Predictive replacement for heavy machinery
AssigneeJoy Global Surface Mining Inc
InventorsDavid Restum, Wesley Taylor
Life of this patent
Estimating the term…
Loading patent…
AssigneeJoy Global Surface Mining Inc
InventorsDavid Restum, Wesley Taylor
Estimating the term…
Systems and methods for predicting replacement of a component of an industrial machine. One system includes an electronic processor configured to determine a wear rate of the component based on a current dimension of the component and historical dimensions of the component and determine a replacement cost for the component. Determining the replacement cost includes determining a cost of downtime for replacing the component based on a time for replacing the component and a downtime cost for the industrial machine during the time for replacing the component, a material cost in replacing the component, and an operating cost of the industrial machine associated with not replacing the component. The electronic processor is also configured to determine a replacement recommendation for the component based on the wear rate, the replacement cost, and discard criteria and output the replacement recommendation.
A system for predicting replacement of a component of an industrial machine, the system comprising:
A method for predicting replacement of a component included in an industrial machine, the method comprising:
Non-transitory, computer-readable medium storing instructions that, when executed by an electronic processor, perform a set of functions, the set of functions comprising:
Dependencies are inferred from the claim text.