Hybrid concrete-composite tower for a wind turbine and method of manufacturing
AssigneeUniversity of Maine System Board of Trustees
InventorsAnthony M. Viselli, Habib J. Dagher
Life of this patent
Estimating the term…
Abstract
A wind turbine tower includes a plurality of tower sections axially aligned and connected together. Each tower section includes an inner wall having a tapered cylindrical shape concentrically positioned within an outer wall having a tapered cylindrical shape. An annular space is defined between the inner wall and the outer wall, and a layer of concrete is disposed within the annular space. A plurality of post-tensioning cables extend longitudinally within the annular space or outside the outer wall, such that a first one of the tower sections is connected to a second one of the tower sections by a plurality of the post-tensioning cables.
Claims18
A wind turbine tower comprising:
- a plurality of tower sections axially aligned and connected together;
- each tower section including an inner wall having a tapered cylindrical shape concentrically positioned within an outer wall having a tapered cylindrical shape and defining an annular space between the inner wall and the outer wall, and a layer of concrete within the annular space;
- shear transfer members formed on one of a longitudinally extending inside surface of the outer wall and a longitudinally extending outside surface of the inner wall, wherein the shear transfer members are one of circumferentially extending ridges and circumferentially extending grooves;
- and
- a plurality of post-tensioning cables;
- wherein a third one of the tower sections includes an inner wall having a tapered cylindrical shape concentrically positioned within and attached to an outer wall having a tapered cylindrical shape and defining an annular space between the inner wall and the outer wall, the third one of the tower sections having no fill material within the annular space;
- wherein the post-tensioning cables extend longitudinally one of within the annular space and outside the outer wall, such that a first one of the tower sections is connected to a second one of the tower sections by a plurality of the post-tensioning cables;
- and
- wherein the third one of the tower sections is connected to the first and second ones of the tower sections by the plurality of the post-tensioning cables.
A method of forming a wind turbine tower, characterized in that:
- forming a foundation;
- forming a plurality of outer walls having a tapered cylindrical shape;
- forming a plurality of inner walls having a tapered cylindrical shape;
- joining each inner wall within one of the outer walls with a plurality of fasteners to define a plurality of shells such that an annular space is defined between the inner wall and the outer wall of each shell, each shell having a first end and a second end;
- mounting the first end of a first one of the shells on the foundation;
- disposing elongated tubes defining cable channels longitudinally within the annular space;
- introducing wet concrete into the annular space of the first one of the shells;
- after the concrete is cured, extending a plurality of post-tensioning cables through the elongated tubes and between the foundation and the second end of the first one of the shells and applying tension to the plurality of post-tensioning cables to connect the first one of the shells to the foundation;
- mounting the first end of a second one of the shells to the second end of the first one of the shells;
- disposing elongated tubes defining cable channels longitudinally within the annular space of the second one of the shells;
- introducing wet concrete into the annular space of the second one of the shells;
- after the concrete in the annular space of the second one of the shells is cured, extending a plurality of post-tensioning cables through the elongated tubes and between the foundation and the second end of the second one of the shells and applying tension to the plurality of post-tensioning cables to connect the second one of the shells to the first one of the shells and to the foundation;
- mounting the first end of a third one of the shells to the second end of the second one of the shells, the third one of the shells having no fill material within the annular space;
- disposing elongated tubes defining cable channels longitudinally within the annular space of the third one of the shells;
- and
- extending a plurality of post-tensioning cables between the foundation and the second end of the third one of the shells and applying tension to the plurality of post-tensioning cables to connect the third one of the shells to the first and second ones of the shells and to the foundation.
A method of assembling a wind turbine tower characterized in that:
- forming a foundation;
- forming a plurality of outer walls having a tapered cylindrical shape and further including shear transfer members formed on a longitudinally extending inside surface thereof;
- forming a plurality of inner walls having a tapered cylindrical shape and further including shear transfer members formed on a longitudinally extending outside surface thereof;
- wherein the shear transfer members are one of circumferentially extending ridges and circumferentially extending grooves;
- concentrically positioning and joining each inner wall within one of the outer walls to define a plurality of shells such that an annular space is defined between the inner wall and the outer wall of each shell, each shell having a first end and a second end;
- mounting the first end of a first one of the shells on the foundation;
- disposing elongated tubes defining cable channels longitudinally within the annular space;
- inserting temporary post-tensioning rods within the elongated tubes to temporarily secure the first one of the shells to the foundation;
- introducing wet concrete into the annular space of the first one of the shells;
- after the concrete is cured, extending a plurality of post-tensioning cables through the elongated tubes and between the foundation and the second end of the first one of the shells and applying tension to the plurality of post-tensioning cables to connect the first one of the shells to the foundation;
- mounting the first end of a second one of the shells to the second end of the first one of the shells;
- disposing the elongated tubes defining cable channels longitudinally within the annular space of the second one of the shells;
- inserting the temporary post-tensioning rods within the elongated tubes to temporarily secure the second one of the shells to the first one of the shells;
- introducing wet concrete into the annular space of the second one of the shells;
- after the concrete in the annular space of the second one of the shells is cured, extending a plurality of post-tensioning cables through the elongated tubes and between the foundation and the second end of the second one of the shells and applying tension to the plurality of post-tensioning cables to connect the second one of the shells to the first one of the shells and to the foundation;
- mounting the first end of a third one of the shells to the second end of the second one of the shells, the third one of the shells having no fill material within the annular space;
- disposing elongated tubes defining cable channels longitudinally within the annular space of the third one of the shells;
- and
- extending a plurality of post-tensioning cables between the foundation and the second end of the third one of the shells and applying tension to the plurality of post-tensioning cables to connect the third one of the shells to the first and second ones of the shells and to the foundation.
Dependencies are inferred from the claim text.