Method for manufacturing concrete construction blocks for a wind-turbine tower and associated system
AssigneeSoletanche Freyssinet
InventorsNicolas Fabry, Benoit Melen, Erik Mellier
Life of this patent
Estimating the term…
Loading patent…
AssigneeSoletanche Freyssinet
InventorsNicolas Fabry, Benoit Melen, Erik Mellier
Estimating the term…
The invention has for object a method for manufacturing concrete construction blocks (6) for a wind-generator tower made up of at least two consecutive blocks secured to one another by a contact surface of each of the two blocks, the manufacturing method comprising the following steps: pouring concrete into a first cage of reinforcements (10-1) so as to obtain the first concrete construction block comprising a first contact surface (9), and pouring concrete into a second cage of reinforcements (10-2) so as to obtain the second concrete construction block, the second cage of reinforcements being provided in a form (21) arranged such that the first contact surface (9) of the first block (6-1) makes up a wall for delimiting (26) the pouring of the concrete such as to form a contact surface (9) of the second block (6-2).
A method of manufacturing concrete construction blocks for a wind-generator tower comprised of at least a first block, a second block and a third block, the first block, second block, and third block being secured to one another by a contact surface of each of the first block, second block and third block, the method comprising the following consecutive steps:
Dependencies are inferred from the claim text.