measured, and a maximum value of the measured runtimes is stored. The measured maximum value is used for a dynamic adjustment of the monitoring time.
A method for operating a program-controlled highly available automation system configured redundantly with a first automation device and a second automation device, for a technical process, wherein one automation device of the first automation device and the second automation device preferentially controls the technical process via peripheral units, and the first automation device and the second automation device mutually monitor for failure of the respective other automation device of the first automation device and the second automation device, wherein a monitoring query from the first automation device to the second automation device, and vice versa, is to be responded to within a monitoring time, wherein for a communication, the first automation device and the second automation device, and the peripheral units are connected with one another via a ring, wherein the first automation device and the second automation device each have a first ring port and a second ring port in order to form the ring, wherein one ring port of the first ring ports and the second ring ports is operated as blocked so that circulating telegrams are prevented in the ring, wherein the first automation device and the second automation device, and the peripheral units also have routing tables, wherein a measuring program is operated in at least in one automation device of the first automation device and the second automation device, the method comprising:
Dependencies are inferred from the claim text.