# US 10,483,889 B2 · Operation of a local alternating current network with a genset and a UPS

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 10,483,889 B2
- Document ID: US10483889B2
- Status: Granted
- Kind: B2
- Application number: 15/814,806
- Filed: 2017-11-16
- Published: 2018-03-15
- Granted: 2019-11-19
- Earliest claimed: 2015-05-19
- Assignees: Piller Group GmbH
- Applicants: Piller Group GmbH
- Inventors: Frank Herbener
- Web page: https://patentgrep.com/patent/US10483889B2

## CPC

- H02J 3/00142: {Oscillations concerning frequency}
- H02J 3/381: {Dispersed generators}
- H02J 9/062: {for AC powered loads}
- H02J 9/066: {characterised by the use of dynamo-electric machines (H02J9/08 takes precedence)}
- H02P 9/00: Arrangements for controlling electric generators for the purpose of obtaining a desired output
- H02P 9/02: Details {of the control}
- H02P 9/04: Control effected upon non-electric prime mover and dependent upon electric output value of the generator
- H02P 9/44: Control of frequency and voltage in predetermined relation, e.g. constant ratio
- H02J 2101/10: Dispersed power generation using fossil fuels, e.g. diesel generators
- H02J 2105/10: Local stationary networks having a local or delimited stationary reach
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02P: CONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS

## Abstract

A frequency of an AC voltage of an AC grid present at a genset is defined by an UPS. The frequency is altered in one direction away from a desired frequency, if a power demand increases beyond a power supply in the AC grid, and in the other direction, if the power demand falls below the power supply. An alteration of the frequency in the one direction is limited to a maximum value in that missing power is temporarily fed out of an energy storage of the UPS into the AC grid. A shift of the frequency in the one direction is kept until no more power flows out of the energy storage. The genset responds to deviations of the frequency of the AC voltage from the desired frequency in the one and the other direction by an increase and a decrease of supplied genset power, respectively.

## Claims

### Claim 1

A method of operating a local AC power grid comprising a genset which includes a combustion engine and a generator, and an uninterruptable power supply (UPS) which includes an energy storage, the method comprising
defining a frequency of an AC voltage of the AC power grid present at the genset by means of the UPS;
altering the frequency of the AC voltage defined by means of the UPS in one direction away from a desired frequency, if a present power demand in the AC power grid increases beyond a present power supply in the AC power grid, and altering the frequency of the AC voltage defined by means of the UPS in the other direction away from the desired frequency, if the present power demand falls below the present power supply in the AC power grid;
with increasing power demand of the AC power grid, limiting an alteration of the frequency of the AC voltage defined by means of the UPS in the one direction to a maximum value in that missing power is temporarily fed out of the energy storage into the AC power grid;
keeping a shift of the frequency of the AC voltage defined by means of the UPS in the one direction away from the desired frequency until no more power flows out of the energy storage into the AC power grid; and
responding to deviations of the frequency of the AC voltage of the AC power grid from the desired frequency in one direction by an increase of a genset power supplied by means of the genset, and responding to deviations of the frequency of the AC voltage of the AC power grid from the desired frequency in the other direction by a reduction of the genset power supplied by means of the genset.

### Claim 2 (depends on 1)

The method of claim 1, wherein the shift of the frequency of the AC voltage defined by means of the UPS (2) in the one direction away from the desired frequency is kept until the energy storage is recharged in a direction towards a starting charge state.

### Claim 3 (depends on 1)

The method of claim 1, wherein, with decreasing power demand of the AC power grid the alteration of the frequency of the AC voltage defined by means of the UPS in the other direction is limited to another maximum value in that excess power is temporarily fed out of the AC power grid into the energy storage, wherein a shift of the frequency of the AC voltage defined by means of the UPS in the other direction away from the desired frequency is kept until no more power flows out of the AC power grid into the energy storage.

### Claim 4 (depends on 3)

The method of claim 3, wherein the shift of the frequency of the AC voltage defined by means of the UPS in the other direction away from the desired frequency is kept until the energy storage is discharged in a direction towards a starting charge state.

### Claim 5 (depends on 3)

The method of claim 3, wherein at least one of the maximum value and the other maximum value defines at least one of a maximum difference between the frequency of the AC voltage defined by means of the UPS and the desired frequency and a maximum rate of alteration of the AC voltage of the frequency defined by means of the UPS.

### Claim 6 (depends on 1)

The method of claim 1, wherein any difference between the present power demand and the present power supply in the AC power grid is compensated for by the UPS by means of a transfer of power between the AC power grid and the energy storage, wherein the frequency of the AC voltage of the AC power grid defined by means of the UPS is adjusted to a value depending on the power transferred between the AC power grid and the energy storage.

### Claim 7 (depends on 6)

The method of claim 6, wherein a characteristic of the UPS which indicates a dependency of the frequency defined by means of the UPS on the power flowing between the AC power grid and the energy storage has a steady course between a first plateau at a maximum value of the frequency defined by means of the UPS and a second plateau at a minimum value of the frequency defined by means of the UPS.

### Claim 8 (depends on 7)

The method of claim 7, wherein the characteristic drops from a first power flowing in the energy storage to a second power flowing out of the energy storage.

### Claim 9 (depends on 6)

Method of claim 6, wherein a value to which the frequency of the AC voltage of the AC power grid defined by means of the UPS is adjusted is further dependent on a difference between a charge state of the energy storage and its starting charge state.

### Claim 10

An uninterruptable power supply (UPS) for operating a local AC power grid which, besides the UPS, comprises a genset including a combustion engine and a generator, the UPS comprising
an energy storage,
at least one connection for integrating the UPS in the AC power grid and for connecting the genset to the UPS, and
a controller which is configured to control the UPS such that the UPS
defines a frequency of an AC voltage of the AC power grid, which is present at the connection for the genset,
alters the frequency of the AC voltage in one direction from a desired frequency of the AC voltage, if a present power demand in the AC power grid increases beyond a present power supply in the AC power grid, and
alters the frequency of the AC voltage in the other direction, if the present power demand falls below the present power supply in the AC power grid,
wherein the controller is configured to limit the alteration of the frequency of the AC voltage in the one direction to a maximum value, when the power demand of the AC power grid increases, in that it controls the UPS such that the UPS temporarily feeds missing power out of the energy storage into the AC power grid, and
wherein the controller is configured to control the UPS such that the UPS keeps the frequency of the AC voltage shifted with regard to the desired frequency in the one direction away from the desired frequency until no more power flows out of the energy storage into the AC power grid.

### Claim 11 (depends on 10)

The UPS of claim 10, wherein the controller is configured to control the UPS such that the UPS keeps the frequency of the AC voltage shifted in the one direction away from the desired frequency until the energy storage has reached a starting charge state again.

### Claim 12 (depends on 10)

The UPS of claim 10, wherein the controller is configured to limit the alteration of the frequency of the AC voltage in the other direction to another maximum value, when the power demand of the AC power grid decreases, in that it controls the UPS such that the UPS temporarily feeds excess power out of the AC power grid into the energy storage, wherein the controller is configured to control the UPS such that the UPS keeps the alteration of the frequency of the AC voltage shifted in the other direction away from the desired frequency until no more power flows out of the AC power grid into the energy storage.

### Claim 13 (depends on 12)

The UPS of claim 12, wherein the controller is configured to control the UPS such that the UPS keeps the frequency of the AC voltage shifted in the other direction away from the desired frequency until the energy storage has reached a starting charge state again.

### Claim 14 (depends on 12)

The UPS of claim 12, wherein at least one of the maximum value and the other maximum value defines at least one of a maximum difference between the frequency of the AC voltage and the desired frequency and a maximum rate of alteration of the frequency of the AC voltage.

### Claim 15 (depends on 10)

The UPS of claim 10, wherein the controller is configured to control the UPS such that the UPS compensates for any difference between the present power demand and the present power supply in the AC power grid by a transfer of power between the AC power grid and the energy storage.

### Claim 16 (depends on 15)

The UPS of claim 15, wherein the controller is configured to control the UPS such that the UPS adjusts the frequency of the AC voltage of the AC power grid to a value depending on the power flowing between the AC power grid and the AC storage.

### Claim 17 (depends on 16)

The UPS of claim 16, wherein a characteristic indicating a dependency of the frequency defined by means of the UPS on the power flowing between the AC power grid and the energy storage has a steady course between a first plateau at a maximum value of the frequency defined by means of the UPS and a second plateau at a minimum value of the frequency defined by means of the UPS and drops strictly monotonically.

### Claim 18 (depends on 17)

The UPS of claim 17, wherein the characteristic drops from a first power flowing in the energy storage to a second power flowing out of the energy storage.

### Claim 19 (depends on 10)

The UPS of claim 10, wherein the controller is configured such that the value to which the UPS adjusts the frequency of the AC voltage is further dependent on a difference between a charge state and a starting charge state of the energy storage.

### Claim 20 (depends on 10)

The UPS of claim 10, wherein the controller comprises
a frequency regulator for the frequency of the AC voltage defined by means of the UPS, wherein the frequency regulator outputs a first desired power partial signal,
a charging regulator configured to keep a predetermined charge state of the energy storage, wherein the charge regulator outputs a second desired power partial signal and wherein the charging regulator has a higher time constant than the frequency regulator,
an adder which adds the first desired power partial signal and a second desired power partial signal to form a desired power signal for the energy storage, and
a frequency adjuster configured to adjust the frequency defined by means of the UPS on basis of the first desired power partial signal.
